page 535    DR-CAFTA
   (i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

40. A change to subheading 9013.90 from any other heading.

41. (A) A change to subheadings 9014.10 through 9014.80 from any other heading; or

(B) A change to subheadings 9014.10 through 9014.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

42. A change to subheading 9014.90 from any other heading.

43. (A) A change to subheadings 9015.10 through 9015.80 from any other heading; or

(B) A change to subheadings 9015.10 through 9015.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

44. (A) A change to subheading 9015.90 from any other heading; or

(B) No change in tariff classification is required, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

45. A change to heading 9016 from any other heading.

46. (A) A change to subheadings 9017.10 through 9022.90 from any other subheading; or

(B) No change in tariff classification is required, provided there is a regional value content of not less than:

(i) 30 percent when the build-up method is used, or

(ii) 35 percent when the build-down method is used.

47. A change to heading 9023 from any other heading.

48. (A) A change to subheadings 9024.10 through 9024.80 from any other heading; or

(B) A change to subheadings 9024.10 through 9024.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

49. A change to subheading 9024.90 from any other heading.
page 536    DR-CAFTA
  50. (A) A change to subheadings 9025.11 through 9025.80 from any other heading or

(B) A change to subheadings 9025.11 through 9025.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

51. A change to subheading 9025.90 from any other heading.

52. (A) A change to subheadings 9026.10 through 9026.80 from any other heading; or

(B) A change to subheadings 9026.10 through 9026.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

53. A change to subheading 9026.90 from any other heading

54. (A) A change to subheadings 9027.10 through 9027.80 from any other heading; or

(B) A change to subheadings 9027.10 through 9027.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

55. A change to subheading 9027.90 from any other heading.

56. (A) A change to subheadings 9028.10 through 9028.30 from any other heading; or

(B) A change to subheadings 9028.10 through 9028.30 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

57. A change to subheading 9028.90 from any other heading.

58. (A) A change to subheadings 9029.10 through 9029.20 from any other heading; or

(B) A change to subheadings 9029.10 through 9029.20 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

59. A change to subheading 9029.90 from any other heading.

60. A change to subheadings 9030.10 through 9030.89 from any other subheading.
page 537    DR-CAFTA
61. A change to subheading 9030.90 from any other heading.

62. (A) A change to subheadings 9031.10 through 9031.80 from any other heading; or

(B) A change to a coordinate measuring machine of subheading 9031.49 from any other good except from a base or frame for a good of the same subheading; or

(C) A change to subheadings 9031.10 through 9031.80 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

63. A change to subheading 9031.90 from any other heading.

64. (A) A change to subheadings 9032.10 through 9032.89 from any other heading; or

(B) A change to subheadings 9032.10 through 9032.89 from any other subheading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

65. A change to subheading 9032.90 from any other heading.

66. A change to heading 9033 from any other heading.

Chapter 91.

1. (A) A change to subheading 9101.11 from any other chapter; or

(B) A change to subheading 9101.11 from heading 9114, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

2. (A) A change to subheading 9101.12 from any other chapter; or

(B) A change to subheading 9101.12 from any other heading, provided that there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

3. (A) A change to subheading 9101.19 from any other chapter; or

(B) A change to subheading 9101.19 from heading 9114, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

4. (A) A change to subheading 9101.21 from any other chapter; or
page 538    DR-CAFTA
   (B) A change to subheading 9101.21 from any other heading, provided that there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

5. (A) A change to subheading 9101.29 from any other chapter; or

(B) A change to subheading 9101.29 from heading 9114, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

6. (A) A change to subheading 9101.91 from any other chapter; or

(B) A change to subheading 9101.91 from any other heading, provided that there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

7. (A) A change to subheading 9101.99 from any other chapter; or

(B) A change to subheading 9101.99 from heading 9114, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

8. (A) A change to headings 9102 through 9107 from any other chapter; or

(B) A change to headings 9102 through 9107 from heading 9114, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

9. (A) A change to headings 9108 through 9110 from any other chapter; or

(B) A change to headings 9108 through 9110 from any other heading, provided that there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

10. (A) A change to subheadings 9111.10 through 9111.80 from any other chapter; or

(B) A change to subheadings 9111.10 through 9111.80 from subheading 9111.90 or any other heading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

11. (A) A change to subheading 9111.90 from any other chapter; or
page 539    DR-CAFTA
  (B) A change to subheading 9111.90 from any other heading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

12. A change to subheading 9112.20 from subheading 9112.90 or any other heading, provided there is regional value content of not less than:

(A) 35 percent when the build-up method is used, or

(B) 45 percent when the build-down method is used.

13. (A) A change to subheading 9112.90 from any other chapter; or

(B) A change to subheading 9112.90 from any other heading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

14. (A) A change to heading 9113 from any other chapter; or

(B) A change to heading 9113 from any other heading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

15. A change to heading 9114 from any other heading.

Chapter 92.

1. (A) A change to heading 9201 from any other chapter; or

(B) A change to heading 9201 from any other heading, provided there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.

2. (A) A change to heading 9202 from any other chapter; or

(B) A change to heading 9202 from any other heading, provided that there is a regional value content of not less than:

(i) 30 percent when the build-up method is used, or

(ii) 35 percent when the build-down method is used.

3. (A) A change to headings 9203 through 9208 from any other chapter; or

(B) A change to headings 9203 through 9208 from any other heading, provided that there is a regional value content of not less than:

(i) 35 percent when the build-up method is used, or

(ii) 45 percent when the build-down method is used.