(a) In addition to the requirements of 2 CFR 200.206, the following actions may require the use of Specific Conditions as identified in 2 CFR 200.208:
(1) Has not conformed to the terms and conditions of a previous award;
(2) Has a change of control as defined in § 910.368;
(3) Fails to comply with real property and equipment requirements at § 910.360; or
(4) Is not otherwise responsible.
[80 FR 53239, Sept. 3, 2015, as amended at 87 FR 15320, Mar. 18, 2022]