You must submit the supporting information listed in the following table with the form identified in column 1 and for the approvals required under this subpart identified in columns 2 through 4:
| WPT BSEE-0126
(2 copies)
| Gas cap production
| Downhole commingling
| Production within 500-ft of a unit or lease line
|
---|
(a) Maps:
| | | | |
(1) Base map with surface, bottomhole, and completion locations with respect to the unit or lease line and the orientation of representative seismic lines or cross-sections | | ✔ | ✔ | ✔
|
(2) Structure maps with penetration point and subsea depth for each well penetrating the reservoirs, highlighting subject wells; reservoir boundaries; and original and current fluid levels | ✔ | ✔ | ✔ | ✔
|
(3) Net sand isopach with total net sand penetrated for each well, identified at the penetration point | | ✔ | ✔
| |
(4) Net hydrocarbon isopach with net feet of pay for each well, identified at the penetration point | | ✔ | ✔
| |
(b) Seismic data:
| | | | |
(1) Representative seismic lines, including strike and dip lines that confirm the structure; indicate polarity | | ✔ | ✔ | ✔
|
(2) Amplitude extraction of seismic horizon, if applicable | | ✔ | ✔ | ✔
|
(c) Logs:
| | | | |
(1) Well log sections with tops and bottoms of the reservoir(s) and proposed or existing perforations | ✔ | ✔ | ✔ | ✔
|
(2) Structural cross-sections showing the subject well and nearby wells | | ✔ | ✔ | *
|
(d) Engineering data:
| | | | |
(1) Estimated recoverable reserves for each well completion in the reservoir; total recoverable reserves for each reservoir; method of calculation; reservoir parameters used in volumetric and decline curve analysis | | † | † | ✔
|
(2) Well schematics showing current and proposed conditions | | ✔ | ✔ | ✔
|
(3) The drive mechanism of each reservoir | | ✔ | ✔ | ✔
|
(4) Pressure data, by date, and whether they are estimated or measured | | ✔ | ✔
| |
(5) Production data and decline curve analysis indicative of the reservoir performance | | ✔ | ✔
| |
(6) Reservoir simulation with the reservoir parameters used, history matches, and prediction runs (include proposed development scenario) | | * | * | *
|
(e) General information:
| | | | |
(1) Detailed economic analysis | | * | *
| |
(2) Reservoir name and whether or not it is competitive as defined under § 250.105 | | ✔ | ✔ | ✔
|
(3) Operator name, lessee name(s), block, lease number, royalty rate, and unit number (if applicable) of all relevant leases | | ✔ | ✔ | ✔
|
(4) Geologic overview of project | | ✔ | ✔ | ✔
|
(5) Explanation of why the proposed completion scenario will maximize ultimate recovery | | ✔ | ✔ | ✔
|
(6) List of all wells in subject reservoirs that have ever produced or been used for injection | | ✔ | ✔ | ✔
|
(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in § 250.125, according to the instructions in § 250.126.