The Secretary evaluates an application for a project under this program on the basis of the criteria in this section.
(a) Plan of operation. (See 34 CFR 655. 31(a))
(b) Quality of key personnel. (See 34 CFR 655.31(b))
(c) Budget and cost effectiveness. (See 34 CFR 655.31(c))
(d) Evaluation plan. (See 34 CFR 655.31(d))
(e) Adequacy of resources. (See 34 CFR 655.31(e))
(Authority: 20 U.S.C. 1124)
[47 FR 14122, Apr. 1, 1982, as amended at 70 FR 13375, Mar. 21, 2005]