The following data must be submitted with the plans required by § 170.075 if the vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter:
(a) A graph of maximum hook load versus maximum crane radius.
(b) A table of crane radius versus the maximum distance above the main deck to which the hook load can be raised.
(c) A table showing maximum vertical and transverse moments at which the crane is to operate.
source: CGD 79-023, 48 FR 51010, Nov. 4, 1983, unless otherwise noted.
cite as: 46 CFR 170.095