Regulations last checked for updates: Oct 18, 2024

Title 46 - Shipping last revised: Oct 15, 2024
§ 63.25-7 - Exhaust gas boilers.

(a) Construction. An auxiliary exhaust gas boiler must meet the applicable construction requirements of part 52 or part 53 of this subchapter as determined from table 1 to § 54.01-5 of this subchapter.

(b) Controls. Each drum type exhaust gas steam boiler must have a feed water control system. The system must automatically supply the required amount of feed water and maintain it at the proper level. For boilers without a fixed water level, the control system must supply the feed water at a rate sufficient to ensure proper heat transfer. The system must adequately fill the boiler when cold.

(c) Alarms. When a condition arises which results in inadequate heat transfer, a high temperature alarm or low flow alarm must be activated. An audible alarm must automatically sound, and a visual indicator must indicate when the fluid temperature exceeds the maximum operating temperature or when the fluid/steam flowing through the heat exchanger is insufficient to ensure proper heat transfer. Additionally, an audible alarm must automatically sound, and a visual indicator must indicate when a soot fire is present in the exhaust gas boiler's uptake.

[CGD 88-057, 55 FR 24237, June 15, 1990, as amended by USCG-2020-0634, 89 FR 50198, June 12, 2024]
authority: 46 U.S.C. 3306,3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.3
source: CGD 88-057, 55 FR 24238, June 15, 1990, unless otherwise noted.
cite as: 46 CFR 63.25-7