CustomsMobile Pro beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
Each closure to be installed in a pipeline system must comply with the 2007 ASME Boiler and Pressure Vessel Code (BPVC) (Section VIII, Division 1) (incorporated by reference, see § 195.3) and must have pressure and temperature ratings at least equal to those of the pipe to which the closure is attached.