Regulations last checked for updates: Nov 22, 2024

Title 10 - Energy last revised: Nov 19, 2024
§ 1021.200 - DOE planning.

(a) DOE shall provide for adequate and timely NEPA review of DOE proposals, including those for programs, policies, projects, regulations, orders, or legislation, in accordance with 40 CFR 1501.2 and this section. In its planning for each proposal, DOE shall include adequate time and funding for proper NEPA review and for preparation of anticipated NEPA documents.

(b) DOE shall begin its NEPA review as soon as possible after the time that DOE proposes an action or is presented with a proposal.

(c) DOE shall determine the level of NEPA review required for a proposal in accordance with § 1021.300 and subpart D of this part.

(d) During the development and consideration of a DOE proposal, DOE shall review any relevant planning and decisionmaking documents, whether prepared by DOE or another agency, to determine if the proposal or any of its alternatives are considered in a prior NEPA document. If so, DOE shall consider adopting the existing document, or any pertinent part thereof, in accordance with 40 CFR 1506.3.

§ 1021.210 - DOE decisionmaking.

(a) For each DOE proposal, DOE shall coordinate its NEPA review with its decisionmaking. Sections 1021.211 through 1021.214 of this part specify how DOE will coordinate its NEPA review with decision points for certain types of proposals (40 CFR 1505.1(b)).

(b) DOE shall complete its NEPA review for each DOE proposal before making a decision on the proposal (e.g., normally in advance of, and for use in reaching, a decision to proceed with detailed design), except as provided in 40 CFR 1506.1 and §§ 1021.211 and 1021.216 of this part.

(c) During the decisionmaking process for each DOE proposal, DOE shall consider the relevant NEPA documents, public and agency comments (if any) on those documents, and DOE responses to those comments, as part of its consideration of the proposal (40 CFR 1505.1(d)) and shall include such documents, comments, and responses as part of the administrative record (40 CFR 1505.1(c)).

(d) If an EIS or EA is prepared for a DOE proposal, DOE shall consider the alternatives analyzed in that EIS or EA before rendering a decision on that proposal; the decision on the proposal shall be within the range of alternatives analyzed in the EA or EIS (40 CFR 1505.1(e)).

(e) When DOE uses a broad decision (such as one on a policy or program) as a basis for a subsequent narrower decision (such as one on a project or other site-specific proposal), DOE may use tiering (40 CFR 1502.20) and incorporation of material by reference (40 CFR 1502.21) in the NEPA review for the subsequent narrower proposal.

§ 1021.211 - Interim actions: Limitations on actions during the NEPA process.

While DOE is preparing an EIS that is required under § 1021.300(a) of this part, DOE shall take no action concerning the proposal that is the subject of the EIS before issuing an ROD, except as provided at 40 CFR 1506.1. Actions that are covered by, or are a part of, a DOE proposal for which an EIS is being prepared shall not be categorically excluded under subpart D of these regulations unless they qualify as interim actions under 40 CFR 1506.1.

§ 1021.212 - Research, development, demonstration, and testing.

(a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs might also lead to commercialization or other broad-scale implementation by DOE or another entity.

(b) For any proposed program described in paragraph (a) of this section, DOE shall begin its NEPA review (if otherwise required by this part) as soon as environmental effects can be meaningfully evaluated, and before DOE has reached the level of investment or commitment likely to determine subsequent development or restrict later alternatives, as discussed at 40 CFR 1502.4(c)(3).

(c) For subsequent phases of development and application, DOE shall prepare one or more additional NEPA documents (if otherwise required by this part).

§ 1021.213 - Rulemaking.

(a) This section applies to regulations promulgated by DOE.

(b) DOE shall begin its NEPA review of a proposed rule (if otherwise required by this part) while drafting the proposed regulation, and as soon as environmental effects can be meaningfully evaluated.

(c) DOE shall include any relevant NEPA documents, public and agency comments (if any) on those documents, and DOE responses to those comments, as part of the administrative record (40 CFR 1505.1(c)).

(d) If an EIS is required, DOE will normally publish the draft EIS at the time it publishes the proposed rule (40 CFR 1502.5(d)). DOE will normally combine any public hearings required for a proposed rule with the public hearings required on the draft EIS under § 1021.313 of this part. The draft EIS need not accompany notices of inquiry or advance notices of proposed rulemaking that DOE may use to gather information during early stages of regulation development. When engaged in rulemaking for the purpose of protecting the public health and safety, DOE may issue the final rule simultaneously with publication of the EPA Notice of Availability of the final EIS in accordance with 40 CFR 1506.10(b).

(e) If an EA is required, DOE will normally complete the EA and issue any related FONSI prior to or simultaneously with issuance of the proposed rule; however, if the EA leads to preparation of an EIS, the provisions of paragraph (d) of this section shall apply.

§ 1021.214 - Adjudicatory proceedings.

(a) This section applies to DOE proposed actions that involve DOE adjudicatory proceedings, excluding judicial or administrative civil or criminal enforcement actions.

(b) DOE shall complete its NEPA review (if otherwise required by this part) before rendering any final adjudicatory decision. If an EIS is required, the final EIS will normally be completed at the time of or before final staff recommendation, in accordance with 40 CFR 1502.5(c).

(c) DOE shall include any relevant NEPA documents, public and agency comments (if any) on those documents, and DOE responses to those comments, as part of the administrative record (40 CFR 1505.1(c)).

§ 1021.215 - Applicant process.

(a) This section applies to actions that involve application to DOE for a permit, license, exemption or allocation, or other similar actions, unless the action is categorically excluded from preparation of an EA or EIS under subpart D of this part.

(b) The applicant shall:

(1) Consult with DOE as early as possible in the planning process to obtain guidance with respect to the appropriate level and scope of any studies or environmental information that DOE may require to be submitted as part of, or in support of, the application;

(2) Conduct studies that DOE deems necessary and appropriate to determine the environmental impacts of the proposed action;

(3) Consult with appropriate Federal, state, regional and local agencies, American Indian tribes and other potentially interested parties during the preliminary planning stages of the proposed action to identify environmental factors and permitting requirements;

(4) Notify DOE as early as possible of other Federal, state, regional, local or American Indian tribal actions required for project completion to allow DOE to coordinate the Federal environmental review, and fulfill the requirements of 40 CFR 1506.2 regarding elimination of duplication with state and local procedures, as appropriate;

(5) Notify DOE of private entities and organizations interested in the proposed undertaking, in order that DOE can consult, as appropriate, with these parties in accordance with 40 CFR 1501.2(d)(2); and

(6) Notify DOE if, before DOE completes the environmental review, the applicant plans to take an action that is within DOE's jurisdiction that may have an adverse environmental impact or limit the choice of alternatives. If DOE determines that the action would have an adverse environmental impact or would limit the choice of reasonable alternatives under 40 CFR 1506.1(a), DOE will promptly notify the applicant that DOE will take appropriate action to ensure that the objectives and procedures of NEPA are achieved in accordance with 40 CFR 1506.1(b).

(c) For major categories of DOE actions involving a large number of applicants, DOE may prepare and make available generic guidance describing the recommended level and scope of environmental information that applicants should provide.

(d) DOE shall begin its NEPA review (if otherwise required by this part) as soon as possible after receiving an application described in paragraph (a) of this section, and shall independently evaluate and verify the accuracy of information received from an applicant in accordance with 40 CFR 1506.5(a). At DOE's option, an applicant may prepare an EA in accordance with 40 CFR 1506.5(b). If an EIS is prepared, the EIS shall be prepared by DOE or by a contractor that is selected by DOE and that may be funded by the applicant, in accordance with 40 CFR 1506.5(c). The contractor shall provide a disclosure statement in accordance with 40 CFR 1506.5(c). DOE shall complete any NEPA documents (or evaluation of any EA prepared by the applicant) before rendering a final decision on the application and shall consider the NEPA document in reaching its decision, as provided in § 1021.210 of this part.

[57 FR 15144, Apr. 24, 1992, as amended at 76 FR 63787, Oct. 13, 2011]
§ 1021.216 - Procurement, financial assistance, and joint ventures.

(a) This section applies to DOE competitive and limited-source procurements, to awards of financial assistance by a competitive process, and to joint ventures entered into as a result of competitive solicitations, unless the action is categorically excluded from preparation of an EA or EIS under subpart D of this part. Paragraphs (b), (c), and (i) of this section apply as well to DOE sole-source procurements of sites, systems, or processes, to noncompetitive awards of financial assistance, and to sole-source joint ventures, unless the action is categorically excluded from preparation of an EA or EIS under subpart D of this part.

(b) When relevant in DOE's judgment, DOE shall require that offeror's submit environmental data and analyses as a discrete part of the offeror's proposal. DOE shall specify in its solicitation document the type of information and level of detail for environmental data and analyses so required. The data will be limited to those reasonably available to offerors.

(c) DOE shall independently evaluate and verify the accuracy of environmental data and analyses submitted by offerors.

(d) For offers in the competitive range, DOE shall prepare and consider an environmental critique before the selection.

(e) The environmental critique will be subject to the confidentiality requirements of the procurement process.

(f) The environmental critique will evaluate the environmental data and analyses submitted by offerors; it may also evaluate supplemental information developed by DOE as necessary for a reasoned decision.

(g) The environmental critique will focus on environmental issues that are pertinent to a decision on proposals and will include:

(1) A brief discussion of the purpose of the procurement and each offer, including any site, system, or process variations among the offers having environmental implications;

(2) A discussion of the salient characteristics of each offeror's proposed site, system, or process as well as alternative sites, systems, or processes;

(3) A brief comparative evaluation of the potential environmental impacts of the offers, which will address direct and indirect effects, short-term and long-term effects, proposed mitigation measures, adverse effects that cannot be avoided, areas where important environmental information is incomplete and unavailable, unresolved environmental issues and practicable mitigating measures not included in the offeror's proposal; and

(4) To the extent known for each offer, a list of Federal, Tribal, state, and local government permits, licenses, and approvals that must be obtained.

(h) DOE shall prepare a publicly available environmental synopsis, based on the environmental critique, to document the consideration given to environmental factors and to record that the relevant environmental consequences of reasonable alternatives have been evaluated in the selection process. The synopsis will not contain business, confidential, trade secret or other information that DOE otherwise would not disclose pursuant to 18 U.S.C. 1905,the,5.S.C. 552(b) and 41 U.S.C. 423. To assure compliance with this requirement, the synopsis will not contain data or other information that may in any way reveal the identity of offerors. After a selection has been made, the environmental synopsis shall be filed with EPA, shall be made publicly available, and shall be incorporated in any NEPA document prepared under paragraph (i) of this section.

(i) If an EA or EIS is required, DOE shall prepare, consider and publish the EA or EIS in conformance with the CEQ Regulations and other provisions of this part before taking any action pursuant to the contract or award of financial assistance (except as provided at 40 CFR 1506.1 and § 1021.211 of this part). If the NEPA process is not completed before the award of the contract, financial assistance, or joint venture, then the contract, financial assistance, or joint venture shall be contingent on completion of the NEPA process (except as provided at 40 CFR 1506.1 and § 1021.211 of this part). DOE shall phase subsequent contract work to allow the NEPA review process to be completed in advance of a go/no-go decision.

authority: 42 U.S.C. 7101
source: 57 FR 15144, Apr. 24, 1992, unless otherwise noted.
cite as: 10 CFR 1021.213