§ 806.30 - Monitoring.
The Commission, as part of the project review, shall evaluate the proposed methodology for monitoring consumptive uses, water withdrawals and mitigating flows, including flow metering devices, stream gages, and other facilities used to measure the withdrawals or consumptive use of the project or the rate of stream flow. If the Commission determines that additional flow measuring, metering or monitoring devices are required, these shall be provided at the expense of the project sponsor, installed in accordance with a schedule set by the Commission, and installed per the specifications and recommendations of the manufacturer of the device, and shall be subject to inspection by the Commission at any time.
(a) Project sponsors of projects that are approved under this part shall:
(1) Measure and record on a daily basis, or such other frequency as may be approved by the Commission, the quantity of all withdrawals, using meters or other methods approved by the Commission.
(2) Certify, at the time of installation and no less frequently than once every 5 years, the accuracy of all measuring devices and methods to within 5 percent of actual flow, unless specified otherwise by the Commission.
(3) Maintain metering or other approved methods so as to provide a continuous, accurate record of the withdrawal or consumptive use.
(4) Measure groundwater levels in all approved production and other wells, as specified by the Commission.
(5) Measure groundwater levels at additional monitoring locations, as specified by the Commission.
(6) Measure water levels in surface storage facilities, as specified by the Commission.
(7) Measure stream flows, passby flows or conservation releases, as specified by the Commission, using methods and at frequencies approved by the Commission.
(8) Perform other monitoring for impacts to water quantity, water quality and aquatic biological communities, as specified by the Commission.
(b) Reporting. (1) Project sponsors whose projects are approved under this section shall report to the Commission on a quarterly basis on forms and in a manner prescribed by the Commission all information recorded under paragraph (a) of this section, unless otherwise specified by the Commission.
(2) Project sponsors whose projects are approved under this section shall report to the Commission:
(i) Violations of withdrawal limits and any conditions of approvals, within 5 days of such violation.
(ii) Loss of measuring or recording capabilities required under paragraph (a)(1) of this section, within 5 days after any such loss.
[71 FR 78579, Dec. 29, 2006, as amended at 82 FR 29393, June 29, 2017]
§ 806.31 - Term of approvals.
(a) Approvals issued under this part shall have a term equal to the term of any accompanying member jurisdiction approval regulating the same subject matter, but not longer than 15 years, unless an alternate period is provided for in the Commission approval. If there is no such accompanying member jurisdiction approval, or if no term is specified in such accompanying member jurisdiction approval, the term of a Commission approval issued under this part shall be no longer than 15 years or the anticipated life of the project, whichever is less, unless an alternate period is provided for in the Commission approval.
(b) Commission approval of a project shall expire three years from the date of such approval if the withdrawal, diversion or consumptive use has not been commenced, unless an alternate period is provided for in the docket approval or such 3-year period is extended in writing by the Commission upon written request from the project sponsor submitted no later than 120 days prior to such expiration. The Commission may grant an extension, for a period not to exceed two years, only upon a determination that the delay is due to circumstances beyond the project sponsor's control and that there is a likelihood of project implementation within a reasonable period of time. The Commission may also attach conditions to the granting of such extensions, including modification of any terms of approval that the Commission may deem appropriate.
(c) If a withdrawal, diversion or consumptive use approved by the Commission for a project is discontinued for a period of five consecutive years, the approval shall be null and void, unless a waiver is granted in writing by the Commission, upon written request by the project sponsor demonstrating due cause and with notification thereof to the member jurisdiction in which the project is located, prior to the expiration of such period.
(d) If the Commission determines that a project has been abandoned, by evidence of nonuse for a period of time and under such circumstances that an abandonment may be inferred, the Commission may revoke the approval for such withdrawal, diversion or consumptive use.
(e) If a project sponsor submits an application to the Commission no later than six months prior to the expiration of its existing Commission docket approval or no later than one month prior to the expiration of its existing ABR or NOI approval, the existing approval will be deemed extended until such time as the Commission renders a decision on the application, unless the existing approval or a notification in writing from the Commission provides otherwise.
[71 FR 78579, Dec. 29, 2006, as amended at 82 FR 29394, June 29, 2017]
§ 806.32 - Reopening/modification.
(a) Once a project is approved, the Commission, upon its own motion, or upon petition of the project sponsor or any interested party, may at any time reopen any project approval and make additional orders or otherwise modify or impose such additional conditions that may be necessary to mitigate or avoid adverse impacts or to otherwise protect the public health, safety, and welfare or water resources. Whenever a petition for reopening is filed by an interested party, the burden shall be upon that interested party to show, by a preponderance of the evidence, that a significant adverse impact or a threat to the public health, safety and welfare or water resources exists that warrants reopening of the docket. Notwithstanding the foregoing, any petition filed by a party who previously sought the same or functionally equivalent relief identified in the petition pursuant to the administrative appeals process under § 808.2 will not be eligible for consideration by the Commission absent new facts not known or readily discernable at the time of consideration of the petitioner's previous request for administrative appeal filed pursuant to § 808.2.
(b) If the project sponsor fails to comply with any term or condition of a Commission approval, the Commission may issue an order suspending, modifying or revoking its approval of the project. The Commission may also, in its discretion, suspend, modify or revoke its approval if the project sponsor fails to obtain or maintain other federal, state or local approvals.
(c) For any previously approved project where interference occurs, the Commission may require a project sponsor to provide a temporary source of potable water at the project sponsor's expense, pending a final determination of causation by the Commission.
(d) The Commission, upon its own motion, may at any time reopen any project approval and make additional corrective modifications that may be necessary.
[71 FR 78579, Dec. 29, 2006, as amended at 74 FR 49813, Sept. 29, 2009]
§ 806.33 - Interest on fees.
The Executive Director may establish interest to be paid on all overdue or outstanding fees of any nature that are payable to the Commission.
§ 806.34 - Emergencies.
(a) Emergency certificates. The other requirements of these regulations notwithstanding, in the event of an emergency requiring immediate action to protect the public health, safety and welfare or to avoid substantial and irreparable injury to any person, property, or water resources when circumstances do not permit a review and determination in the regular course of the regulations in this part, the Executive Director, with the concurrence of the chairperson of the Commission and the commissioner from the affected member state, may issue an emergency certificate authorizing a project sponsor to take such action as the Executive Director may deem necessary and proper in the circumstances, pending review and determination by the Commission as otherwise required by this part. In the exercise of such authority, consideration should be given to actions deemed necessary to sustain human life, health and safety, or that of livestock or food, fiber or forage crops, the maintenance of electric system reliability to serve such needs, to avoid significant disruption of employment, or any other such priorities that the Commission may establish from time to time utilizing its authority under Section 11.4 of the Compact related to drought emergencies.
(b) Notification and application. A project sponsor shall notify the Commission, prior to commencement of the project, that an emergency certificate is needed. In the case of a project operating under an existing Commission approval seeking emergency approval to modify, waive or partially waive one or more conditions of such approval, notice shall be provided to the Commission prior to initiating the operational changes associated with the request. If immediate action, as defined by this section, is required by a project sponsor and prior notice to the Commission is not possible, then the project sponsor must contact the Commission within one (1) business day of the action. Notification may be by certified mail, facsimile, telegram, mailgram, electronic mail or other form of written communication. This notification must be followed within one (1) business day by submission of the following:
(1) A completed emergency application form or copy of the State or Federal emergency water use application if the project sponsor also is requesting emergency approval from either a state or federal agency.
(2) At a minimum, the application shall contain:
(i) Contact information.
(ii) Justification for emergency action (purpose).
(iii) Location map and schematic of proposed project, or in the case of a project operating under an existing Commission approval, the project approval reference and a description of the operational changes requested.
(iv) Desired term of emergency use.
(v) Source(s) of the water.
(vi) Quantity of water.
(vii) Flow measurement system (such as metering).
(viii) Use restrictions in effect (or planned).
(ix) Description of potential adverse impacts and mitigating measures.
(x) Appropriate fee, unless reduced, waived or delayed with the approval of the Executive Director.
(c) Emergency certificate issuance. The Executive Director shall:
(1) Review and act on the emergency request as expeditiously as possible upon receipt of all necessary information stipulated in paragraph (b)(2) of this section.
(2) With the concurrence of the chairperson of the Commission and the commissioner from the affected member state, issue an emergency certificate for a term not to extend beyond the next regular business meeting of the Commission where the extension of the certificate may be included in the notice for the next regularly scheduled public hearing for that business meeting.
(3) Include conditions in the emergency certificate which may include, without limitation, monitoring of withdrawal and/or consumptive use amounts, measurement devices, public notification, and reporting, to assure minimal adverse impacts to the environment and other users.
(d) Post approval. Actions following issuance of emergency certificates may include, but are not limited to, the following:
(1) The Commission may, by resolution, extend the term of the emergency certificate, upon presentation of a request from the project sponsor accompanied by appropriate evidence that the conditions causing the emergency persist.
(2) If the condition is expected to persist longer than the specified extended term, the project sponsor must submit an application to the Commission for applicable water withdrawal or consumptive use, or the emergency certificate will terminate as specified. If the project sponsor has a prior Commission approval for the project, the project sponsor must submit an application to modify the existing docket accordingly.
(e) Early termination. With the concurrence of the chairperson of the Commission and the commissioner from the affected member state, the Executive Director may terminate an emergency certificate earlier than the specified duration if it is determined that an emergency no longer exists and/or the certificate holder has not complied with one or more special conditions for the emergency withdrawal or consumptive water use.
(f) Restoration or mitigation. Project sponsors are responsible for any necessary restoration or mitigation of environmental damage or interference with another user that may occur as a result of the emergency action.
[71 FR 78579, Dec. 29, 2006, as amended at 79 FR 15909, Mar. 24, 2014; 86 FR 52970, Sept. 24, 2021]
§ 806.35 - Fees.
Project sponsors shall have an affirmative duty to pay such fees as established by the Commission to cover its costs of administering the regulatory program established by this part, including any extraordinary costs associated with specific projects.
[71 FR 78579, Dec. 29, 2006, as amended at 75 FR 60622, Oct. 1, 2010]
authority: Secs. 3.4, 3.5 (5), 3.8, 3.10, and 15.2, Pub. L. 91-575, 84 Stat. 1509,
source: 71 FR 78579, Dec. 29, 2006, unless otherwise noted.
cite as: 18 CFR 806.35