Regulations last checked for updates: Nov 25, 2024

Title 24 - Housing and Urban Development last revised: Nov 13, 2024
§ 905.300 - Capital fund submission requirements.

(a) General. Unless otherwise stated, the requirements in this section apply to both qualified PHAs (as described in § 903.3(c) of this chapter) and nonqualified PHAs. Each PHA must complete a comprehensive physical needs assessment (PNA).

(1) Applicability. Small PHAs (PHAs that own or operate fewer than 250 public housing units) must comply with the requirements of this section beginning 30 days after the end of the federal fiscal year quarter following HUD's publication of a notice in the Federal Register.

(2) [Reserved]

(b) Capital Fund program submission requirements. At the time that the PHA submits the ACC Amendment(s) for its Capital Fund Grants(s) to HUD, the PHA must also submit the following items:

(1) CFP 5-Year Action Plan. (i) Content. The CFP 5-Year Action Plan must describe the capital improvements necessary to ensure long-term physical and social viability of the PHA's public housing developments, including the capital improvements to be undertaken within the 5-year period, their estimated costs, status of environmental review, and any other information required for participation in the CFP, as prescribed by HUD. In order to be entitled to fungibility, PHA's must have an approved 5-year Action Plan. Except in the case of emergency/disaster work, the PHA shall not spend Capital Funds on any work that is not included in an approved CFP 5-Year Action Plan and its amendments.

(ii) Budget. The Capital Fund Budget for each of the 5 years shall be prepared by a PHA using the form(s) prescribed by HUD. Work items listed in the budget must include, but are not limited to, the following:

(A) Where a PHA has an approved Capital Fund Financing Program (CFFP) loan, debt service payments for the grants from which the payments are scheduled;

(B) Where a PHA has an approved CFFP loan, the PHA shall also include all work and costs, including debt service payments, in the CFP 5-Year Action Plan. Work associated with the use of financing proceeds will be reported separately in a form and manner prescribed by HUD; or

(C) Work affecting health and safety and compliance with regulatory requirements such as section 504 of the Rehabilitation Act of 1973 and HUD's implementing regulations at 24 CFR part 8, and the lead-based paint poisoning prevention standards at 24 CFR part 35, before major systems (e.g., heating, roof, etc.) and other costs of lower priority.

(iii) PHA Criteria for Significant Amendment or Modification. The PHA must include in the basic criteria that the PHA will use for determining a significant amendment or modification to the CFP 5-Year Action Plan. In addition to the criteria established by the PHA, for the purpose of the CFP, a proposed demolition, disposition, homeownership, Capital Fund financing, development, or mixed-finance proposal are considered significant amendments to the CFP 5-Year Action Plan.

(iv) Submission. The PHA must submit a Board-approved CFP 5-Year Action Plan at least once every 5 years. The PHA may choose to update its CFP 5-Year Action Plan every year. The PHA shall indicate whether its CFP 5-Year Action Plan is fixed or rolling. Prior to submission to HUD, the 5-Year Action Plan must have been approved by the PHA's Board of Commissioners. In any given year that a PHA does not have a CFP 5-Year Action Plan that is approved by the PHA Board of Commissioners and HUD, the Capital Fund grant(s) for these PHAs will be reserved and obligated; however, the PHA will not have access to those funds until its CFP 5-Year Action Plan is approved by the PHA Board of Commissioners and HUD.

(v) Significant amendments or modification to the CFP 5 Year Action Plan. PHAs making significant amendments or modifications to the CFP 5-Year Action Plan, as defined in paragraph (b)(1)(iii) of this section, must follow the requirements of this section.

(A) A PHA after submitting its 5-Year Action Plan may amend or modify the plan. If the amendment or modification is a significant amendment or modification, as defined in paragraph (b)(1)(iii) of this section, the PHA:

(1) May not adopt the amendment or modification until the PHA has duly called a meeting of its Board of Commissioners (or similar governing body) and the meeting at which the amendment or modification is adopted, is open to the public; and

(2) May not implement the amendment or modification until notification of the amendment or modifications are provided to HUD and approved by HUD in accordance with HUD's plan review procedures, as provided in paragraph (b)(6) of this section.

(B) Each significant amendment or modification to a plan submitted to HUD is subject to the requirement of paragraph (b)(3) of this section.

(2) Certifications required for receipt of Capital Fund grants. The PHA is also required to submit various certifications to HUD, in a form prescribed by HUD, including, but not limited to:

(i) Certification of PIC Data;

(ii) Standard Form—Disclosure of Lobbying Activities;

(iii) Civil Rights Compliance, in a form prescribed by HUD; and

(iv) Certification of Compliance with Public Hearing Requirements.

(3) Conduct of public hearing and Resident Advisory Board Consultation. A PHA must annually conduct a public hearing and consult with the Resident Advisory Board (RAB) of the PHA to discuss the Capital Fund submission. The PHA may elect to conduct a separate annual public hearing in order to solicit public comments or to hold the annual public hearing at the same time as the hearing for the Annual PHA Plan, the 5-Year Plan, or the required annual hearing for qualified public housing authorities. The hearing must be conducted at a location that is convenient to the residents served by the PHA.

(i) Not later than 45 days before the public hearing is to take place, the PHA must:

(A) Make the Capital Fund submission along with the material required under this paragraph (b) available to the residents and the RAB; and

(B) Publish a notice informing the public that the information is available for review and inspection; that a public hearing will take place on the plan; and of the date, time, and location of the hearing.

(C) PHAs shall conduct reasonable outreach activities to encourage broad public participation in the review of the Capital Fund submission.

(4) Public and RAB comments. The PHA must consider the comments from the residents, the public, and the RAB on the Capital Fund submission, or any significant modification thereto. In submitting the final CFP 5-Year Action Plan to HUD for approval, or any significant amendment or modification to the 5-Year Action Plan to HUD for approval, the PHA must include a copy of the recommendations made by the RAB(s) and a description of the manner in which the PHA addressed these recommendations.

(5) Consistency with Consolidated Plan. The Capital Fund submission must be consistent with any applicable Consolidated Plan.

(6) HUD review and approval. The CFP submission requirements must meet the requirements of this part as well as the Public Housing Program Requirements as defined in § 905.108 of this part. A PHA is required to revise or correct information that is not in compliance, and HUD has the authority to impose administrative sanctions until the appropriate revisions are made. HUD will review the CFP submission requirements to determine whether:

(i) All of the information that is required to be submitted is included;

(ii) The information is consistent with the needs identified in the PNA and data available to HUD; and

(iii) There are any issues of compliance with applicable laws, regulations, or contract requirements that have not been addressed with the proposed use of the Capital Fund.

(7) Time frame for submission of CFP requirements. The requirements identified in this paragraph (b) must be submitted to HUD, in a format prescribed by HUD, at the time that the PHA submits its signed CF ACC Amendment.

(8) Performance and Evaluation Report. (i) All PHAs must prepare a CFP Annual Statement/Performance and Evaluation Report at a time and in a format prescribed by HUD. These reports shall be retained on file for all grants for which a final Actual Modernization Cost Certificate (AMCC) or an Actual Development Cost Certificate (ADCC) has not been submitted. A final Performance and Evaluation Report must be submitted in accordance with 24 CFR 905.322, at the time the PHA submits its AMCC or ADCC.

(ii) PHAs that are designated as troubled performers under PHAS (24 CFR part 902) or as troubled under the Section 8 Management Assessment Program (SEMAP) (24 CFR part 985), and/or were identified as noncompliant with section 9(j) obligation and expenditure requirements during the fiscal year, shall submit their CFP Annual Statement/Performance and Evaluation Reports to HUD for review and approval.

(iii) All other PHAs, that are not designated as troubled performers under PHAS and are not designated as troubled under SEMAP, and that were in compliance with section 9(j) obligation and expenditure requirements during the fiscal year, shall prepare a CFP Annual Statement/Performance and Evaluation report for all open grants and shall retain the report(s) on file at the PHA, to be available to HUD upon request.

(9) Moving to Work (MTW) PHAs. MTW PHAs are to submit the Capital Fund submissions as part of the MTW Plan annually, as required by the MTW Agreement.

(c)-(d) [Reserved]

§ 905.302 - Timely submission of the CF ACC amendment by the PHA.

Upon being provided with a CF ACC Amendment from HUD, the PHA must sign and date the CF ACC Amendment and return it to HUD by the date established. HUD will execute the signed and dated CF ACC Amendment submitted by the PHA. If HUD does not receive the signed and dated Amendment by the submission deadline, the PHA will receive the Capital Fund grant for that year; however, it will have less than 24 months to obligate 90 percent of the Capital Fund grant and less than 48 months to expend these funds because the PHA's obligation start date and disbursement end date for these grants will remain as previously established by HUD.

§ 905.304 - CF ACC term and covenant to operate.

(a) Period of obligation to operate as public housing. The PHA shall operate all public housing projects in accordance with the CF ACC, as amended, and applicable HUD regulations, for the statutorily prescribed period. These periods shall be evidenced by a recorded DOT on all public housing property. If the PHA uses Capital Funds to develop public housing or to modernize existing public housing, the CF ACC term and the covenant to operate those projects are as follows:

(1) Development activities. Each public housing project developed using Capital Funds shall establish a restricted use covenant, either in the DOT or as a Declaration of Restrictive Covenants, to operate under the terms and conditions applicable to public housing for a 40-year period that begins on the date on which the project becomes available for occupancy, as determined by HUD.

(2) Modernization activities. For PHAs that receive Capital Fund assistance, the execution of each new CF ACC Amendment establishes an additional 20-year period that begins on the latest date on which modernization is completed, except that the additional 20-year period does not apply to a project that receives Capital Fund assistance only for management improvements.

(3) Operating Fund. Any public housing project developed that receives Operating Fund assistance shall have a covenant to operate under requirements applicable to public housing for a 10-year period beginning upon the conclusion of the fiscal year for which such amounts were provided, except for such shorter period as permitted by HUD by an exception.

(b) Mortgage or security interests. The PHA shall not allow any mortgage or security interest in public housing assets, including under section 30 of the 1937 Act (42 U.S.C. 1437z-2), without prior written approval from HUD. PHAs that undertake financing unsecured by public housing assets shall include the following nonrecourse language in all financing documents as follows:

“This financing is non-recourse to any public housing property (real or personal property including all public housing assets or income), or disposition proceeds approved pursuant to Section 18 of the United States Housing Act of 1937 (unless explicitly permitted by HUD in the Section 18 approval letter).”

(c) Applicability of latest expiration date. All public housing subject to this part or required by law shall be maintained and operated as public housing, as prescribed, until the latest expiration date provided in section 9(d)(3) of the 1937 Act (42 U.S.C. 1437g(d)(3)) or any other provision of law or regulation mandating the operation of the housing as public housing, or under terms and conditions applicable to public housing, for a specified period of time.

§ 905.306 - Obligation and expenditure of Capital Fund grants.

(a) Obligation. A PHA shall obligate each Capital Fund grant, including formula grants, Replacement Housing Factor (RHF) grants, Demolition and Disposition Transitional Funding (DDTF) grants, and natural disaster grants, no later than 24 months after, and emergency grants no later than 12 months after, the date on which the funds become available to the PHA for obligation, except as provided in paragraphs (c) and (d) of this section. However, a PHA with unobligated funds from a grant shall disregard this requirement for up to not more than 10 percent of the originally allocated funds from that grant. The funds become available to the PHA when HUD executes the CF ACC Amendment. With HUD approval, and subject to the availability of appropriations, the PHA can accumulate RHF grants for up to 5 years or until it has adequate funds to undertake replacement housing. The PHA shall obligate 90 percent of the RHF grant within 24 months from the date that the PHA accumulates adequate funds, except as provided in paragraph (c) of this section.

(b) Items and costs. For funds to be considered obligated, all items and costs must meet the definition of “obligation” in § 905.108 of this part.

(c) Extension to obligation requirement. The PHA may request an extension of the obligation deadline, and HUD may grant an extension for a period of up to 12 months, based on:

(1) The size of the PHA;

(2) The complexity of the CFP of the PHA;

(3) Any limitation on the ability of the PHA to obligate the amounts allocated for the PHA from the Capital Fund in a timely manner as a result of state or local law; or

(4) Any other factors that HUD determines to be relevant.

(d) HUD extension for other reasons. HUD may extend the obligation deadline for a PHA for such a period as HUD determines to be necessary, if HUD determines that the failure of the PHA to obligate assistance in a timely manner is attributable to:

(1) Litigation;

(2) Delay in obtaining approvals from the Federal Government or a state or local government that is not the fault of the PHA;

(3) Compliance with environmental assessment and abatement requirements;

(4) Relocating residents;

(5) An event beyond the control of the PHA; or

(6) Any other reason established by HUD by notice in the Federal Register.

(e) Failure to obligate. (1) For any month during the fiscal year, HUD shall withhold all new Capital Fund grants from any PHA that has unobligated funds in violation of paragraph (a) of this section. The penalty will be imposed once the violations of paragraph (a) are known. The PHA may cure the noncompliance by:

(i) Requesting in writing that HUD recapture the unobligated balance of the grant; or

(ii) Continuing to obligate funds for the grant in noncompliance until the noncompliance is cured.

(2) After the PHA has cured the noncompliance, HUD will release the withheld Capital Fund grant(s) minus a penalty of one-twelfth of the grant for each month of noncompliance.

(f) Expenditure. The PHA shall expend all grant funds within 48 months after the date on which funds become available, as described in paragraph (a) of this section. The deadline to expend funds may be extended only by the period of time of a HUD-approved extension of the obligation deadline. No other extensions of the expenditure deadline will be granted. All funds not expended will be recaptured.

§ 905.308 - Federal requirements applicable to all Capital Fund activities.

(a) The PHA shall comply with the requirements of 24 CFR part 5 (General HUD Program Requirements; Waivers), 2 CFR part 200, and this part.

(b) The PHA shall also comply with the following program requirements.

(1) Nondiscrimination and equal opportunity. The PHA shall comply with all applicable nondiscrimination and equal opportunity requirements, including, but not limited to, the Department's generally applicable nondiscrimination and equal opportunity requirements at 24 CFR 5.105(a) and the Architectural Barriers Act of 1968 (42 U.S.C. 4151 et seq.), and its implementing regulations at 24 CFR parts 40 and 41. The PHA shall affirmatively further fair housing in its use of funds under this part, which includes, but is not limited to, addressing modernization and development in the completion of requirements at 24 CFR 903.7(o).

(2) Environmental requirements. All activities under this part are subject to an environmental review by a responsible entity under HUD's environmental regulations at 24 CFR part 58 and must comply with the requirements of the National Environmental Policy Act of 1969 (NEPA)(42 U.S.C. 4321 et seq.) and the related laws and authorities listed at 24 CFR 58.5. HUD may make a finding in accordance with 24 CFR 58.11 and may perform the environmental review itself under the provisions of 24 CFR part 50. In those cases where HUD performs the environmental review under 24 CFR part 50, it will do so before approving a proposed project, and will comply with the requirements of NEPA and the related requirements at 24 CFR 50.4.

(3) Wage rates. (i) Davis-Bacon wage rates. For all work or contracts exceeding $2,000 in connection with development activities or modernization activities (except for nonroutine maintenance work, as defined in § 905.200(b)(5) of this part), all laborers and mechanics employed on the construction, alteration, or repair shall be paid not less than the wages prevailing in the locality, as determined by the Secretary of Labor pursuant to the Davis-Bacon Act (40 U.S.C. 3142).

(ii) HUD-determined wage rates. For all operations work and contracts, including routine and nonroutine maintenance work (as defined in § 905.200(b)(5) of this part), all laborers and mechanics employed shall be paid not less than the wages prevailing in the locality, as determined or adopted by HUD pursuant to section 12(a) of the 1937 Act, 42 U.S.C. 1437j(a).

(iii) State wage rates. Preemption of state prevailing wage rates as provided at 24 CFR 965.101.

(iv) Volunteers. The prevailing wage requirements of this section do not apply to volunteers performing development, modernization, or nonroutine maintenance work under the conditions set out in 24 CFR part 70.

(4) Technical wage rates. All architects, technical engineers, draftsmen, and technicians (other than volunteers under the conditions set out in 24 CFR part 70) employed in a development or modernization project shall be paid not less than the wages prevailing in the locality, as determined or adopted (subsequent to a determination under applicable state or local law) by HUD.

(5) Lead-based paint poisoning prevention. The PHA shall comply with the Lead-Based Paint Poisoning Prevention Act (LPPPA) (42 U.S.C. 4821 et seq.), the Residential Lead-Based Paint Hazard Reduction Act (42 U.S.C. 4851 et seq.), and the Lead Safe Housing Rule and the Lead Disclosure Rule at 24 CFR part 35.

(6) Fire safety. A PHA shall comply with the requirements of section 31 of the Federal Fire Prevention and Control Act of 1974 (15 U.S.C. 2227).

(7) Flood insurance and floodplain requirements. The PHA will not engage in the acquisition, construction, or improvement of a public housing project located in an area that has been identified by the FEMA as having special flood hazards, unless:

(i) The requirements of 24 CFR part 55, Floodplain Management, have been met, including a determination by a responsible entity under 24 CFR part 58 or by HUD under 24 CFR part 50 that there is no practicable alternative to locating in an area of special flood hazards and the minimization of unavoidable adverse impacts;

(ii) Flood insurance on the building is obtained in compliance with the Flood Disaster Protection Act of 1973 (42 U.S.C. 4001 et seq.); and

(iii) The community in which the area is situated is participating in the National Flood Insurance Program in accordance with 44 CFR parts 59 through 79, or less than one year has passed since FEMA notification regarding flood hazards.

(8) Coastal barriers. In accordance with the Coastal Barriers Resources Act (16 U.S.C. 3501 et seq.), no financial assistance under this part may be made available within the Coastal Barrier Resources System.

(9) Displacement, relocation, and real property acquisition. All acquisition or rehabilitation activities carried out under the Capital Fund, including acquisition of any property for development, shall comply with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (URA) (42 U.S.C. 4601-4655) and with implementing regulations at 49 CFR part 24. Demolition or disposition under section 18 of the 1937 Act, 42 U.S.C. 1437p,is.21.

(10) Procurement and contract requirement. PHAs and their contractors shall comply with section 3 of the Housing and Community Development Act of 1968 (12 U.S.C. 1701u) and HUD's implementing rules at 24 CFR part 75.

[78 FR 63770, Oct. 24, 2013, as amended at 80 FR 75942, Dec. 7, 2015; 85 FR 61568, Sept. 29, 2020]
§ 905.310 - Disbursements from HUD.

(a) The PHA shall initiate a fund requisition from HUD only when funds are due and payable, unless HUD approves another payment schedule as authorized by 2 CFR 200.305.

(b) The PHA shall maintain detailed disbursement records to document eligible expenditures (e.g., contracts or other applicable documents), in a form and manner prescribed by HUD.

[78 FR 63770, Oct. 24, 2013, as amended at 80 FR 75942, Dec. 7, 2015]
§ 905.312 - Design and construction.

The PHA shall meet the following design and construction standards, as applicable, for all development and modernization.

(a) Physical structures shall be designed, constructed, and equipped to be consistent with the neighborhoods they occupy; meet contemporary standards of modest design, comfort, and livability (see also § 905.202(c) of this part); promote security; promote energy conservation; and be attractive so as to harmonize with the community.

(b) All development projects shall be designed and constructed in compliance with:

(1) A national building code, such as those developed by the International Code Council or the National Fire Protection Association; and the IECC or ASHRAE 90.1-2010 (both incorporated by reference, see § 905.110 of this part), for multifamily high-rises (four stories or higher), or a successor energy code or standard that has been adopted by HUD pursuant to 42 U.S.C. 12709 or other relevant authority;

(2) Applicable state and local laws, codes, ordinances, and regulations;

(3) Other federal requirements, including fire protection and safety standards implemented under section 31 of the Fire Administration Authorization Act of 1992, 15 U.S.C. 2227 and HUD minimum property standards (e.g., 24 CFR part 200, subpart S);

(4) Accessibility Requirements as required by section 504 of the Rehabilitation Act (29 U.S.C. 794) and implementing regulations at 24 CFR part 8; title II of the Americans with Disabilities Act (42 U.S.C. 12101 et seq.) and implementing regulations at 28 CFR part 35; and, if applicable, the Fair Housing Act (42 U.S.C. 3601-3619) and implementing regulations at 24 CFR part 100; and

(5) Occupancy of high-rise elevator structures by families with children. Pursuant to 42 U.S.C. 1437d(a), a high-rise elevator structure shall not be provided for families with children regardless of density, unless the PHA demonstrates and HUD determines that there is no practical alternative.

(c) All modernization projects shall be designed and constructed in compliance with:

(1) The modernization standards as prescribed by HUD;

(2) Accessibility requirements as required by section 504 of the Rehabilitation Act (29 U.S.C. 794) and implementing regulations at 24 CFR part 8; title II of the Americans with Disabilities Act (42 U.S.C. 12101 et seq.) and implementing regulations at 28 CFR part 35; and, if applicable, the Fair Housing Act (42 U.S.C. 3601-3619) and implementing regulations at 24 CFR part 100; and

(3) Cost-effective energy conservation measures, identified in the PHA's most recently updated energy audit.

(d) Pursuant to the Energy Policy Act of 2005, in purchasing appliances, PHAs shall purchase appliances that are Energy Star products or Federal Energy Management Program designed products, unless the PHA determines that the purchase of these appliances is not cost effective.

(e) Broadband infrastructure. Any new construction or substantial rehabilitation, as substantial rehabilitation is defined in 24 CFR 5.100, of a building with more than 4 rental units and funded by a grant awarded or Capital Funds allocated after January 19, 2017 must include installation of broadband infrastructure, as this term is also defined in 24 CFR 5.100, except where the PHA determines and, in accordance with § 905.326, documents the determination that:

(1) The location of the new construction or substantial rehabilitation makes installation of broadband infrastructure infeasible;

(2) The cost of installing broadband infrastructure would result in a fundamental alteration in the nature of its program or activity or in an undue financial burden; or

(3) The structure of the housing to be rehabilitated makes installation of broadband infrastructure infeasible.

[78 FR 63773, Oct. 24, 2013, as amended at 81 FR 92639, Dec. 20, 2016]
§ 905.314 - Cost and other limitations.

(a) Eligible administrative costs. Where the physical or management improvement costs will benefit programs other than Public Housing, such as the Housing Choice Voucher program or local revitalization programs, eligible administrative costs are limited to the amount directly attributable to the public housing program.

(b) Maximum project cost. The maximum project cost represents the total amount of public housing capital assistance used in connection with the development of a public housing project, and includes:

(1) Project costs that are subject to the TDC limit (i.e., HCC and Community Renewal Costs); and

(2) Project costs that are not subject to the TDC limit (i.e., Additional Project Costs). The total project cost to be funded with public housing capital assistance, as set forth in the proposal and as approved by HUD, becomes the maximum project cost stated in the ACC Amendment. Upon completion of the project, the actual project cost is determined based upon the amount of public housing capital assistance expended for the project, and this becomes the maximum project cost for purposes of the ACC Amendment.

(c) TDC limit. (1) Public housing funds, including Capital Funds, may not be used to pay for HCC and Community Renewal Costs in excess of the TDC limit, as determined under paragraph (b)(2) of this section. However, HOPE VI grantees will be eligible to request a TDC exception for public housing and HOPE VI funds awarded in FFY 1996 and prior years. PHAs may also request a TDC exception for integrated utility management, capital planning, and other capital and management activities that promote energy conservation and efficiency. HUD will examine the request for TDC exceptions to ensure that they would be cost-effective, so as to ensure that up-front expenditures subject to the exceptions would be justified by future cost savings.

(2) Determination of TDC limit. HUD will determine the TDC limit for a public housing project as follows:

(i) Step 1: Unit construction cost guideline. HUD will first determine the applicable “construction cost guideline” by averaging the current construction costs as listed in two nationally recognized residential construction cost indices for publicly bid construction of a good and sound quality for specific bedroom sizes and structure types. The two indices HUD will use for this purpose are the R.S. Means cost index for construction of “average” quality and the Marshall & Swift cost index for construction of “good” quality. HUD has the discretion to change the cost indices to other such indices that reflect comparable housing construction quality through a notice published in the Federal Register.

(ii) Step 2: Bedroom size and structure types. The construction cost guideline is then multiplied by the number of units for each bedroom size and structure type.

(iii) Step 3: Elevator and nonelevator type structures. HUD will then multiply the resulting amounts from step 2 by 1.6 for elevator type structures and by 1.75 for nonelevator type structures.

(iv) Step 4: TDC limit. The TDC limit for a project is calculated by adding the resulting amounts from step 3 for all the public housing units in the project.

(3) Costs not subject to the TDC limit. Additional project costs are not subject to the TDC limit.

(4) Funds not subject to the TDC limit. A PHA may use funding sources not subject to the TDC limit (e.g., Community Development Block Grant (CDBG) funds, low-income housing tax credits, private donations, private financing, etc.) to cover project costs that exceed the TDC limit or the HCC limit described in this paragraph (c). Such funds, however, may not be used for items that would result in substantially increased operating, maintenance, or replacement costs, and must meet the requirements of section 102 of the Department of Housing and Urban Development Reform Act of 1989 (Pub. L. 101-235, approved December 15, 1989) (42 U.S.C. 3545). These funds must be included in the project development cost budget.

(d) Housing Construction Costs (HCC). (1) General. A PHA may not use Capital Funds to pay for HCC in excess of the amount determined under paragraph (d)(2) of this section.

(2) Determination of HCC limit. HUD will determine the HCC limit as listed in at least two nationally recognized residential construction cost indices for publicly bid construction of a good and sound quality for specific bedroom sizes and structure types. The two indices HUD will use for this purpose are the R.S. Means cost index for construction of “average” quality and the Marshal & Swift cost index for construction of “good” quality. HUD has the discretion to change the cost indices to other such indices that reflect comparable housing construction quality through a notice published in the Federal Register. The resulting construction cost guideline is then multiplied by the number of public housing units in the project, based upon bedroom size and structure type. The HCC limit for a project is calculated by adding the resulting amounts for all public housing units in the project.

(3) The HCC limit is not applicable to the acquisition of existing housing, whether or not such housing will be rehabilitated. The TDC limit is applicable to such acquisition.

(e) Community Renewal Costs. Capital Funds may be used to pay for Community Renewal Costs in an amount equivalent to the difference between the HCC paid for with public housing capital assistance and the TDC limit.

(f) Rehabilitation of existing public housing projects. The HCC limit is not applicable to the rehabilitation of existing public housing projects. The TDC limit for modernization of existing public housing is 90 percent of the TDC limit as determined under paragraph (c) of this section. This limitation does not apply to the rehabilitation of any property acquired pursuant to § 905.600 of this part.

(g) Modernization cost limits. If the modernization costs are more than 90 percent of the TDC, then the project shall not be modernized. Capital Funds shall not be expended to modernize an existing public housing development that fails to meet the HUD definition of reasonable cost found in § 905.108 of this part, except for:

(1) Emergency work;

(2) Essential maintenance necessary to keep a public housing project habitable until the demolition or disposition application is approved; or

(3) The costs of maintaining the safety and security of a site that is undergoing demolition.

(h) Administrative cost limits and Capital Fund Program Fee. (1) Administrative cost limits (for non-asset-management PHAs). The PHA shall not budget or expend more than 10 percent of its annual Capital Fund grant on administrative costs, in accordance with the CFP 5-Year Action Plan.

(2) Capital Fund Program Fee (for asset-management PHAs). For a PHA that is under asset management, the Capital Fund Program Fee and administrative cost limits are the same. For the Capital Fund Program Fee, a PHA may charge a management fee of up to 10 percent of the annual CFP formula grant(s) amount, excluding emergency and disaster grants and also excluding any costs related to lead-based paint or asbestos testing, in-house architectural and engineering work, or other special administrative costs required by state or local law.

(i) Modernization. The PHA shall not budget or expend more than 10 percent of its annual Capital Fund grant on administrative costs, in accordance with its CFP 5-Year Action Plan. The 10 percent limit excludes any costs related to lead-based paint or asbestos testing, in-house Architectural and Engineering work, or other special administrative costs required by state or local law.

(ii) Development. For development work with Capital Fund and RHF grants, the administrative cost limit is 3 percent of the total project budget, or, with HUD's approval, up to 6 percent of the total project budget.

(i) Management improvement cost limits. In Fiscal Year (FY) 2014, a PHA shall not use more than 18 percent of its annual Capital Fund grant for eligible management improvement costs identified in its CFP 5-Year Action Plan. In FY 2015, a PHA shall not use more than 16 percent of its annual Capital Fund grant for eligible management improvement costs identified in its CFP 5-Year Action Plan. In FY 2016, a PHA shall not use more than 14 percent of its annual Capital Fund grant for eligible management improvement costs identified in its CFP 5-Year Action Plan. In FY 2017, a PHA shall not use more than 12 percent of its annual Capital Fund grant for eligible management improvement costs identified in its CFP 5-Year Action Plan. In FY 2018 and thereafter, a PHA shall not use more than 10 percent of its annual Capital Fund grant for eligible management improvement costs identified in its CFP 5-Year Action Plan. Management improvements are an eligible expense for PHAs participating in asset management.

(j) Types of labor. A PHA may use force account labor for development and modernization activities if included in a CFP 5-Year Action Plan that is approved by the PHA Board of Commissioners and HUD. HUD approval to use force account labor is not required when the PHA is designated as a high performer under PHAS.

(k) RMC activities. When the entire development, financing, or modernization activity, including the planning and architectural design, is administered by an RMC, the PHA shall not retain any portion of the Capital Funds for any administrative or other reason, unless the PHA and the RMC provide otherwise by contract.

(l) Capital Funds for operating costs. A PHA may use Capital Funds for operating costs only if it is included in the CFP 5-Year Action Plan that is approved by the PHA Board of Commissioners and HUD, and limited as described in paragraphs (l)(1) and (2) of this section. Capital Funds identified in the CFP 5-Year Action Plan to be transferred to operations are obligated once the funds have been budgeted and drawn down by the PHA. Once such transfer of funds occurs, the PHA must follow the requirements of 24 CFR part 990 with respect to those funds.

(1) Large PHAs. A PHA with 250 or more units may use no more than 20 percent of its annual Capital Fund grant for activities that are eligible under the Operating Fund at 24 CFR part 990.

(2) Small PHAs. A PHA with less than 250 units, that is not designated as troubled under PHAS, may use up to 100 percent of its annual Capital Fund grant for activities that are eligible under the Operating Fund at 24 CFR part 990, except that the PHA must have determined that there are no debt service payments, significant Capital Fund needs, or emergency needs that must be met prior to transferring 100 percent of its funds to operating expenses.

§ 905.316 - Procurement and contract requirements.

(a) General. PHAs shall comply with 2 CFR part 200, and HUD implementing instructions, for all capital activities including modernization and development, except as provided in paragraph (c) in this section.

(b) Contracts. The PHA shall use all contract forms prescribed by HUD. If a form is not prescribed, the PHA may use any Office of Management and Budget (OMB) approved form that contains all applicable federal requirements and contract clauses.

(c) Mixed-finance development projects. Mixed-finance development partners may be selected in accordance with 24 CFR 905.604(h). Contracts and other agreements with mixed-finance development partners must specify that they comply with the requirements of §§ 905.602 and 905.604 of this part.

(d) Assurances of completion. Notwithstanding 24 CFR 85.36 (as revised April 1, 2013), for each construction contract over $100,000, the contractor shall furnish the PHA with the following:

(1) A bid guarantee from each bidder, equivalent to 5 percent of the bid price; and

(2) One of the following:

(i) A performance bond and payment bond for 100 percent of the contract price;

(ii) A performance bond and a payment bond, each for 50 percent or more of the contract price;

(iii) A 20 percent cash escrow;

(iv) A 10 percent irrevocable letter of credit with terms acceptable to HUD, or

(v) Any other payment method acceptable to HUD.

(e) Procurement of recovered materials. PHAs that are state agencies and agencies of a political subdivision of a state that are using assistance under this part for procurement, and any person contracting with such PHAs with respect to work performed under an assisted contract, must comply with the requirements of section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. In accordance with section 6002, these agencies and persons must procure items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered material practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired in the preceding fiscal year exceeded $10,000; must procure solid waste management services in a manner that promotes energy and resource recovery; and must have established an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.

[78 FR 63770, Oct. 24, 2013, as amended at 80 FR 75942, Dec. 7, 2015]
§ 905.318 - Title and deed.

The PHA, or, in the case of mixed-finance, the Owner Entity, shall obtain title insurance that guarantees the title is good and marketable before taking title to any and all sites and properties acquired with public housing funds. Immediately upon taking title to a property, the PHA or Owner Entity shall record the deed and a Declaration of Trust or, in the case of mixed finance, a Declaration of Restrictive Covenants, in the form and in the manner and order prescribed by HUD. The PHA shall at all times maintain a recorded Declaration of Trust or Declaration of Restrictive Covenants in the form and in the manner and order prescribed by HUD on all public housing projects covering the term required by this part.

§ 905.320 - Contract administration and acceptance of work.

(a) Contract administration. The PHA is responsible, in accordance with 2 CFR part 200, subpart D, for all contractual and administrative issues arising out of their procurements. The PHA shall maintain full and complete records on the history of each procurement transaction.

(b) Inspection and acceptance. The PHA, or, in the case of mixed finance, the Owner Entity shall carry out inspections of work in progress and goods delivered, as necessary, to ensure compliance with existing contracts. If, upon inspection, the PHA determines that the work and/or goods are complete, satisfactory and, as applicable, otherwise undamaged, except for any work that is appropriate for delayed completion, the PHA shall accept the work. The PHA shall determine any holdback for items of delayed completion and the amount due and payable for the work that has been accepted, including any conditions precedent to payment that are stated in the construction contract or contract of sale. The contractor shall be paid for items only after the PHA inspects and accepts that work.

(c) Guarantees and warranties. The PHA or, in the case of mixed finance, the Owner Entity, shall specify the guaranty period and amounts to be withheld, as applicable, and shall provide that all contractor, manufacturer, and supplier warranties required by the construction and modernization documents shall be assigned to the PHA. The PHA shall inspect each dwelling unit and the overall project approximately 3 months after the beginning of the project guaranty period, 3 months before its expiration, and at other times as may be necessary to exercise its rights before expiration of any warranties. The PHA shall require repair or replacement of all defective items prior to the expiration of the guaranty or warranty periods.

(d) Notification of completion. The PHA, or in the case of mixed finance, the Owner Entity, shall require that all contractors and developers notify the PHA in writing when the contract work, including any approved off-site work, will be completed and ready for inspection.

[78 FR 63770, Oct. 24, 2013, as amended at 80 FR 75942, Dec. 7, 2015]
§ 905.322 - Fiscal closeout.

(a) General. Each Capital Fund grant and/or development project is subject to fiscal closeout. Fiscal closeout includes the submission of a cost certificate; an audit, if applicable; a final Performance and Evaluation Report; and HUD approval of the cost certificate.

(b) Submission of cost certificate. (1) When an approved development or modernization activity is completed or when HUD terminates the activity, the PHA must submit to HUD the:

(i) Actual Development Cost Certificate (ADCC) within 12 months. For purposes of the CF ACC, costs incurred between the completion of the development and the date of full availability (DOFA) becomes the actual development cost; and

(ii) Actual Modernization Cost Certificate (AMCC) for each grant, no later than 12 months after the expenditure deadline but no earlier than the obligation end date. A PHA with under 250 units with an approved CFP 5-Year Action Plan for use of 100 percent of the Capital Fund grant in operations may submit the cost certificate any time after the funds have been budgeted to operations and withdrawn, as described in § 905.314(l) of this part.

(2) If the PHA does not submit the cost certificate and the final CFP Annual Statement/Performance and Evaluation Report within the period prescribed in this section, HUD may impose restrictions on open Capital Fund grants; e.g., establish review thresholds, set the grant to “auto review” (HUD automatically reviews it on a periodic basis), or suspend grants, until the cost certificate for the affected grant is submitted. These restrictions may be imposed by HUD after notification of the PHA.

(c) Audit. The cost certificate is a financial statement subject to audit pursuant to 2 CFR part 200, subpart F. After submission of the cost certificate to HUD, the PHA shall provide the cost certificate to its independent public auditor (IPA) as part of its annual audit. After audit, the PHA will notify HUD of the grants included in the audit, any exceptions noted by the PHA auditor, and the schedule to complete corrective actions recommended by the auditor.

(d) Review and approval. For PHAs exempt from the audit requirements, HUD will review and approve the cost certificate based on available information regarding the Capital Fund grant. For PHAs subject to an audit, HUD will review the information from the annual audit provided by the PHA and approve the certificate after all exceptions, if any, have been resolved.

(e) Recapture. All Capital Funds in excess of the actual cost incurred for the grant are subject to recapture. Any funds awarded to the PHA that are returned or any funds taken back from the PHA in a fiscal year after the grant was awarded are subject to recapture.

[78 FR 63770, Oct. 24, 2013, as amended at 80 FR 75942, Dec. 7, 2015]
§ 905.324 -

The PHA shall provide, at minimum, the following data reports, at a time and in a form prescribed by HUD:

(a) The Performance and Evaluation Report as described in § 905.300(b)(8) of this part;

(b) Updates on the PHA's building and unit data as required by HUD;

(c) Reports of obligation and expenditure; and

(d) Any other information required for participation in the Capital Fund Program.

§ 905.326 - Records.

(a) The PHA will maintain full and complete records of the history of each Capital Fund grant, including, but not limited to, CFP 5-Year Action Plans, procurement, contracts, obligations, and expenditures.

(b) The PHA shall retain for 5 years after HUD approves either the actual development or modernization cost certificate all documents related to the activities for which the Capital Fund grant was received, unless a longer period is required by applicable law.

(c) HUD and its duly authorized representatives shall have full and free access to all PHA offices, facilities, books, documents, and records, including the right to audit and make copies.

authority: 42 U.S.C. 1437g,42.S.C. 1437z-2, 42 U.S.C. 1437z-7,and
source: 65 FR 14426, Mar. 16, 2000, unless otherwise noted.
cite as: 24 CFR 905.306