Regulations last checked for updates: Oct 17, 2024

Title 24 - Housing and Urban Development last revised: Sep 16, 2024
§ 983.51 - Proposal and project selection procedures.

(a) General procedures for submission and selection. The PHA Administrative Plan must describe the procedures for submission and selection of PBV proposals under the methods of competitive selection in paragraph (b) of this section and selection of projects under an exception to competitive selection under paragraph (c) of this section. The description must include under what circumstances the PHA will use the selection methods described in paragraphs (b) and (c) of this section. The PHA may allow for entities that have site control to submit proposals provided the entity will be the owner prior to entering into the Agreement or HAP contract. Before selecting a PBV proposal or project, the PHA must determine that the PBV proposal or project complies with HUD program regulations and requirements, including a determination that the property is eligible housing (§§ 983.52 and 983.53), complies with the cap on the number of PBV units per project (§ 983.54), and meets the site selection standards (§ 983.55). An owner may submit, and a PHA may select, a single proposal covering multiple projects where each project consists of a single-family building, provided all projects are the same housing type (existing, rehabilitated, or newly constructed).

(b) Methods of competitive selection. The PHA must select PBV proposals in accordance with the selection procedures in the PHA Administrative Plan. (See paragraph (f) of this section for information about the selection of PHA-owned units.) The PHA must select PBV proposals by either of the following two methods:

(1) The PHA may issue a request for proposals (RFP), selecting a PBV proposal through a competition. The PHA's RFP may not limit proposals to a single site or impose restrictions that explicitly or practically preclude owner submission of proposals for PBV housing on different sites. A PHA may establish selection procedures in the Administrative Plan that combine or are in conjunction with other Federal, State, or local government housing assistance, community development, or supportive services competitive selection processes. If the PHA selection process is combined and administered in conjunction with another RFP process, the PHA remains responsible for complying with § 983.51. See § 983.157(a)(2) for additional requirements for an RFP for rehabilitated housing.

(2) The PHA may select, without issuing an RFP, a proposal for housing assisted under a Federal, State, or local government housing assistance, community development, or supportive services program that required competitive selection of proposals, where the proposal has been selected in accordance with such program's competitive selection requirements within three years of the PBV proposal selection date. The PHA may not select a housing assistance proposal using this method if the competition involved any consideration that the project would receive PBV assistance.

(c) Exceptions to competitive selection. Prior to selection under this paragraph (c), the PHA must notify the public of its intent to noncompetitively select one or more projects for PBV assistance through its 5-Year Plan.

(1) A PHA engaged in an initiative to improve, develop, or replace a public housing property or site may select for PBV assistance an existing, newly constructed, or rehabilitated project in which the PHA has an ownership interest or over which the PHA has control without following a competitive process.

(i) With respect to replacement housing, the PHA does not have to replace the housing on the same site as the original public housing, but the number of contract units in the replacement project may not exceed the number of units in the original public housing project by more than a de minimis amount for this exception to apply.

(ii) The public housing properties or sites may be in the public housing inventory at the time of project selection or they may have been removed from the public housing inventory through any available legal removal tool within five years of the project selection date.

(2) A PHA may select for future PBV assistance a project currently under the public housing program, or a project that is replacing the public housing project, in which a PHA has no ownership interest, or which a PHA has no control over, without following a competitive process, provided:

(i) The public housing project is either still in the public housing inventory or had been removed from the public housing inventory through any available legal removal tool within five years of the project selection date;

(ii) The PHA that owned or owns the public housing project does not administer the HCV program;

(iii) The project selected for PBV assistance was specifically identified as replacement housing for the impacted public housing residents as part of the public housing demolition/disposition application, voluntary conversion application, or any other application process submitted to and approved by HUD to remove the public housing project from the public housing inventory; and

(iv) With respect to replacement housing, the PHA does not have to replace the housing on the same site as the original public housing, but the number of contract units in the replacement project may not exceed the number of units in the original public housing project by more than a de minimis amount for this exception to apply.

(3) A PHA may select for PBV assistance a project consisting of PHA-owned units as defined at 24 CFR 982.4 without following a competitive process.

(i) The project units must continue to meet the definition of PHA-owned for the initial two years of the HAP contract unless there is a transfer of ownership approved by HUD.

(ii) The PHA must meet any conditions with respect to selection for PBV assistance of a project consisting of PHA-owned units without following a competitive process as may be established by HUD through publication in the Federal Register notice after providing opportunity for public comment.

(4) A PHA may select for PBV assistance a project that underwent an eligibility event within five years of the project selection date, in which a family (or families) qualifies for enhanced voucher assistance under Section 8(t) of the Act and provides informed consent to relinquish its enhanced voucher for PBV assistance, without following a competitive process.

(d) Public notice of PHA request for PBV proposals. If the PHA will be selecting proposals under paragraph (b)(1) of this section, PHA procedures for selecting PBV proposals must be designed and actually operated to provide broad public notice of the opportunity to offer PBV proposals for consideration by the PHA. The public notice procedures may include publication of the public notice in a local newspaper of general circulation and other means designed and actually operated to provide broad public notice. The public notice of the PHA request for PBV proposals must specify the submission deadline. Detailed application and selection information must be provided at the request of interested parties.

(e) Inspections required prior to proposal or project selection. (1) The PHA must examine the proposed site before the proposal or project selection date to determine whether the site complies with the site selection standards in accordance with § 983.55.

(2) The PHA may execute a HAP contract for existing housing if:

(i) All proposed contract units in the project fully or substantially comply with the HQS on the proposal or project selection date, which the PHA must determine via inspection;

(ii) The project meets the environmental review requirements at § 983.56, if applicable;

(iii) The project meets the initial inspection requirements in accordance with § 983.103(c).

(f) PHA written notice of proposal or project selection. (1) For selection of proposals through competitive methods under paragraph (b) of this section, the PHA must give prompt written notice of proposal selection to the party that submitted a selected proposal and must also give prompt public notice of such selection. The PHA's requirement to provide public notice may be met via publication of the public notice in a local newspaper of general circulation or other means designed and actually operated to provide broad public notice. The written notice of proposal selection must require the owner or party that submitted the selected proposal to provide a written response to the PHA accepting the terms and requirements stated in the notice.

(2) For selection of projects through exceptions to competition under paragraph (c) of this section, the PHA must give prompt written notice of project selection to the owner following the PHA board's resolution approving the project-basing of assistance at the specific project. The written notice of project selection must require the owner of the project selected to provide a written response to the PHA accepting the terms and requirements stated in the notice.

(3) Regardless of the method of selection, if the project contains PHA-owned units that are not owned by a separate legal entity from the PHA, the PHA must provide the written notice of proposal or project selection to the responsible PHA official, and that official must certify in writing that the PHA accepts the terms and requirements stated in the notice.

(4) When an environmental review is required, if such a review has not been conducted prior to the project or proposal selection date, the PHA's written notice of project or proposal selection must state that the selection is subject to completion of a favorable environmental review and that the project or proposal may be rejected based on the results of the environmental review in accordance with 983.56(c).

(5) See § 983.153(c)(3) for additional notice requirements for newly constructed housing and rehabilitated housing.

(g) Proposal or project selection date. (1) The proposal selection date is the date on which the PHA provides written notice to the party that submitted the selected proposal under either paragraph (b)(1) or (2) of this section.

(2) For properties selected in accordance with § 983.51(c), the project selection date is the date of the PHA's board resolution approving the project-basing of assistance at the specific project.

(h) PHA-owned units. A PHA-owned unit may be assisted under the PBV program only if the HUD field office or the independent entity reviews the project selection process the PHA undertook and determines that the project was appropriately selected based on the selection procedures specified in the PHA Administrative Plan. Under no circumstance may a HAP contract be effective for any of the subsidized housing types set forth in § 983.53(a). With the exception of projects selected in accordance with § 983.51(c), the PHA's selection procedures must be designed in a manner that does not effectively eliminate the submission of proposals for non-PHA-owned units or give preferential treatment (e.g., additional points) to PHA-owned units.

(i) Public review of PHA selection decision documentation. The PHA must make documentation available for public inspection regarding the basis for the PHA selection of a PBV proposal.

(j) Previous participation clearance. HUD approval of specific projects or owners is not required. For example, owner proposal selection does not require submission of form HUD-2530 (Previous Participation Certification) or other HUD previous participation clearance.

(k) Excluded from Federal procurement. A PHA may not commit project-based assistance to a project if the owner or any principal or interested party is debarred, suspended subject to a limited denial of participation, or otherwise excluded under 2 CFR part 2424 or is listed on the U.S. General Services Administration list of parties excluded from Federal procurement or non-procurement programs.

[89 FR 38309, May 7, 2024, as amended at 89 FR 46020, May 28, 2024]
§ 983.52 - Prohibition of assistance for ineligible units.

(a) Ineligible unit. A HAP contract must not be effective and no PBV assistance may be provided for any of the following:

(1) Shared housing;

(2) Units on the grounds of a penal, reformatory, medical, mental, or similar public or private institution;

(3) Nursing homes or facilities providing continuous psychiatric, medical, nursing services, board and care, or intermediate care. However, the PHA may execute a HAP contract and provide PBV assistance for a dwelling unit in an assisted living facility that provides home health care services such as nursing and therapy for residents of the housing;

(4) Units that are owned or controlled by an educational institution or its affiliate and are designated for occupancy by students of the institution;

(5) Manufactured homes are ineligible only if the manufactured home is not permanently affixed to a permanent foundation or the owner does not own fee title to the real property (land) on which the manufactured home is located; and

(6) Transitional Housing.

(b) Prohibition against assistance for owner-occupied unit. A HAP contract must not be effective and no PBV assistance may be provided for a unit occupied by an owner of the housing. A member of a cooperative who owns shares in the project assisted under the PBV program shall not be considered an owner for purposes of participation in the PBV program.

(c) Prohibition against selecting unit occupied by an ineligible family. Before a PHA places a specific unit under a HAP contract, the PHA must determine whether the unit is occupied and, if occupied, whether the unit's occupants are eligible for assistance in accordance with § 982.201 of this title. Additionally, for a family to be eligible for assistance in the specific unit, the unit must be appropriate for the size of the family under the PHA's subsidy standards and the total tenant payment for the family must be less than the gross rent for the unit, such that the unit will be eligible for a monthly HAP. The PHA must not enter into a HAP contract for a unit occupied by a family ineligible for participation in the PBV program.

(d) Prohibition against assistance for units for which commencement of construction or rehabilitation occurred in violation of program requirements. Unless a PHA has exercised the discretion at § 983.154(f), to undertake development activity without an Agreement or to execute an Agreement after construction or rehabilitation that complied with applicable requirements of § 983.153 has commenced, or at § 983.157, to undertake development activity after execution of the HAP contract, the PHA may not execute a HAP contract for units on which construction or rehabilitation commenced after the date of proposal submission (for housing subject to competitive selection) or the date of the PHA's board resolution approving the project-basing of assistance at the project (for housing excepted from competitive selection) and prior to the effective date of an Agreement. At HUD's sole discretion, HUD may approve a PHA's request for an exception to this prohibition. In determining whether to approve the PHA request, HUD will consider appropriate factors, including the nature and extent of the construction or rehabilitation that has commenced.

(1) Units for which rehabilitation or new construction began after proposal submission or the date of board resolution but prior to the effective date of an Agreement (if applicable), as described in this paragraph (d), do not subsequently qualify as existing housing.

(2) Units that were newly constructed or rehabilitated in violation of program requirements do not qualify as existing housing.

§ 983.53 - Prohibition of assistance for units in subsidized housing.

(a) Types of subsidized housing prohibited from receiving PBV assistance. A HAP contract must not be effective and no PBV assistance may be provided for any of the following:

(1) A public housing dwelling unit;

(2) A unit subsidized with any other form of Section 8 assistance (tenant-based or project-based);

(3) A unit subsidized with any governmental rent subsidy (a subsidy that pays all or any part of the rent);

(4) A unit subsidized with any governmental subsidy that covers all or any part of the operating costs of the housing;

(5) A unit subsidized with rental assistance payments under Section 521 of the Housing Act of 1949, 42 U.S.C. 1490a (a Rural Housing Service Program). However, the PHA may attach assistance for a unit subsidized with Section 515 interest reduction payments (42 U.S.C. 1485);

(6) A Section 202 project for non-elderly persons with disabilities (assistance under Section 162 of the Housing and Community Development Act of 1987, 12 U.S.C. 1701q note);

(7) Section 811 project-based supportive housing for persons with disabilities (42 U.S.C. 8013);

(8) Section 202 supportive housing for the elderly (12 U.S.C. 1701q);

(9) A unit subsidized with any form of tenant-based rental assistance (as defined at 24 CFR 982.1(b)(2)) (e.g., a unit subsidized with tenant-based rental assistance under the HOME program, 42 U.S.C. 12701 et seq.); or

(10) A unit with any other duplicative Federal, State, or local housing subsidy, as determined by HUD or by the PHA in accordance with HUD requirements. For this purpose, “housing subsidy” does not include the housing component of a welfare payment; a social security payment; or a Federal, State, or local tax concession (such as relief from local real property taxes).

(b) [Reserved]

§ 983.54 - Cap on number of PBV units in each project (income-mixing requirement).

(a) Project cap. Except as provided in paragraph (b) or (c) of this section, a PHA may not select a proposal to provide PBV assistance or enter into an Agreement or HAP contract if the number of assisted units in a project is more than the greater of 25 percent of the number of dwelling units (assisted and unassisted, as adjusted as provided in paragraph (c)(3)) in the project or 25 units.

(b) Higher project cap. A PHA may provide PBV assistance to the greater of 25 units or 40 percent of the number of dwelling units (assisted and unassisted, as adjusted as provided in paragraph (c)(3) of this section) in the project if the project is located in an area where vouchers are difficult to use as defined in § 983.3.

(c) Exceptions to the project cap. (1) A project is not limited to a single exception category but may include excepted units from any of the exception categories under paragraph (2) and excluded units under paragraph (3) below.

(2) PBV units are not counted toward the project cap in the following cases:

(i) Units exclusively serving elderly families, as defined in 24 CFR 5.403;

(ii) Units exclusively made available to eligible youth described in Section 8(x)(2)(B) of the U.S. Housing Act. If the units exclusively made available to eligible youth use Family Unification Program (FUP) assistance that is normally available for eligible families and youth, the PHA must determine that the limitation of the units to youth is consistent with the local housing needs of both eligible FUP populations (families and youth), maintain documentation to support this determination, and amend its Administrative Plan to include the limitation of these FUP PBV units to eligible youth; or

(iii) Units exclusively made available to households eligible for supportive services available to the residents of the project assisted with PBV assistance. The project must make supportive services available to all PBV-assisted families in the project, but the family may not be required to participate in the services as a condition of living in the excepted unit. Such supportive services need not be provided by the owner or on-site but must be reasonably available to the families receiving PBV assistance in the project and designed to help the families in the project achieve self-sufficiency or live in the community as independently as possible. The supportive services must be made available to the family within a reasonable time as defined by the PHA, but not to exceed 120 calendar days from the family's request. The PHA must include in its Administrative Plan the types of services offered to families that will enable the units to qualify under the exception and the extent to which such services will be provided (e.g., length of time services will be provided to a family, frequency of services, and depth of services), and the reasonable time by which such services must be made available to the family, not to exceed 120 calendar days. A PHA that manages an FSS program may offer FSS to meet the exception. The PHA may also make the supportive services used in connection with the FSS program available to non-FSS PBV families at the project.

(3) Units that are excluded under § 983.59 do not count toward the project cap. Such units are removed from the number of dwelling units for purposes of calculating the percentages under paragraphs (a) and (b) of this section.

(4)(i) The PBV HAP contract must specify, and the owner must set aside, the number of excepted units made available for occupancy by families who qualify for the exception.

(ii) For a unit to be considered excepted it must be occupied by a family who qualifies for the exception.

(d) HAP contracts already in effect. (1) In general, HAP contracts in effect prior to April 18, 2017, when the exception at paragraph (c)(2)(iii) of this section came into effect and a prior exception for disabled families was removed, or prior to December 27, 2020, when the exception at paragraph (c)(2)(ii) of this section came into effect, are governed by those HAP contracts' terms concerning the number and type of excepted units in a project. The owner must continue to designate the same number of contract units and assist the same number and type of excepted units as provided under the HAP contract during the remaining term of the HAP contract and any extension.

(2) The owner and the PHA may mutually agree to change the requirements for excepted units under the HAP contract to comply with the excepted unit requirements in subsection (c) of this section. However, any change to the HAP contract may only be made if the change does not jeopardize an assisted family's eligibility for continued assistance at the project.

(e) PHA determination. The PHA determines the number of units in the project for which the PHA will provide project-based assistance, including whether and how many units will be excepted, subject to the provisions of this section. See § 983.262 for occupancy requirements of excepted units.

(f) HUD monitoring. HUD may establish additional monitoring and oversight requirements for PBV projects in which more than 40 percent of the dwelling units are assisted under a PBV HAP contract through a Federal Register Notice, subject to public comment.

§ 983.55 - Site selection standards.

(a) Applicability. The site selection requirements in paragraph (d) of this section apply only to site selection for existing housing and rehabilitated PBV housing. The site selection requirements in paragraph (e) of this section apply only to site selection for newly constructed PBV housing. Other provisions of this section apply to selection of a site for any form of PBV housing, including existing housing, newly constructed housing, and rehabilitated housing.

(b) Compliance with PBV goals, civil rights requirements, and site and neighborhood standards. The PHA may not select a project or proposal for existing, newly constructed, or rehabilitated PBV housing on a site or enter into an Agreement or HAP contract for units on the site, unless the PHA has determined that:

(1) Project-based assistance for housing at the selected site is consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities. The standard for deconcentrating poverty and expanding housing and economic opportunities must be consistent with the PHA Plan under 24 CFR part 903 and the PHA Administrative Plan. In developing the standards to apply in determining whether a proposed PBV development will be selected, a PHA must consider the following:

(i) Whether the census tract in which the proposed PBV development will be located is in a HUD-designated Enterprise Zone, Economic Community, or Renewal Community;

(ii) Whether a PBV development will be located in a census tract where the concentration of assisted units will be or has decreased as a result of public housing demolition;

(iii) Whether the census tract in which the proposed PBV development will be located is undergoing significant revitalization;

(iv) Whether State, local, or Federal dollars have been invested in the area that has assisted in the achievement of the statutory requirement;

(v) Whether new market rate units are being developed in the same census tract where the proposed PBV development will be located and the likelihood that such market rate units will positively impact the poverty rate in the area;

(vi) If the poverty rate in the area where the proposed PBV development will be located is greater than 20 percent, the PHA must consider whether in the past five years there has been an overall decline in the poverty rate;

(vii) Whether there are meaningful opportunities for educational and economic advancement in the census tract where the proposed PBV development will be located.

(2) The site is suitable from the standpoint of facilitating and furthering full compliance with the applicable provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d-2000d(4)) and HUD's implementing regulations at 24 CFR part 1; Title VIII of the Civil Rights Act of 1968 (42 U.S.C. 3601-3629) and HUD's implementing regulations at 24 CFR parts 100 through 199; Executive Order 11063 (27 FR 11527; 3 CFR, 1959-1963 Comp., p. 652) and HUD's implementing regulations at 24 CFR part 107. The site must also be suitable from the standpoint of facilitating and furthering full compliance with the applicable provisions of the Americans with Disabilities Act (42 U.S.C. 12131-12134) and implementing regulations (28 CFR part 35), and Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and HUD's implementing regulations at 24 CFR part 8, including meeting the Section 504 site selection requirements described in 24 CFR 8.4(b)(5).

(3) The site and neighborhood is reasonably free from disturbing noises and reverberations and other dangers to the health, safety, and general welfare of the occupants. The site and neighborhood may not be subject to serious adverse environmental conditions, natural or manmade, that could affect the health or safety of the project occupants, such as dangerous walks or steps; contamination; instability; flooding, poor drainage, septic tank back-ups or sewage hazards; mudslides; abnormal air pollution, smoke or dust; excessive noise, vibration or vehicular traffic; excessive accumulations of trash; vermin or rodent infestation; or fire hazards.

(c) PHA PBV site selection policy. (1) The PHA Administrative Plan must establish the PHA's policy for selection of PBV sites in accordance with this section.

(2) The site selection policy must explain how the PHA's site selection procedures promote the PBV goals.

(3) The PHA must select PBV sites in accordance with the PHA's site selection policy in the PHA Administrative Plan.

(d) Existing and rehabilitated housing site and neighborhood standards. A site for existing or rehabilitated housing must meet the following site and neighborhood standards. The site must:

(1) Be adequate in size, exposure, and contour to accommodate the number and type of units proposed, and adequate utilities and streets must be available to service the site. (The existence of a private disposal system and private sanitary water supply for the site, approved in accordance with law, may be considered adequate utilities.)

(2) Promote greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons.

(3) Be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services that are at least equivalent to those typically found in neighborhoods consisting largely of unassisted, standard housing of similar market rents.

(4) Be so located that travel time and cost via public transportation or private automobile from the neighborhood to places of employment providing a range of jobs for lower-income workers is not excessive. While it is important that housing for the elderly not be totally isolated from employment opportunities, this requirement need not be adhered to rigidly for such projects.

(e) New construction site and neighborhood standards. A site for newly constructed housing must meet the following site and neighborhood standards:

(1) The site must be adequate in size, exposure, and contour to accommodate the number and type of units proposed, and adequate utilities (water, sewer, gas, and electricity) and streets must be available to service the site.

(2) The site must not be located in an area of minority concentration, except as permitted under paragraph (e)(3) of this section, and must not be located in a racially mixed area if the project will cause a significant increase in the proportion of minority to non-minority residents in the area.

(3) A project may be located in an area of minority concentration only if:

(i) Sufficient, comparable opportunities exist for housing for minority families in the income range to be served by the proposed project outside areas of minority concentration (see paragraphs (e)(3)(iii) through (v) of this section for further guidance on this criterion); or

(ii) The project is necessary to meet overriding housing needs that cannot be met in that housing market area (see paragraph (e)(3)(vi) of this section for further guidance on this criterion).

(iii) As used in paragraph (e)(3)(i) of this section, “sufficient” does not require that in every locality there be an equal number of assisted units within and outside of areas of minority concentration. Rather, application of this standard should produce a reasonable distribution of assisted units each year, that, over a period of several years, will approach an appropriate balance of housing choices within and outside areas of minority concentration. An appropriate balance in any jurisdiction must be determined in light of local conditions affecting the range of housing choices available for low-income minority families and in relation to the racial mix of the locality's population.

(iv) Units may be considered “comparable opportunities,” as used in paragraph (e)(3)(i) of this section, if they have the same household type (elderly, disabled, family, large family) and tenure type (owner/renter); require approximately the same tenant contribution towards rent; serve the same income group; are located in the same housing market; and are in standard condition.

(v) Application of this sufficient, comparable opportunities standard involves assessing the overall impact of HUD-assisted housing on the availability of housing choices for low-income minority families in and outside areas of minority concentration, and must take into account the extent to which the following factors are present, along with other factors relevant to housing choice:

(A) A significant number of assisted housing units are available outside areas of minority concentration.

(B) There is significant integration of assisted housing projects constructed or rehabilitated in the past 10 years, relative to the racial mix of the eligible population.

(C) There are racially integrated neighborhoods in the locality.

(D) Programs are operated by the locality to assist minority families that wish to find housing outside areas of minority concentration.

(E) Minority families have benefited from local activities (e.g., acquisition and write-down of sites, tax relief programs for homeowners, acquisitions of units for use as assisted housing units) undertaken to expand choice for minority families outside of areas of minority concentration.

(F) A significant proportion of minority households has been successful in finding units in non-minority areas under the tenant-based assistance programs.

(G) Comparable housing opportunities have been made available outside areas of minority concentration through other programs.

(vi) Application of the “overriding housing needs” criterion, for example, permits approval of sites that are an integral part of an overall local strategy for the preservation or restoration of the immediate neighborhood and of sites in a neighborhood experiencing significant private investment that is demonstrably improving the economic character of the area (a “revitalizing area”). An “overriding housing need,” however, may not serve as the basis for determining that a site is acceptable, if the only reason the need cannot otherwise be feasibly met is that discrimination on the basis of race, color, religion, sex, national origin, age, familial status, or disability renders sites outside areas of minority concentration unavailable or if the use of this standard in recent years has had the effect of circumventing the obligation to provide housing choice.

(4) The site must promote greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons.

(5) The neighborhood must not be one that is seriously detrimental to family life or in which substandard dwellings or other undesirable conditions predominate, unless there is actively in progress a concerted program to remedy the undesirable conditions.

(6) The housing must be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services that are at least equivalent to those typically found in neighborhoods consisting largely of unassisted, standard housing of similar market rents.

(7) Except for housing designed for elderly persons, travel time and cost via public transportation or private automobile from the neighborhood to places of employment providing a range of jobs for lower-income workers, must not be excessive.

§ 983.56 - Environmental review.

(a) HUD environmental regulations. (1) HUD environmental regulations at 24 CFR parts 50 and 58 apply to activities under the PBV program, except as provided in paragraph (a)(2) of this section.

(2) For projects or proposals that were selected in accordance with the site selection standards at § 983.55 in effect on or after June 6, 2024, no environmental review is required to be undertaken before entering into a HAP contract for existing housing, except to the extent a Federal environmental review is required by law or regulation relating to funding other than PBV housing assistance payments.

(b) Who performs the environmental review? Under 24 CFR part 58, the unit of general local government within which the project is located that exercises land use responsibility, the county, or the State (the “responsible entity” or “RE”), is responsible for the Federal environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and related applicable Federal laws and authorities in accordance with 24 CFR 58.5 and 58.6. If a PHA objects in writing to having the RE perform the Federal environmental review, or if the RE declines to perform it, then HUD may perform the review itself (24 CFR 58.11). 24 CFR part 50 governs HUD performance of the review.

(c) Notice of applicability. When an environmental review is required, if such a review has not been conducted prior to the proposal or project selection date, then the PHA's written notice of proposal or project selection must state that the selection is subject to completion of a favorable environmental review and that the project may be rejected based on the results of the environmental review.

(d) Environmental review limitations. When an environmental review is required, a PHA may not execute an Agreement or HAP contract with an owner, and the PHA, the owner, and its contractors may not acquire, rehabilitate, convert, lease, repair, dispose of, demolish, or construct real property or commit or expend program or local funds for these activities, until one of the following occurs:

(1) The responsible entity has determined that the activities to be undertaken are exempt under 24 CFR 58.34(a) or categorically excluded and not subject to compliance with environmental laws under 24 CFR 58.35(b);

(2) The responsible entity has completed the environmental review procedures required by 24 CFR part 58, and HUD has approved the PHA's Request for Release of Funds and Certification (form HUD-7015.15). HUD approves the Request for Release of Funds and Certification by issuing a Letter to Proceed or form HUD-7015.16, thereby authorizing the PHA to execute an Agreement or HAP contract, as applicable; or

(3) HUD has performed an environmental review under 24 CFR part 50 and has notified the PHA in writing of environmental clearance.

(e) Environmental review restrictions. HUD will not issue a Letter to Proceed or form HUD-7015.16 to the PHA or provide environmental clearance if the PHA, the owner, or its contractors have undertaken any of the activities described in paragraph (d) of this section.

(f) Mitigating measures. The PHA must document any mitigating measures or other conditions as provided in 24 CFR part 50 or 58, as applicable, and must complete or require the owner to carry out such measures and conditions.

(g) PHA duty to supply information. The PHA must supply all available, relevant information necessary for the RE (or HUD, if applicable) to perform the required environmental review.

§ 983.57 - PHA-owned units.

(a) Selection of PHA-owned units. The selection of PHA-owned units must be done in accordance with § 983.51(h).

(b) Independent entity functions. In connection with PHA-owned units:

(1) The independent entity must determine rent to owner, including rent reasonableness and calculating any rent adjustments by an OCAF (where applicable), in accordance with §§ 983.301 through 983.305.

(2) The independent entity must perform unit inspections in accordance with § 983.103(g).

(3) When the owner carries out development activity under § 983.152 or substantial improvement under §§ 983.207(d) or 983.212, the independent entity must review the evidence and work completion certification submitted by the owner in accordance with § 983.155(b) and determine if the units are complete in accordance with § 983.156.

(4) The independent entity must determine whether to approve substantial improvement to units under a HAP contract in accordance with § 983.212.

(c) Payment to independent entity. The PHA may compensate the independent entity from PHA administrative fees (including fees credited to the administrative fee reserve) for the services performed by the independent entity. The PHA may not use other program receipts to compensate the independent entity for such services. The PHA and the independent entity may not charge the family any fee or charge for the services provided by the independent entity.

§ 983.58 - PHA determination prior to selection.

(a) Analysis of units and budget. A PHA must calculate the number of authorized voucher units that it is permitted to project-base in accordance with § 983.6 and determine the amount of budget authority that it has available for project-basing in accordance with § 983.5(b), before it issues a request for proposals in accordance with § 983.51(b)(1), makes a selection based on a previous competition in accordance with § 983.51(b)(2), amends an existing HAP contract to add units in accordance with § 983.207(b), or noncompetitively selects a project in accordance with § 983.51(c).

(b) Analysis of impact. Prior to selecting a project for PBV assistance, a PHA must perform an analysis of the impact if project-basing 50 percent or more of the PHA's authorized voucher units. The analysis should consider the ability of the PHA to meet the needs of the community across its tenant-based and project-based voucher portfolio, including the impact on, among others: families on the waiting list and eligible PBV families that wish to move under § 983.261. The analysis performed by the PHA must be available as part of the public record.

§ 983.59 - Units excluded from program cap and project cap.

(a) General. For HAP contracts entered into on or after April 18, 2017, the PHA may commit project-based assistance to units that meet the requirements for exclusion in paragraph (b) of this section. Such units do not count toward the program cap or project cap described in §§ 983.6 and 983.54, respectively.

(b) Requirements for exclusion of existing or rehabilitated units. Excluded units must, in the five years prior to the request for proposals (RFP) or the proposal or project selection date in the case of selection without RFP, fall into one of the following categories provided that the units are removed from all categories prior to the effective date of the HAP contract:

(1) The units have received one of the following forms of HUD assistance:

(i) Public Housing Capital or Operating Funds (Section 9 of the 1937 Act);

(ii) Project-Based Rental Assistance (Section 8 of the 1937 Act). Project-based rental assistance under Section 8 includes the Section 8 moderate rehabilitation program, including the single-room occupancy (SRO) program;

(iii) Housing For the Elderly (Section 202 of the Housing Act of 1959);

(iv) Housing for Persons with Disabilities (Section 811 of the Cranston-Gonzalez National Affordable Housing Act);

(v) Rental Assistance Program (RAP) (Section 236(f)(2) of the National Housing Act); or

(vi) Flexible Subsidy Program (Section 201 of the Housing and Community Development Amendments Act of 1978).

(2) The units have been subject to a federally required rent restriction under one of the following programs:

(i) The Low-Income Housing Tax Credit program (26 U.S.C. 42);

(ii) Section 515 Rural Rental Housing Loans (42 U.S.C. 1485); or

(iii) The following HUD programs:

(A) Section 236;

(B) Section 221(d)(3) Below Market Interest Rate;

(C) Housing For the Elderly (Section 202 of the Housing Act of 1959);

(D) Housing for Persons with Disabilities (Section 811 of the Cranston-Gonzalez National Affordable Housing Act);

(E) Flexible Subsidy Program (Section 201 of the Housing and Community Development Amendments Act of 1978); or

(iv) Any other program identified by HUD through Federal Register notice subject to public comment.

(c) Replacement units. Newly constructed units developed under the PBV program may be excluded from the program cap and project cap provided the primary purpose of the newly constructed units is or was to replace units that meet the criteria of paragraph (b)(1) or (2) of this section. The newly constructed unit must be located on the same site as the unit it is replacing; however, an expansion of or modification to the prior project's site boundaries as a result of the design of the newly constructed project is acceptable as long as a majority of the replacement units are built back on the site of the original project and any replacement units that are not located on the existing site are part of a project that shares a common border with, are across a public right of way from, or touch that site. In addition, in order for the replacement units to be excluded from the program and project caps, one of the following must be true:

(1) Former residents of the original project must be provided with a selection preference that provides the residents with the right of first occupancy at the PBV newly constructed project when it is ready for occupancy.

(2) Prior to the demolition of the original project, the PBV newly constructed project must have been identified as replacement housing for that original project as part of a documented plan for the redevelopment of the site.

(d) Unit size configuration and number of units for newly constructed and rehabilitated projects. The unit size configuration of the PBV newly constructed or rehabilitated project may differ from the unit size configuration of the original project that the PBV units are replacing. In addition, the total number of PBV-assisted units may differ from the number of units in the original project. However, only the total number of units in the original project are excluded from the program cap and the project cap. Units that exceed the total number of covered units in the original project are subject to the program cap and the project cap.

(e) Inapplicability of other program and project cap exceptions. The 10 percent exception under § 983.6 and the project cap exception under § 983.54(c)(2) are inapplicable to excluded units under this section.

authority: 42 U.S.C. 1437f and 3535(d)
source: 70 FR 59913, Oct. 13, 2005, unless otherwise noted.
cite as: 24 CFR 983.56