§ 1130.600 - Purpose of PROP Article VI.

PROP Article VI sets forth the rights and responsibilities of recipients and the Federal Government with respect to intangible property. It thereby implements OMB guidance in 2 CFR 200.315.

§ 1130.605 - Copyrights asserted in works developed or otherwise acquired under awards.

(a) OMB guidance. OMB guidance in 2 CFR 200.315(b) addresses recipients' and the Federal Government's rights related to works that recipients may copyright under grants and cooperative agreements.

(b) DoD implementation. DoD implements 2 CFR 200.315(b) through award terms and conditions that specify recipient and DoD rights with respect to copyrightable works.

(c) Award terms and conditions. A DoD Component's general terms and conditions must use the wording appendix F to this part provides for Section A of PROP Article VI to affirm the recipient's right to assert copyright in works it develops or otherwise acquires under an award, as well as DoD's right to use the works for Federal purposes.

§ 1130.610 - Inventions developed under awards.

(a) OMB guidance. OMB guidance in 2 CFR 200.315(c) states that recipients of grants and cooperative agreements are subject to applicable regulations concerning patents and inventions, including Department of Commerce regulations at 37 CFR part 401.

(b) DoD implementation. In implementing 2 CFR 200.315(c) for awards for the performance of experimental, developmental, or research work, DoD:

(1) Extends to other entities the patent rights provisions of chapter 18 of Title 35 of the U.S. Code and 37 CFR part 401 that directly apply to small business firms and nonprofit organizations. This broadened applicability is in accordance with the February 18, 1983, Presidential memorandum on Government patent policy, referred to in Executive Order 12591, “Facilitating Access to Science and Technology.”

(2) Establishes a requirement for recipients to provide final reports listing all subject inventions under their awards or stating there were none, a requirement that 37 CFR 401.5(f)(1) provides as an agency option.

(3) Incorporates the prohibition in 35 U.S.C. 212 on asserting Federal Government rights in inventions made by recipients of scholarships, fellowships, training grants, or other awards made primarily for educational purposes.

(c) Award terms and conditions. (1) Awards for research, developmental, or experimental work. A DoD Component's general terms and conditions for awards for the performance of experimental, developmental, or research work funded in whole or in part by the Federal Government must include the wording appendix F to this part provides for Section B of PROP Article VI, with one permitted exception. The exception is that a DoD Component may reserve or substitute alternative wording for paragraph B.2.b of Section B of PROP Article VI, as appropriate, if it elects to:

(i) Omit the requirement for final invention reports;

(ii) Substitute “120 calendar days” for “90 calendar days” to provide an additional 30 days for recipient's submissions of final reports after the end date of the period of performance; or

(iii) Include a requirement for recipients to submit information about each patent application they submit for a subject invention, interim listings of all subject inventions, or both, which the Department of Commerce regulations at 37 CFR 401.5(f)(2) and (3) permit agencies to require.

(2) Awards for primarily educational purposes. A DoD Component's general terms and conditions for awards to support scholarships or fellowships, training grants, or other awards for primarily educational purposes must replace the wording appendix F to this part provides for Section B of PROP Article VI with an alternative award provision stating that the Federal Government will have no rights to inventions made by recipients.

(3) Awards for other purposes. A DoD Component developing general terms and conditions for awards other than those described in paragraphs (c)(1) and (2) of this section should:

(i) Consult its intellectual property counsel if it anticipates that recipients may develop patentable inventions under its awards, to identify any applicable statutes or regulations and determine an appropriate substitute for the wording appendix F to this part provides for Section B of PROP Article VI; or

(ii) Reserve Section B of PROP Article VI if it does not expect development of any patentable inventions under those awards.

§ 1130.615 - Data produced under awards.

(a) OMB guidance. OMB guidance in 2 CFR 200.315(d) and (e) addresses rights in data under grants and cooperative agreements.

(b) DoD implementation. DoD implements 2 CFR 200.315(d) and (e) through award terms and conditions.

(c) Award terms and conditions—(1) General. A DoD Component's general terms and conditions must include the wording appendix F to this part provides for Section C of PROP Article VI.

(2) Exception. A DoD Component may reserve paragraph C.2 of Section C of PROP Article VI in its general terms and conditions if:

(i) Those terms and conditions will not be used for research awards; and

(ii) The DoD Component determines that no research data as defined in 2 CFR 200.315 will be generated under the awards using those terms and conditions.

§ 1130.620 - Intangible property acquired, but not developed or produced, under awards.

(a) OMB guidance. OMB guidance in 2 CFR 200.315(a) addresses use and disposition of intangible property that is acquired under grants and cooperative agreements (in addition to vesting of title, which is implemented in § 1130.105 and appendix A to this part).

(b) DoD implementation. DoD implements 2 CFR 200.315(a) through award terms and conditions that govern use and disposition of intangible property that is acquired, but not developed or produced, under awards.

(c) Award terms and conditions. A DoD Component's general terms and conditions must include the wording appendix F to this part provides for Section D of PROP Article VI.

Appendix Appendix A - Appendix A to Part 1130—Terms and Conditions for PROP Article I, “Title to Property”

Unless a DoD Component inserts or adds wording or reserves sections of the article, as provided in §§ 1130.105 through 1130.125, a DoD Component's general terms and conditions must use the following wording for PROP Article I.

PROP Article I. Title to Property. (December 2014)

Section A. Title to property acquired under this award.

1. General. Other than any property identified in paragraph A.2 of this section as exempt property:

a. Title to real property, equipment, and supplies that you acquire (whether by purchase, construction or fabrication, development, or otherwise) and charge as direct project costs under this award vests in you, the recipient. Title to intangible property that you acquire (other than by developing or producing it) under this award also vests in you.

b. That title is a conditional title, subject to the terms and conditions in PROP Articles II-IV, Section D of PROP Article VI, and REP Article III of this award.

c. There is a Federal interest in the property, other than intangible property that you develop or produce under the award. For real property, equipment, and intangible property, we retain this Federal interest until final disposition of the property under PROP Article III (for real property), PROP Article IV (for equipment and supplies), or Section D of PROP Article VI (for intangible property that is acquired, other than by developing or producing it), a period that in some cases may extend beyond closeout of this award.

2. Exempt property. [Reserved]

Section B. Property trust relationship.

1. Basic requirement. Other than intangible property that you develop or produce under the award, you hold any real property, equipment, or intangible property that you acquire or improve under this award in trust for the beneficiaries of the project or program that you are carrying out under the award.

2. Notices of record. [Reserved]

Section C. Federally owned property. Title to any federally owned property that we provide to you under this award (or for which accountability is transferred to this award from another Federal award) remains with the Federal Government.

Section D. Federal interest in donated real property or equipment. If real property or equipment is acquired under this award through your donation of the property to the project or program (i.e., counting the value of the remaining life of the property recorded in your accounting records or the fair market value as permitted under FMS Article VI of this award as part of your share of project costs to meet any cost sharing or matching requirements, rather than charging depreciation):

1. The Federal Government acquires through that donation an interest in the real property or equipment, the value of which at any given time is the product of:

a. The Federal share of the project costs under this award; and

b. The current fair market value of the property at that time.

2. The real property or equipment is subject to Section B of this article and the terms and conditions of PROP Articles II-IV and REP Article III that are applicable to property acquired under the award.

3. The Federal interest in the real property or equipment must be addressed at the time of property disposition.

Section E. Federal interest in property improved under the award.

1. The Federal Government has an interest in improvements (as distinct from ordinary repairs and maintenance) you make to an item of real property or equipment if you charge the costs of the improvements as direct costs to this award.

2. We thereby acquire an interest in the property if the Government did not previously have one. If the Government already had an interest in the property, the value of that Federal interest in the property increases by the amount of the Federal interest in the improvements.

3. The property is subject to Section B of this article and the terms and conditions of PROP Articles II-IV and REP Article III that are applicable to real property or equipment acquired under the award.

4. The Federal interest must be addressed at the time of property disposition.

Appendix Appendix B - Appendix B to Part 1130—Terms and Conditions for PROP Article II, “Property Management System”

Unless a DoD Component reserves sections of the article, as provided in §§ 1130.205 through 1130.215, a DoD Component's general terms and conditions must use the following wording for PROP Article II.

PROP Article II. Property Management System. (December 2014)

Section A. Insurance coverage for real property and equipment. You must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired or improved under this award as you provide for real property and equipment that you own.

Section B. Other property management system standards for a State.

1. Equipment. Your property management system for equipment acquired or improved in whole or in part under this award must be in accordance with your State laws and procedures.

2. Federally owned property. You may use your own property management system for any federally owned property for which you are accountable, as long as it meets the following minimum standards:

a. Records. Your records must include for each item of federally owned property:

i. A description of the item.

ii. The location of the item.

iii. The serial or other identification number.

iv. Which Federal agency holds title.

v. The date you received the item.

vi. Any data on the ultimate disposition of the item, such as the date of disposal.

vii. The Federal award identification number of the award under which you are accountable for the item.

b. Inventory. You must take a physical inventory of federally owned property annually.

c. Control system. You must:

i. Maintain an internal property control system with adequate safeguards to prevent loss, damage, or theft of federally owned property.

ii. Investigate any loss, damage, or theft of federally owned property and promptly notify the award administration office.

d. Maintenance. You must maintain the property in good condition.

Section C. Other property management system standards for an institution of higher education, nonprofit organization, local government, or Indian tribe. Your procedures for managing equipment (including replacement equipment) acquired or improved in whole or in part under this award and any federally owned property for which you are accountable under this award must, as a minimum, meet the requirements in this section.

1. Records. You must maintain records that include for each item of equipment or federally owned property:

a. A description of the item.

b. The serial or other identification number.

c. Who holds title (e.g., you or the Federal Government and, if the latter, which Federal agency).

d. The source of funding for the equipment, including the Federal award identification number, or the source of the federally owned property, including the award number of the award under which you are accountable for the property.

e. The acquisition date and cost of the equipment (or improvement to the equipment) or the date you received the federally owned property.

f. The location, use, and condition of the equipment or federally owned property.

g. Information from which one can calculate the amount of the Federal interest in the acquisition or improvement of the item (this amount is zero after you compensate us for the Federal interest in the item or improvement).

h. Any data on the ultimate disposition of the item including the date of disposal and sale price.

2. Labelling. You must ensure that property owned by the Federal Government is labeled to identify it as federally owned property.

3. Inventory.

a. You must take a physical inventory of equipment in which there is a Federal interest and reconcile the results with your records at least once every 2 years.

b. You must take an annual inventory of any federally owned property for which you are accountable under this award.

4. Control system. You must:

a. Maintain an internal property control system with adequate safeguards to prevent loss, damage, or theft of equipment and federally owned property.

b. Investigate any loss, damage, or theft and notify the award administration office if it involved equipment in which there is a Federal interest under the award or federally owned property.

5. Maintenance. You must maintain equipment acquired or improved in whole or in part under the award and federally owned property in good condition.

Appendix Appendix C - Appendix C to Part 1130—Terms and Conditions for PROP Article III, “Use and Disposition of Real Property”

Unless a DoD Component substitutes wording in Section A, as provided in § 1130.305, a DoD Component's general terms and conditions must use the following wording for PROP Article III.

PROP Article III. Use and Disposition of Real Property. (December 2014)

Section A. Use of real property.

1. You must use real property acquired or improved under this award for the originally authorized purpose as long as needed for that purpose. During that time, you may not:

a. Dispose of the property except, with the approval of the award administration office, to acquire replacement property under this award, in which case you must use the proceeds from the disposition as an offset to the cost of the replacement property; or

b. Encumber the title or other interests in the property without the approval of the award administration office identified in this award.

2. During the time that the real property is used for the originally authorized purpose, you may make the property available for use on other projects or programs, but only if that use will not interfere with the property's use as needed for its originally authorized purpose.

a. First preference must be given to other projects or programs supported by DoD Components and second preference to those supported by other Federal agencies.

b. Third preference is for other projects or programs not currently supported by the Federal Government. You should charge user fees for use of the property in those cases, if it is at all practicable.

3. When the real property is no longer needed for the originally authorized purpose, with the written approval of the award administration office, you may delay final disposition of the property to use it on other federally sponsored projects or programs. A condition for the award administration office's approval is that the other projects or programs have purposes consistent with those authorized for support by the DoD Component that made the award under which the property was acquired or improved.

Section B. Disposition of real property. When you no longer need real property for the originally authorized purpose, you must obtain disposition instructions from the award administration office, except as provided in paragraph A.3 of this article. Those instructions will provide for one of the following three alternatives, which are that you:

1. Retain title after compensating us for the Federal interest in the property, which is to be computed as specified in the definition of “Federal interest.”

2. Sell the property and compensate us for the Federal interest in the property, as described in 2 CFR 200.311(c)(2).

3. Transfer title to us or a third party we designate, as described in 2 CFR 200.311(c)(3).

Appendix Appendix D - Appendix D to Part 1130—Terms and Conditions for PROP Article IV, “Use and Disposition of Equipment and Supplies”

As specified in §§ 1130.405 through 1130.425, a DoD Component's general terms and conditions must use the following wording for PROP Article IV.

PROP Article IV. Use and Disposition of Equipment and Supplies. (December 2014)

Section A. Property subject to this article. This article specifies requirements for use and disposition of equipment and supplies. If a provision of PROP Article I identifies any type of equipment or supplies as exempt property, requirements of this Article apply to that exempt property only to the extent specified in that provision of PROP Article I or an award-specific term or condition. The types of non-exempt property to which this article applies are:

1. Supplies that you acquire either by purchase or by donation as cost sharing or matching under this award; and

2. Equipment for which title is vested conditionally in you. That includes equipment with a conditional title resulting from your having, either under this award or under a previous award from which you transferred accountability for the equipment to this award:

a. Directly charged as project costs, in whole or in part, the acquisition (by purchase, construction or fabrication, or development) of equipment;

b. Donated the equipment to the project or program by counting the value of the remaining life of the property recorded in your accounting records or the fair market value toward any cost sharing or matching requirements under the award, rather than charging depreciation (see PROP Article I, Section D); or

c. Directly charged as project costs improvements to the equipment that meet the criteria given in paragraph E.1 of PROP Article I.

Section B. Requirements for a State's use and disposition of equipment. You:

1. Must use the equipment for the authorized purposes of the project or program during the period of performance, or until the property is no longer needed for those purposes.

2. May not encumber the property without the prior written approval of the award administration office.

3. Must use and dispose of the equipment in accordance with your State laws and procedures.

Section C. Use of equipment by an institution of higher education, nonprofit organization, local government, or Indian tribe. You:

1. Must use the equipment for the authorized purposes of the project or program under this award until the equipment is no longer needed for those purposes, whether or not the project or program continues to be supported by this award.

2. May not encumber the equipment without the prior written approval of the award administration office.

3. During the time that the equipment is used for the project or program under this award:

a. You must make the equipment available for use on other projects or programs but only if that use will not interfere with the equipment's use as needed for the project or program supported by this award.

i. First preference must be given to other projects or programs supported or previously supported by DoD Components

ii. Second preference to projects or programs supported or previously supported by other Federal agencies.

iii. Third preference is for other projects or programs not supported by the Federal Government. You should charge user fees for use of the equipment in those cases, if it is at all practicable.

b. You may use the equipment, if you need to acquire replacement equipment, as a trade-in or sell it (using sales procedures designed to ensure the highest possible return) and use the proceeds from the sale to offset the cost of the replacement equipment.

4. When the equipment is no longer needed for the project or program under this award, you may defer final disposition of the equipment and continue to use it on other federally sponsored projects or programs. You must give first priority to other projects or programs supported by DoD Components.

5. Notwithstanding the encouragement in FMS Article VII to earn program income, you may not use equipment in which there currently is a Federal interest—whether you acquired it under this award or are otherwise accountable for it under this award—to provide services for a fee that is less than private companies charge for equivalent services.

Section D. Disposition of equipment by an institution of higher education, nonprofit organization, local government, or Indian tribe. You must request disposition instructions from the award administration office when either original or replacement equipment acquired under this award with a current fair market value that exceeds $5,000 is no longer needed for the original project or program or for other federally sponsored activities as described in paragraph C.4 of this article. For each item of equipment with a current fair market value of $5,000 or less, you may retain, sell, or otherwise dispose of the item with no further obligation to the Federal Government.

1. We may issue disposition instructions that:

a. Allow you to retain or sell any item of equipment after compensating us for the Federal interest in the property, which is to be computed as specified in the definition of “Federal interest;” or

b. Require you to transfer title to the equipment to a Federal agency or a third party, in which case you are entitled to compensation from us for the non-Federal interest in the equipment, plus any reasonable shipping or interim storage costs incurred.

2. If we fail to provide disposition instructions for any item of equipment within 120 calendar days of receiving your request, you may retain or sell the equipment, but you must compensate us for the amount of the Federal interest in the equipment.

3. If you sell the equipment:

a. You must use sales procedures designed to ensure the highest possible return; and

b. You may deduct and retain for selling and handling expenses either $500 or ten percent of the proceeds, whichever is less.

Section E. Use and disposition of supplies acquired under this award.

1. Use. As long as we retain a Federal interest in supplies acquired under this award either by purchase or by donation as cost sharing or matching, you may not use the supplies to provide services to other organizations for a fee that is less than private companies charge for equivalent services, notwithstanding the encouragement in FMS Article VII to earn program income.

2. Disposition. If you have a residual inventory of unused supplies with aggregate value exceeding $5,000 at the end of the period of performance under this award, and the supplies are not needed for any other Federal award, you must retain the supplies or sell them but must in either case compensate us for the amount of the Federal interest in the supplies. You may deduct and retain for selling and handling expenses either $500 or ten percent of the proceeds, whichever is less.

Appendix Appendix E - Appendix E to Part 1130—Terms and Conditions for PROP Article V, “Use and Disposition of Federally Owned Property”

Unless a DoD Component reserves the article, as specified in § 1130.505, a DoD Component's general terms and conditions must use the following wording for PROP Article V.

PROP Article V. Use and Disposition of Federally Owned Property. (December 2014)

Section A. Use. During the time that federally owned property for which you are accountable under this award is used for the project or program supported by the award, you:

1. Also may make the property available for use on other federally supported projects or programs, but only if that use will not interfere with the property's use for the project or program supported by this award. You must give first priority to other projects or programs supported by DoD Components.

2. May use the property for purposes other than federally supported projects or programs only with the prior approval of the awarding office or, if you request approval after the award is made, the award administration office.

Section B. Disposition. You must request disposition instructions from the award administration office for any federally owned property under this award, including any property for which a subrecipient is accountable under a subaward you make under this award, either:

1. At any time during the period of performance if the property is no longer needed for the project or program supported by this award; or

2. At the end of the period of performance.

Appendix Appendix F - Appendix F to Part 1130—Terms and Conditions for PROP Article VI, “Intangible Property”

Except for Section B, whose language must be tailored or reserved based on the type of award as specified in § 1130.610, and Section D if reserved as provided in § 1130.615, a DoD Component's general terms and conditions must use the following wording for PROP Article VI.

PROP Article VI. Intangible Property. (December 2014)

Section A. Assertion of copyright.

1. You may assert copyright in any work that is eligible for copyright protection if you acquire ownership of it under this award, either by developing it or otherwise.

2. With respect to any work, you developed or otherwise acquired under this award, DoD reserves a royalty-free, nonexclusive and irrevocable license to:

a. Reproduce, publish, or otherwise use the work for Federal Government purposes; and

b. Authorize others to reproduce, publish, or otherwise use the work for Federal Government purposes.

Section B. Inventions developed under the award.

1. Applicability of Governmentwide clause for research awards. You must comply with the Governmentwide patent rights award clause published at 37 CFR 401.14, with the modifications described in paragraph B.2 of this section. DoD adopts that Governmentwide clause for the following entities, thereby broadening the applicability beyond types of entities included in the definition of “contractor” in 37 CFR part 401:

a. Any governmental or nonprofit entity (the types of entities subject to these general terms and conditions) receiving a DoD award for the performance of experimental, research, or developmental work;

b. Any governmental, nonprofit, or for-profit entity receiving a subaward to perform experimental, research, or developmental work under an award described in paragraph B.1.a of this section.

2. Modifications to the wording of the Governmentwide clause. DoD adopts the Governmentwide clause at 37 CFR 401.14, as described in paragraph B.1 of this section, with the following modifications:

a. Terminology. Throughout the Governmentwide clause:

i. Insert the terms “recipient” and “subrecipient (or contractor to the recipient or to a subrecipient)” to replace the terms “contractor” and “subcontractor,” respectively.

ii. Insert the terms “award” and “subaward (or contract under either the award or a subaward)” to replace the terms “contract” and “subcontract,” respectively.

b. Final report. Add a new subparagraph (f)(5) to read, “The recipient must submit a final report listing all subject inventions made under the award or stating that there were none. The final report is due 90 calendar days after the end date of the period of performance unless you request, and we grant, an extension of the due date.”

c. Broadening applicability to all entities. Delete paragraphs (g)(2) and (3) of the Governmentwide clause, redesignate paragraph (g)(1) as paragraph (g) and delete the phrase “to be performed by a small business firm or domestic nonprofit organization” from paragraph (g) as redesignated.

Section C. Data produced under the award.

1. Data in general. The Federal Government has the right to:

a. Obtain, reproduce, publish, or otherwise use the data produced under this award; and

b. Authorize others to receive, reproduce, publish, or otherwise use the data produced under this award for Federal Government purposes.

2. Research data requested under the Freedom of Information Act (FOIA).

a. If we receive a request under the FOIA for “research data” that are related to “published research findings” produced under this award and that were “used by the Federal Government in developing an agency action that has the force and effect of law,” you must provide the data to us within a reasonable time after we request it from you, so that the data can be made available to the public through procedures established under the FOIA.

b. For purposes of the requirement in paragraph C.2.a of this section, 2 CFR 200.315(e) provides definitions of the phrases “published research findings,” “used by the Federal Government in developing an agency action that has the force and effect of law,” and “research data.”

Section D. Use and disposition of intangible property acquired, but not developed or produced, under the award.

1. Applicability. This section applies to a patent, patent application, copyright, or other intangible property acquired, but not developed or produced, under this award.

2. Use. You:

a. Must use the intangible property for the authorized purpose under this award until the intangible property is no longer needed for that purpose, whether or not that purpose is still being supported by this award.

b. May not encumber the intangible property without the prior written approval of the award administration office.

3. Disposition. When the intangible property is no longer needed for the originally authorized purpose, you must contact the award administration office to arrange for disposition in accordance with the procedures specified for disposition of equipment in either section B or D of PROP Article IV, as applicable.

authority: 5 U.S.C. 301 and 10 U.S.C. 113.
source: 85 FR 51171, Aug. 19, 2020, unless otherwise noted.
cite as: 2 CFR 1130.600