§ 767.6 - Historic sunken military craft and terrestrial military craft permit application.
(a) Any person seeking to engage in an activity otherwise prohibited by section 1402 of the SMCA with respect to a historic sunken military craft or any activity that might affect a terrestrial military craft under the jurisdiction of the DON shall apply for a permit for the proposed activity and shall not begin the proposed activity until a permit has been issued. The Secretary or his designee may issue a permit to any qualified person, in accordance with these regulations, subject to appropriate terms and conditions.
(b) To request a permit application form, please write to: Department of the Navy, U.S. Naval History and Heritage Command, Underwater Archaeology Branch, 805 Kidder Breese St. SE., Washington Navy Yard, Washington, DC 20374-5060. Application forms and guidelines can also be found on the NHHC's Web site at: www.history.navy.mil.
(c) Each applicant must submit a digital (electronic) and two printed copies of their complete application at least 120 days in advance of the requested effective date to allow sufficient time for evaluation and processing. Completed applications should be sent to the Department of the Navy, U.S. Naval History and Heritage Command, Underwater Archaeology Branch, 805 Kidder Breese St. SE., Washington Navy Yard, Washington, DC 20374-5060.
(d) Each permit application shall include:
(1) A statement of research objectives, scientific methods, and significance of the proposed work to the U.S. Navy or the nation's maritime cultural heritage. This should include discussion articulating clearly the archaeological, historical, or educational purposes of the proposed activity;
(2) A summary of significant previous work in the area of interest;
(3) A discussion of how the proposed activity could disturb, remove, or injure the sunken military craft or the terrestrial military craft and the related physical environment;
(4) A discussion of the methodology planned to accomplish the project's objectives. This should include a map showing the study location(s) and a description of the wrecksite(s) of particular interest;
(5) An analysis of the extent and nature of potential environmental impacts from permitted activities and feasible mitigation measures that could reduce, avoid, or reverse environmental impacts, as well as any associated permits or authorizations required by foreign, federal, state, or local law;
(6) A detailed plan for wrecksite restoration and remediation with recommendations on wrecksite preservation and protection of the wrecksite location;
(7) In addition to identification and qualifications of the principal investigator, required by § 767.8, identification of all other members of the research team and their qualifications. Changes to the primary research team subsequent to the issuance of a permit must be authorized via a permit amendment request in accordance with § 767.10(a);
(8) A proposed budget, identification of funding source, and sufficient data to substantiate, to the satisfaction of the NHHC, the applicant's financial capability to complete the proposed research and, if applicable, any conservation and curation costs associated with or resulting from that activity;
(9) A proposed plan for the public interpretation and professional dissemination of the proposed activity's results;
(10) Where the application is for the excavation and/or removal of artifacts from a sunken military craft or terrestrial military craft, or for the excavation and/or removal of a sunken military craft or terrestrial military craft in its entirety, the following must be included:
(i) A conservation plan, estimated cost, and the name of the university, museum, laboratory, or other scientific or educational institution in which the material will be conserved, including written certification, signed by an authorized official of the institution, of willingness to assume conservation responsibilities.
(ii) A plan for applicable post-fieldwork artifact analysis, including an associated timetable.
(iii) The name of the facility in which the recovered materials and copies of associated records derived from the work will be curated. This will include written certification, signed by an authorized official of the institution, of willingness to assume curatorial responsibilities for the collection. The named repository must, at a minimum, meet the standards set forth in 36 CFR part 79, Curation of Federally-Owned and Administered Archaeological Collections, in accordance with § 767.9(h).
(iv) Acknowledgement that the applicant is responsible for all conservation-related and long-term curation costs, unless otherwise agreed upon by NHHC.
(11) A proposed project timetable to incorporate all phases of the project through to the final report and/or any other project-related activities.
(e) If the applicant believes that compliance with one or more of the factors, criteria, or procedures in the regulations contained in this part is not practicable, the applicant should set forth why and explain how the purposes of the SMCA (if applicable), these regulations, and the policies of the DON are better served without compliance with the specified requirements. If the NHHC believes that the policies of the DON are better served without compliance with one or more of the factors, criteria, or procedures in the regulations, or determines that there is merit in an applicant's request and that full compliance is not required to meet these priorities, the NHHC will provide a written waiver to the applicant stipulating which factors, criteria, or procedures may be foregone or amended. In exceptional circumstances, verbal permission may be obtained in cases of unexpected or emergent finds that may require immediate unanticipated disturbance, removal, or injury of a sunken or terrestrial military craft or its associated contents. However, the NHHC will not waive statutory procedures or requirements.
(f) Persons carrying out official NHHC duties under the direction of the NHHC Director, or his/her designee, or conducting activities at the direction of or in coordination with the NHHC as recognized through express written permission by the NHHC Director, or his/her designee, need not follow the permit application procedures set forth in this section and §§ 767.7 and 767.9 to 767.12 if those duties or activities are associated with the management of sunken military craft or terrestrial military craft. Where appropriate, such persons will coordinate with Federal Land Managers, the Bureau of Ocean Energy Management, State Historic Preservation Offices, or state land or resource managers, as applicable, prior to engaging in the aforementioned activities. The NHHC Director, or his/her designee, shall ensure that the provisions of paragraph (d) of this section and §§ 767.8 and 767.11 have been met by other documented means and that such documents and all resulting data will be archived within the NHHC.
(g) Federal agencies carrying out activities that disturb, remove, or injure sunken military craft or terrestrial military craft need not follow the permit application procedures set forth in this section and §§ 767.7 and 767.9 to 767.12 if those activities are associated with the management of sunken military craft or terrestrial military craft within their areas of responsibility. Where appropriate, Federal agencies will coordinate with the NHHC prior to engaging in the aforementioned activities.
§ 767.7 - Evaluation of permit application.
(a) Permit applications are reviewed for completeness, compliance with program policies, and adherence to the regulations of this subpart. Incomplete applications will be returned to the applicant for clarification. Complete applications are reviewed by NHHC personnel who, when appropriate, may seek outside guidance or peer reviews. In addition to the criteria set forth in §§ 767.6(d) and 767.8, applications are also judged on the basis of: Project objectives being consistent with DON policy and the near- and long-term interests of the DON; relevance or importance of the proposed project; archaeological, historical, or educational purposes achieved; appropriateness and environmental consequences of technical approach; conservation and long-term management plan; qualifications of the applicants relative to the type and scope of the work proposed; and funding to carry out proposed activities. The NHHC will also take into consideration the historic, cultural, or other concerns of a foreign state when considering an application to disturb a foreign sunken military craft of that state located within U.S. waters, subsequent to an understanding or agreement with the foreign state in accordance with § 767.15. The same consideration may be applied to U.S. sunken military craft that are brought under the jurisdiction of the DON for permitting purposes following an agreement with the Secretary of any military department, or in the case of the Coast Guard, the Secretary of the Department in which the Coast Guard is operating, as set forth in § 767.15(e).
(b) Prior to issuing a permit, the NHHC will consult with the appropriate federal resource manager when it receives applications for research at wrecksites located in areas that include units of the National Park System, National Wildlife Refuge System, National Marine Sanctuary System, Marine National Monuments, within lease blocks managed by the Bureau of Ocean Energy Management, or within areas of responsibility of other Federal Land Managers.
(c) Prior to issuing a permit, the NHHC will consult with the appropriate SHPO, state land or resource manager or Tribal Historic Preservation Office (THPO) when it receives applications for research at wrecksites located on state lands, including lands beneath navigable waters as defined in the Submerged Lands Act, 43 U.S.C. 1301-1315,or.
(d) The applicant is responsible for obtaining any and all additional permits or authorizations, such as but not limited to those issued by another federal or state agency, or foreign government. In the case of U.S. sunken military craft or terrestrial military craft located within foreign jurisdictions, the NHHC may review and issue a conditional permit authorizing activities upon receipt of the appropriate permits and authorizations of the applicable foreign government by the applicant. The applicant must file a copy of the foreign government authorization with the NHHC when submitting the preliminary report stipulated in § 767.9(d) and final report stipulated in § 767.9(f). Failure to do so will be considered a permit violation.
(e) Based on the findings of the NHHC evaluation, NHHC personnel will recommend an appropriate action to the NHHC Deputy Director. If approved, the NHHC Deputy Director, or his or her designee, will issue the permit; if denied, applicants are notified of the reason for denial and may request reconsideration within 30 days of receipt of the denial. Requests for reconsideration must be submitted in writing to: Director of Naval History, Naval History and Heritage Command, 805 Kidder Breese St. SE., Washington Navy Yard, Washington, DC 20374-5060.
§ 767.8 - Credentials of principal investigator.
The principal investigator shall be suitably qualified as evidenced by training, education, and/or experience, and possess demonstrable competence in archaeological theory and method, and in collecting, handling, analyzing, evaluating, and reporting archaeological data, relative to the type and scope of the work proposed. A resume or curriculum vitae detailing the professional qualifications of the principal investigator must be submitted with the permit application. Additionally, the principal investigator will be required to attest that all persons on the project team shall be qualified and have demonstrated competence appropriate to their roles in the proposed activity. The principal investigator must, at a minimum, meet the following requirements:
(a) The minimum professional qualification standards for archaeology as determined by the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation.
(b) At least one year of full-time professional supervisory experience in the archaeological study of historic maritime resources or historic aviation resources. This experience requirement may concurrently account for certain stipulations of paragraph (a) of this section.
(c) The demonstrated ability to plan, equip, fund, staff, organize, and supervise the type and scope of activity proposed.
(d) If applicable, the demonstrated ability to submit post-operational archaeological or other technical reports in a timely manner.
§ 767.9 - Conditions of permits.
(a) Permits are valid for one year from the date of issue.
(b) Upon receipt of a permit, permit holders shall counter-sign the permit and return copies to the NHHC and the appropriate SHPO, state land or resource manager, THPO, or foreign government official, if applicable, prior to conducting permitted activities on the wrecksite. When the sunken military craft or terrestrial military craft is located within federal areas such as a unit of the National Park System, the National Wildlife Refuge System, the National Marine Sanctuary System, or Marine National Monuments, the permit holder shall provide copies of countersigned permits to the applicable federal resource manager. Upon the NHHC confirming receipt of the counter-signed permit, the permitted activities may commence, provided that any other federal or state regulatory and permitting requirements that apply are met.
(c) Permits shall be carried on-site and made available upon request for inspection by federal or state law enforcement officials. Permits are non-transferable. The permit holder, or the activity's authorized principal investigator in the case where a permit holder is not concurrently the authorized principal investigator, is expected to remain on-site for the duration of operations prescribed in the permit. In the event a permit holder or the authorized principal investigator is unable to directly oversee operations, the permit holder must nominate a suitable qualified representative who may only serve in that function upon written approval by the NHHC.
(d) Permit holders must abide by all provisions set forth in the permit as well as applicable state or federal regulations. Permit holders must abide by applicable regulations of a foreign government for activities directed at a sunken military craft when the sunken military craft is located in the internal waters, territorial sea, contiguous zone, or continental shelf of a foreign State, as defined by customary international law reflected in the United Nations Convention on the Law of the Sea. If the physical environment is to be impacted by the permitted activity, the permit holder will be expected to meet any associated permit or authorization stipulations required by foreign, federal, state, or local law, as well as apply mitigation measures to limit such impacts and where feasible return the physical environment to the condition that existed before the activity occurred.
(e) At least 30 days prior to the expiration of the original permit, the permit holder shall submit to the NHHC a preliminary report that includes a working log and, where applicable, a diving log, listing days spent conducting field research, activities pursued, working area locations including precise coordinates, an inventory of artifacts observed or recovered, and preliminary results and conclusions. The NHHC shall review preliminary reports for thoroughness, accuracy, and quality and shall inform the permit holder of their formal acceptance in writing.
(f) In the case of one or more permit extensions received through the process identified in § 767.10(b), a preliminary report that includes all the information stated in paragraph (e) of this section is to be submitted by the permit holder annually at least 30 days prior to the renewed permit's expiration date.
(g) The permit holder shall prepare and submit a final report as detailed in § 767.11, summarizing the results of the permitted activity to the NHHC, and any applicable SHPO, THPO, federal or state land or resource manager, or foreign government official within an appropriate time frame as specified in the permit. Failure to submit a final report within the specified time-frame will be considered a permit violation. If the final report is not due to be submitted within two years of commencement of a permitted activity, interim reports must be filed biennially, with the first interim report submitted within two years of commencement of the activity. The interim report must include information required by § 767.11 to the maximum extent possible, and an account of both the progress that has been achieved and the objectives remaining to be accomplished. The NHHC shall review interim and final reports for thoroughness, accuracy, and quality and shall inform the permit holder of their formal acceptance in writing.
(h) The permit holder shall agree to protect all sensitive information regarding the location and character of a wrecksite that could potentially expose it to non-professional recovery techniques, looters, or unauthorized salvage. Sensitive information includes specific location data and information about the cargo of a sunken military craft or terrestrial military craft, the existence of armaments, munitions and other hazardous materials, or the presence of, or potential presence of, human remains.
(i) All recovered DON sunken military craft, terrestrial military craft, and their associated contents, remain the property of the United States. These resources and copies of associated archaeological records and data must be preserved by a suitable university, museum, or other scientific or educational institution that, at a minimum, meets the standards set forth in 36 CFR part 79, Curation of Federally-Owned and Administered Archaeological Collections, at the expense of the applicant or facility, unless otherwise agreed upon in writing by the NHHC. The curatorial facility must establish a loan of resources agreement with the NHHC and maintain it in good standing. If a loan of resources agreement is not established, or at the discretion of the NHHC, resources are to be managed, conserved and curated directly by the NHHC at the expense of the applicant, unless otherwise agreed upon in writing by the NHHC. Copies of associated archaeological and conservation records and data will be made available to the NHHC, and to the applicable SHPO, THPO, the federal or state land or resource manager, or foreign government official upon request.
(j) The disposition of foreign sunken military craft or associated contents shall be determined on a case-by-case basis in coordination with the respective foreign state prior to the issuance of a NHHC permit.
(k) In the event that credible evidence for or actual human remains, unexploded ordnance, hazardous materials or environmental pollutants such as oil are discovered during the course of research, the permit holder shall cease all work and immediately notify the NHHC. Permitted work may not resume until authorized by the NHHC.
(l) The permittee shall purchase and maintain sufficient comprehensive general liability, and such other types of insurance, in an amount consistent with generally accepted industry standards throughout the period covered by the permit, or post an equivalent bond. Such insurance shall cover against any third party claims arising out of activities conducted under the permit. The permittee must further agree to hold the United States harmless against such claims.
§ 767.10 - Requests for amendments or extensions of active permits.
(a) Requests for amendments to active permits (e.g., a change in study design or research personnel) must conform to the regulations in this part. All information deemed necessary by the NHHC to make an objective evaluation of the amendment must be included as well as reference to the original application. Requests for amendments must be sent to the Deputy Director, Naval History and Heritage Command, 805 Kidder Breese St. SE., Washington Navy Yard, Washington DC 20374-5060. A pending amendment request does not guarantee approval and proposed activities cannot commence until approval is granted. All requests for permit amendments must be submitted during the period within which an existing permit is active and at least 30 days prior to the desired effect date of the amendment. Time-sensitive or non-substantive amendments must be submitted in writing to the point of contact included in the permit and will be considered and expedited on a case-by-case basis.
(b) Permit holders desiring to continue research activities beyond the original permit expiration date must apply for an extension of a valid permit prior to its expiration. A pending extension request does not guarantee an extension of the original permit. All requests for a permit extension must be sent to the Deputy Director, Naval History and Heritage Command, 805 Kidder Breese St. SE., Washington Navy Yard, Washington, DC 20374-5060, at least 30 days prior to the original permit's expiration date. Reference to the original application may be given in lieu of a new application, provided the scope of work does not change significantly. Applicants may apply for one-year extensions subject to annual review.
(c) Permit holders may appeal denied requests for amendments or extensions to the appeal authority listed in § 767.7(e).
§ 767.11 - Content of permit holder's final report.
The permit holder's final report shall at minimum include the following:
(a) A wrecksite history and a contextual history relating the wrecksite to the general history of the region;
(b) A master wrecksite map;
(c) Feature map(s) of any recovered artifacts showing their positions within the wrecksite;
(d) Where environmental conditions allow, photographs of significant wrecksite features and significant artifacts both in situ and after removal;
(e) If applicable, a section that includes an inventory of recovered artifacts, description of conserved artifacts, laboratory conservation records, documentation of analyses undertaken, photographs of recovered artifacts before and after conservation treatment, and recommended curation conditions;
(f) A written report describing the wrecksite's discovery, environment, past and current archaeological fieldwork, results, and analysis;
(g) A summary of the survey and/or excavation process including methods and techniques employed, an account of operational phases, copies of applicable logs, as well as thorough analysis of the recovered data;
(h) An evaluation of the completed permitted activity that includes an assessment of the project's degree of success compared to the goals specified in the permit application;
(i) Recommendations for future activities, if applicable;
(j) An account of how the public interpretation or dissemination plan described in the permit application has been or is being carried out. Additionally, identification of any sensitive information as detailed in § 767.9(g).
§ 767.12 - Special use permit application.
(a) Any person proposing to engage in an activity to document a sunken military craft utilizing diving methods or remotely-operated or autonomously-operated equipment, or collect data or samples from a wrecksite, whether a sunken military craft or terrestrial military craft, that would result in the wrecksite's disturbance but otherwise be minimally intrusive, may apply for a special use permit. Any person proposing to engage in an activity that would disturb, remove, or injure a non-historic sunken military craft must apply for a special use permit.
(b) To request a special use permit application form, please refer to § 767.6(b) and (c). Special use permit applications must be sent to the Department of the Navy, U.S. Naval History and Heritage Command, Underwater Archaeology Branch, 805 Kidder Breese St. SE., Washington Navy Yard, Washington, DC 20374-5060.
(c) Each special use permit application shall include:
(1) A statement of the project's objectives and an explanation on how they would serve the NHHC's objectives stated in § 767.5;
(2) A discussion of the methodology planned to accomplish the project's objectives. This should include a map showing the study location(s) and a description of the wrecksite(s) of particular interest;
(3) An analysis of the extent and nature of potential direct or indirect impacts on the resources and their surrounding environment from permitted activities, as well as any proposed mitigation measures;
(4) Where appropriate, a plan for wrecksite restoration and remediation with recommendations on wrecksite preservation and protection of the wrecksite location;
(d) The NHHC Deputy Director, or his or her designee, may authorize a special use permit under the following conditions:
(1) The proposed activity is compatible with the NHHC policies and in the case of non-historic sunken military craft is not opposed by consulted DON parties;
(2) The activities carried out under the permit are conducted in a manner that is minimally intrusive and does not purposefully significantly disturb, remove or injure the sunken military craft or wrecksite;
(3) When applicable, the pilot(s) of remotely-operated equipment holds a certificate of operation from a nationally-recognized organization;
(4) The principal investigator must hold a graduate degree in archaeology, anthropology, maritime history, oceanography, marine biology, marine geology, other marine science, closely related field, or possess equivalent training and experience. This requirement may be waived by the NHHC on a case by case basis depending on the activity stipulated in the application.
(e) The permittee shall submit the following information subsequent to the conclusion of the permitted activity within an appropriate time frame as specified in the special use permit:
(1) A summary of the activities undertaken that includes an assessment of the goals specified in the permit application;
(2) Identification of any sensitive information as detailed in § 767.9(h);
(3) Complete and unedited copies of any and all documentation and data collected (photographs, video, remote sensing data, etc.) during the permitted activity and results of any subsequent analyses.
(f) The following additional sections of this subpart shall apply to special use permits: §§ 767.7(e); 767.9(a), (b), (c), (e), (f), (g), (h), (k), and (l); 767.10; 767.13; 767.14; and 767.15(c).
(g) All sections of subpart A of this part shall apply to all special use permits, and all sections of subpart C of this part shall apply to special use permits pertaining to sunken military craft.
(h) Unless stipulated in the special use permit, the recovery of artifacts associated with any wrecksite is prohibited.
§ 767.13 - Monitoring of performance.
Permitted activities will be monitored to ensure compliance with the conditions of the permit. In addition to remotely monitoring operations, NHHC personnel, or other designated authorities, may periodically assess work in progress through on-site monitoring at the location of the permitted activity. The discovery of any potential irregularities in performance under the permit by NHHC on-site personnel, other designated authorities, or the permit holder, must be promptly reported to the NHHC for appropriate action. Adverse action may ensue in accordance with § 767.14. Findings of unauthorized activities will be taken into consideration when evaluating future permit applications.
§ 767.14 - Amendment, suspension, or revocation of permits.
The NHHC Deputy Director, or his/her designee may amend, suspend, or revoke a permit in whole or in part, temporarily or indefinitely, if in his/her view the permit holder has acted in violation of the terms of the permit or of other applicable regulations, or for other good cause shown. Any such action will be communicated in writing to the permit holder or the permit holder's representative and will set forth the reason for the action taken. The permit holder may request the Director of the NHHC reconsider the action in accordance with § 767.7(e).
§ 767.15 - Application to foreign sunken military craft and U.S. sunken military craft not under the jurisdiction of the Navy.
(a) Sunken military craft are generally entitled to sovereign immunity regardless of where they are located or when they sank. Foreign governments may request, via the Department of State, that the Secretary of the Navy administer a permitting program for a specific or a group of its sunken military craft in U.S. waters. The request must include the following:
(1) The foreign government must assert the sovereign immunity of or ownership over a specified sunken military craft or group of sunken military craft;
(2) The foreign government must request assistance from the United States government;
(3) The foreign government must acknowledge that subparts B and C of this part will apply to the specified sunken military craft or group of sunken military craft for which the request is submitted.
(b) Upon receipt and favorable review of a request from a foreign government, the Secretary of the Navy, or his or her designee, in consultation with the Department of State, will proceed to accept the specified sunken military craft or group of sunken military craft into the present permitting program. The Secretary of the Navy, or his or her designee, in consultation with the Department of State, reserves the right to decline a request by the foreign government. Should there be a need to formalize an understanding with the foreign government in response to a submitted request stipulating conditions such as responsibilities, requirements, procedures, and length of effect, the Secretary of State, or his or her designee, in consultation with the Secretary of Defense, or his or her designee, will proceed to formalize an understanding with the foreign government. Any views on such a foreign government request or understanding expressed by applicable federal, tribal, and state agencies will be taken into account.
(c) Persons may seek a permit to disturb foreign sunken military craft located in U.S. waters that have been accepted into the present permitting program or are covered under a formalized understanding as per paragraph (b) of this section, by submitting a permit application or special use permit application, as appropriate, for consideration by the NHHC in accordance with subparts B and C of this part.
(d) In the case where there is reasonable dispute over the sovereign immunity or ownership status of a foreign sunken military craft, the Secretary of the Navy, or his or her designee, maintains the right to postpone action on §§ 767.6 and 767.12, as well as requests under paragraph (a) of this section, until the dispute over the sovereign immunity or ownership status is resolved.
(e) The Secretary of any military department, or in the case of the Coast Guard the Secretary of the Department in which the Coast Guard is operating, may request that the Secretary of the Navy administer the DON permitting program with regard to sunken military craft under the cognizance of the Secretary concerned. Upon the agreement of the Secretary of the Navy, or his or her designee, subparts A, B, and C of this part shall apply to those agreed upon craft.
source: 80 FR 52594, Aug. 31, 2015, unless otherwise noted.
cite as: 32 CFR 767.13