§ 233.30 - Application for a permit.
(a) Except when an activity is authorized by a general permit issued pursuant to § 233.21 or is exempt from the requirements to obtain a permit under § 232.3, any person who proposes to discharge dredged or fill material into State regulated waters shall complete, sign, and submit a permit application to the Director. Applicants for projects that take more than five years to complete must submit a complete application for each five-year permit, and an applicant seeking a new five-year permit must apply for the new permit at least 180 days prior to the expiration of the current permit. The Tribe or State may grant permission to submit an application less than 180 days prior to the expiration of the current permit but no later than the permit expiration date. Persons proposing to discharge dredged or fill material under the authorization of a general permit must comply with any reporting requirements of the general permit.
(b) A complete application shall include:
(1) Name, address, telephone number of the applicant and name(s) and address(es) of adjoining property owners.
(2) A complete description of the proposed activity including necessary drawings, sketches or plans sufficient for public notice (the applicant is not generally expected to submit detailed engineering plans and specifications); the location, purpose and intended use of the proposed activity; scheduling of the activity; the location and dimensions of adjacent structures; and a list of authorizations required by other Federal, interstate, State or local agencies for the work, including all approvals received or denials already made.
(3) The application must include a description of the type, composition, source and quantity of the material to be discharged, the method of discharge, and the site and plans for disposal of the dredged or fill material.
(4) A certification that all information contained in the application is true and accurate and acknowledging awareness of penalties for submitting false information.
(5) All activities which the applicant plans to undertake which are reasonably related to the same project must be included in the same permit application. For projects for which the planned schedule extends beyond five years at the time of the initial five-year permit application, the application for both the first and subsequent five-year permits must include an analysis demonstrating that each element of the 404(b)(1) Guidelines is met, consistent with 40 CFR part 230, for the full term of the project. Applicants for subsequent five-year permits must update the 404(b)(1) Guidelines analysis if there has been a change in circumstance related to the project following approval of the previous five-year permit, and clearly indicate whether the 404(b)(1) Guidelines analysis has been updated.
(c) In addition to the information indicated in § 233.30(b), the applicant will be required to furnish such additional information as the Director deems appropriate to assist in the evaluation of the application. Such additional information may include environmental data and information on alternate methods and sites as may be necessary for the preparation of the required environmental documentation.
(d) The level of detail shall be reasonably commensurate with the type and size of discharge, proximity to critical areas, likelihood of long-lived toxic chemical substances, and potential level of environmental degradation.
Note:
EPA encourages States to provide permit applicants guidance regarding the level of detail of information and documentation required under this subsection. This guidance can be provided either through the application form or on an individual basis. EPA also encourages the State to maintain a program to inform potential applicants for permits of the requirements of the State program and of the steps required to obtain permits for activities in State regulated waters.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103504, Dec. 18, 2024]
§ 233.31 - Coordination requirements.
(a) If a proposed discharge may affect the biological, chemical, or physical integrity of the waters of any State(s) other than the State in which the discharge occurs, the Director shall provide an opportunity for such State(s) to submit written comments within the public comment period and to suggest permit conditions. If these recommendations are not accepted by the Director, the Director shall notify the affected State and the Regional Administrator in writing prior to permit issuance of the Director's failure to accept these recommendations, together with the Director's reasons for so doing. The Regional Administrator shall then have the time provided for in § 233.50(d) to comment upon, object to, or make recommendations.
(b) State section 404 permits shall be coordinated with the Federal and Federal-State water related planning and review processes.
(c) For the purposes of § 233.31(a), the definition of “State” in § 233.2 includes Indian Tribes that have been approved by EPA under CWA section 518 and applicable regulations for eligibility to administer any CWA provision as well as Indian Tribes that have been approved by EPA under paragraph (d) of this section for eligibility for the purpose of commenting under § 233.31(a).
(d) An Indian Tribe may apply to the Regional Administrator for a determination that it meets the statutory criteria of section 518 of the CWA, 33 U.S.C. 1377,to,for,33.S.C. 1344(h)(1)(C) and (E), of the CWA and paragraphs (a) and (c) of this section.
(1) The Tribe's application shall concisely describe how:
(i) The Indian Tribe is recognized by the Secretary of the Interior;
(ii) The Indian Tribe has a governing body carrying out substantial governmental duties and powers;
(iii) The functions to be exercised by the Indian Tribe pertain to the management and protection of water resources which are held by an Indian Tribe, held by the United States in trust for Indians, held by a member of an Indian Tribe if such property interest is subject to a trust restriction on alienation, or otherwise within the borders of the Indian reservation; and
(iv) The Indian Tribe is reasonably expected to be capable, in the Regional Administrator's judgment, of carrying out the functions to be exercised in a manner consistent with the terms and purposes of the CWA and applicable regulations.
(2) The Regional Administrator shall promptly notify the Indian Tribe of receipt of an application submitted under this section and shall process such application in a timely manner.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103504, Dec. 18, 2024]
§ 233.32 - Public notice.
(a) Applicability.
(1) The Director shall give public notice of the following actions:
(i) Receipt of a permit application.
(ii) Preparation of a draft general permit.
(iii) Consideration of a major modification to an issued permit.
(iv) Scheduling of a public hearing.
(v) Issuance of an emergency permit.
(2) Public notices may describe more than one permit or action.
(b) Timing.
(1) The public notice shall provide a reasonable period of time, normally at least 30 days, within which interested parties may express their views concerning the permit application.
(2) Public notice of a public hearing shall be given at least 30 days before the hearing.
(3) The Regional Administrator may approve a program with shorter public notice timing if the Regional Administrator determines that sufficient public notice is provided for.
(c) The Director shall give public notice by each of the following methods:
(1) By mailing a copy of the notice to the following persons (any person otherwise entitled to receive notice under this paragraph (c)(1) may waive their rights to receive notice for any classes or categories of permits):
(i) The applicant.
(ii) Any agency with jurisdiction over the activity or the disposal site, whether or not the agency issues a permit.
(iii) Owners of property adjoining the property where the regulated activity will occur.
(iv) All persons who have specifically requested copies of public notices. (The Director may update the mailing list from time to time by requesting written indication of continued interest from those listed. The Director may delete from the list the name of any person who fails to respond to such a request.)
(v) Any State whose waters may be affected by the proposed discharge.
(2) In addition, by providing notice in at least one other way (such as advertisement in a newspaper of sufficient circulation) reasonably calculated to cover the area affected by the activity.
(d) All public notices shall contain at least the following information:
(1) The name and address of the applicant and, if different, the address or location of the activity(ies) regulated by the permit.
(2) The name, address, and telephone number of a person to contact for further information.
(3) A brief description of the comment procedures and procedures to request a public hearing, including deadlines.
(4) A brief description of the proposed activity, its purpose and intended use, so as to provide sufficient information concerning the nature of the activity to generate meaningful comments, including a description of the type of structures, if any, to be erected on fills, and a description of the type, composition and quantity of materials to be discharged.
(5) A plan and elevation drawing showing the general and specific site location and character of all proposed activities, including the size relationship of the proposed structures to the size of the impacted waterway and depth of water in the area.
(6) A paragraph describing the various evaluation factors, including the 404(b)(1) Guidelines or State-equivalent criteria, on which decisions are based. For projects with a planned schedule that extends beyond five years at the time of the initial five-year permit application, the public notice for subsequent five-year permits must indicate whether the 404(b)(1) Guidelines analysis has been updated.
(7) Any other information which would significantly assist interested parties in evaluating the likely impact of the proposed activity.
(e) Notice of public hearing shall also contain the following information:
(1) Time, date, and place of hearing.
(2) Reference to the date of any previous public notices relating to the permit.
(3) Brief description of the nature and purpose of the hearing.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103505, Dec. 18, 2024]
§ 233.33 - Public hearing.
(a) Any interested person may request a public hearing during the public comment period as specified in § 233.32. Requests shall be in writing and shall state the nature of the issues proposed to be raised at the hearing.
(b) The Director shall hold a public hearing whenever the Director determines there is a significant degree of public interest in a permit application or a draft general permit. The Director may also hold a hearing, at the Director's discretion, whenever the Director determines a hearing may be useful to a decision on the permit application.
(c) At a hearing, any person may submit oral or written statements or data concerning the permit application or draft general permit. The public comment period shall automatically be extended to the close of any public hearing under this section. The presiding officer may also extend the comment period at the hearing.
(d) All public hearings shall be reported verbatim. Copies of the record of proceedings may be purchased by any person from the Director or the reporter of such hearing. A copy of the transcript (or if none is prepared, a tape of the proceedings) shall be made available for public inspection at an appropriate State office.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103505, Dec. 18, 2024]
§ 233.34 - Making a decision on the permit application.
(a) The Director will review all applications for compliance with the 404(b)(1) Guidelines and/or equivalent State environmental criteria as well as any other applicable State laws or regulations.
(b) The Director shall consider all comments received in response to the public notice, and public hearing if a hearing is held. All comments, as well as the record of any public hearing, shall be made part of the official record on the application.
(c) After the Director has completed review of the application and consideration of comments, the Director will determine, in accordance with the record and all applicable regulations, whether or not the permit should be issued. No permit shall be issued by the Director under the circumstances described in § 233.20. The Director shall prepare a written determination on each application outlining the Director's decision and rationale for the decision. For projects with a planned schedule that extends beyond five years at the time of the initial five-year permit application, if the Director decides not to require an update to the 404(b)(1) Guidelines for a subsequent five-year permit, the Director must provide a detailed written explanation of the decision not to require an update in its determination for the subsequent five-year permit. The determination shall be dated, signed, and included in the official record prior to final action on the application. The official record shall be open to the public.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103505, Dec. 18, 2024]
§ 233.35 - Issuance and effective date of permit.
(a) If the Regional Administrator comments on a permit application or draft general permit under § 233.50, the Director shall follow the procedures specified in that section in issuing the permit.
(b) If the Regional Administrator does not comment on a permit application or draft general permit, the Director shall make a final permit decision after the close of the public comment period and shall notify the applicant.
(1) If the decision is to issue a permit, the permit becomes effective when it is signed by the Director and the applicant.
(2) If the decision is to deny the permit, the Director will notify the applicant in writing of the reason(s) for denial.
§ 233.36 - Modification, suspension or revocation of permits.
(a) General. The Director may reevaluate the circumstances and conditions of a permit either on the Director's own motion or at the request of the permittee or of a third party and initiate action to modify, suspend, or revoke a permit if the Director determines that sufficient cause exists. Among the factors to be considered are:
(1) Permittee's noncompliance with any of the terms or conditions of the permit;
(2) Permittee's failure in the application or during the permit issuance process to disclose fully all relevant facts or the permittee's misrepresentation of any relevant facts at the time;
(3) Information that activities authorized by a general permit are having more than minimal individual or cumulative adverse effect on the environment, or that the permitted activities are more appropriately regulated by individual permits;
(4) Circumstances relating to the authorized activity have changed since the permit was issued and justify changed permit conditions or temporary or permanent cessation of any discharge controlled by the permit;
(5) Any significant information relating to the activity authorized by the permit if such information was not available at the time the permit was issued and would have justified the imposition of different permit conditions or denial at the time of issuance;
(6) Revisions to applicable statutory or regulatory authority, including toxic effluent standards or prohibitions or water quality standards.
(b) Limitations. Permit modifications shall be in compliance with § 233.20.
(c) Procedures. (1) The Director shall develop procedures to modify, suspend, or revoke permits if the Director determines cause exists for such action (§ 233.36(a)). Such procedures shall provide opportunity for public comment (§ 233.32), coordination with the Federal review agencies (§ 233.50), and opportunity for public hearing (§ 233.33) following notification of the permittee. When permit modification is proposed, only the conditions subject to modification need be reopened.
(2) Minor modification of permits. The Director may, upon the consent of the permittee, use abbreviated procedures to modify a permit to make the following corrections or allowance for changes in the permitted activity:
(i) Correct typographical errors;
(ii) Require more frequent monitoring or reporting by permittee;
(iii) Allow for a change in ownership or operational control of a project or activity where the Director determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittees has been submitted to the Director;
(iv) Provide for minor modification of project plans that do not significantly change the character, scope, and/or purpose of the project or result in significant change in environmental impact;
(v) Extend the term of a permit, so long as the modification does not extend the term of the permit beyond 5 years from its original effective date and does not result in any increase in the amount of dredged or fill material allowed to be discharged.
[53 FR 20776, June 1, 1988, as amended at 89 FR 103505, Dec. 18, 2024]
§ 233.37 - Signatures on permit applications and reports.
The application and any required reports must be signed by the person who desires to undertake the proposed activity or by that person's duly authorized agent if accompanied by a statement by that person designating the agent. In either case, the signature of the applicant or the agent will be understood to be an affirmation that the applicant or the agent possesses or represents the person who possesses the requisite property interest to undertake the activity proposed in the application.
[89 FR 103505, Dec. 18, 2024]
§ 233.38 - Continuation of expiring permits.
A Corps 404 permit does not continue in force beyond its expiration date under Federal law if, at that time, a State is the permitting authority. States authorized to administer the 404 Program may continue Corps or State-issued permits until the effective date of the new permits, if State law allows. Otherwise, the discharge is being conducted without a permit from the time of expiration of the old permit to the effective date of a new State-issued permit, if any.
§ 233.39 - Electronic reporting.
States that choose to receive electronic documents must satisfy the requirements of 40 CFR Part 3—(Electronic reporting) in their state program.
[70 FR 59888, Oct. 13, 2005]
source: 53 FR 20776, June 1, 1988, unless otherwise noted.
cite as: 40 CFR 233.30