Regulations last checked for updates: Nov 27, 2024
§ 60-1.20 - Compliance evaluations.
(a) OFCCP may conduct compliance evaluations to determine if the contractor maintains nondiscriminatory hiring and employment practices and is taking affirmative action to ensure that applicants are employed and that employees are placed, trained, upgraded, promoted, and otherwise treated during employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. A compliance evaluation may consist of any one or any combination of the following investigative procedures:
(1) Compliance review. A comprehensive analysis and evaluation of the hiring and employment practices of the contractor, the written affirmative action program, and the results of the affirmative action efforts undertaken by the contractor. A compliance review may proceed in three stages:
(i) A desk audit of the written AAP and supporting documentation to determine whether all elements required by the regulations in this part are included, whether the AAP meets agency standards of reasonableness, and whether the AAP and supporting documentation satisfy agency standards of acceptability. The desk audit is conducted at OFCCP offices, except in the case of preaward reviews. In a preaward review, the desk audit normally is conducted at the contractor's establishment.
(ii) An on-site review, conducted at the contractor's establishment to investigate unresolved problem areas identified in the AAP and supporting documentation during the desk audit, to verify that the contractor has implemented the AAP and has complied with those regulatory obligations not required to be included in the AAP, and to examine potential instances or issues of discrimination. An on-site review normally will involve an examination of the contractor's personnel and employment policies, inspection and copying of documents related to employment actions, and interviews with employees, supervisors, managers, hiring officials; and
(iii) Where necessary, an off-site analysis of information supplied by the contractor or otherwise gathered during or pursuant to the on-site review.
(2) Off-site review of records. An analysis and evaluation of the AAP (or any part thereof) and supporting documentation, and other documents related to the contractor's personnel policies and employment actions that may be relevant to a determination of whether the contractor has complied with the requirements of the Executive Order and regulations;
(3) Compliance check. A determination of whether the contractor has maintained records consistent with § 60-1.12; at the contractor's option the documents may be provided either on-site or off-site; or
(4) Focused review. An on-site review restricted to one or more components of the contractor's organization or one or more aspects of the contractor's employment practices.
(b) Where deficiencies are found to exist, OFCCP will make reasonable efforts to secure compliance through conciliation and persuasion, pursuant to § 60-1.33. The “reasonable efforts” standard shall be interpreted consistently with title VII of the Civil Rights Act of 1964 and its requirement that the Equal Employment Opportunity Commission endeavor to remove any such alleged unlawful employment practice by informal methods of conference, conciliation, and persuasion. Before the contractor can be found to be in compliance with the order, it must make a specific commitment, in writing, to correct any such deficiencies. The commitment must include the precise action to be taken and dates for completion. The time period allotted shall be no longer than the minimum period necessary to effect such changes. Upon approval of the commitment, the contractor may be considered in compliance, on condition that the commitments are faithfully kept. The contractor shall be notified that making such commitments does not preclude future determinations of noncompliance based on a finding that the commitments are not sufficient to achieve compliance.
(c) [Reserved]
(d) Preaward compliance evaluations. Each agency shall include in the invitation for bids for each formally advertised nonconstruction contract or state at the outset of negotiations for each negotiated contract, that if the award, when let, should total $10 million or more, the prospective contractor and its known first-tier subcontractors with subcontracts of $10 million or more shall be subject to a compliance evaluation before the award of the contract unless OFCCP has conducted an evaluation and found them to be in compliance with the Order within the preceding 24 months. The awarding agency will notify OFCCP and request appropriate action and findings in accordance with this subsection. Within 15 days of the notice OFCCP will inform the awarding agency of its intention to conduct a preaward compliance evaluation. If OFCCP does not inform the awarding agency within that period of its intention to conduct a preaward compliance evaluation, clearance shall be presumed and the awarding agency is authorized to proceed with the award. If OFCCP informs the awarding agency of its intention to conduct a preaward compliance evaluation, OFCCP shall be allowed an additional 20 days after the date that it so informs the awarding agency to provide its conclusions. If OFCCP does not provide the awarding agency with its conclusions within that period, clearance shall be presumed and the awarding agency is authorized to proceed with the award.
(e) Submission of Documents; Standard Affirmative Action Formats. Each prime contractor or subcontractor with 50 or more employees and a contract of $50,000 or more is required to develop a written affirmative action program for each of its establishments (§ 60-1.40). If a contractor fails to submit an affirmative action program and supporting documents, including the workforce analysis, within 30 days of a request, the enforcement procedures specified in § 60-1.26(b) shall be applicable. Contractors may reach agreement with OFCCP on nationwide AAP formats or on frequency of updating statistics.
(f) Confidentiality and relevancy of information. If the contractor is concerned with the confidentiality of such information as lists of employee names, reasons for termination, or pay data, then alphabetic or numeric coding or the use of an index of pay and pay ranges, consistent with the ranges assigned to each job group, are acceptable for purposes of the compliance evaluation. The contractor must provide full access to all relevant data on-site as required by § 60-1.43. Where necessary, the compliance officer may take information made available during the on-site evaluation off-site for further analysis. An off-site analysis should be conducted where issues have arisen concerning deficiencies or an apparent violation which, in the judgment of the compliance officer, should be more thoroughly analyzed off-site before a determination of compliance is made. The contractor must provide all data determined by the compliance officer to be necessary for off-site analysis. Such data may only be coded if the contractor makes the key to the code available to the compliance officer. If the contractor believes that particular information which is to be taken off-site is not relevant to compliance with the Executive Order, the contractor may request a ruling by the OFCCP District/Area Director. The OFCCP District/Area Director shall issue a ruling within 10 days. The contractor may appeal that ruling to the OFCCP Regional Director within 10 days. The Regional Director shall issue a final ruling within 10 days. Pending a final ruling, the information in question must be made available to the compliance officer off-site, but shall be considered a part of the investigatory file and subject to the provisions of paragraph (g) of this section. The agency shall take all necessary precautions to safeguard the confidentiality of such information until a final determination is made. Such information may not be copied by OFCCP and access to the information shall be limited to the compliance officer and personnel involved in the determination of relevancy. Data determined to be not relevant to the investigation will be returned to the contractor immediately.
(g) Public Access to Information. OFCCP will treat information obtained in the compliance evaluation as confidential to the maximum extent the information is exempt from public disclosure under the Freedom of Information Act, 5 U.S.C. 552. It is the practice of OFCCP not to release data where the contractor is still in business, and the contractor indicates, and through the Department of Labor review process it is determined, that the data are confidential and sensitive and that the release of data would subject the contractor to commercial harm.
[43 FR 49240, Oct. 20, 1978; 43 FR 51400, Nov. 3, 1978, as amended at 62 FR 44189, Aug. 19, 1997; 70 FR 36265, June 22, 2005; 79 FR 72994, Dec. 9, 2014; 88 FR 51734, Aug. 4, 2023]
§ 60-1.21 - Filing complaints.
Complaints shall be filed within 180 days of the alleged violation unless the time for filing is extended by the Director for good cause shown.
[43 FR 49240, Oct. 20, 1978; 43 FR 51400, Nov. 3, 1978, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.22 - Where to file.
Complaints may be filed with the OFCCP, 200 Constitution Avenue, NW., Washington, DC 20210, or with any OFCCP regional or area office.
§ 60-1.23 - Contents of complaint.
(a) The complaint shall include the name, address, and telephone number of the complainant, the name and address of the contractor or subcontractor committing the alleged discrimination, a description of the acts considered to be discriminatory, and any other pertinent information which will assist in the investigation and resolution of the complaint. The complaint shall be signed by the complainant or his/her authorized representative. Complaints alleging class-type violations which do not identify the alleged discriminatee or discriminatees will be accepted, provided the other requirements of this paragraph are met.
(b) If a complaint contains incomplete information, OFCCP shall seek the needed information from the complainant. In the event such information is not furnished to the Director within 60 days of the date of such request, the case may be closed.
[43 FR 49240, Oct. 20, 1978, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.24 - Processing of matters.
(a) Complaints. OFCCP may refer appropriate complaints to the Equal Employment Opportunity Commission (EEOC) for processing under Title VII of the Civil Rights Act of 1964, as amended, rather than processing under E.O. 11246 and the regulations in this chapter. Upon referring complaints to the EEOC, OFCCP shall promptly notify complainant(s) and the contractor of such referral.
(b) Complaint investigations. In conducting complaint investigations, OFCCP shall, as a minimum, conduct a thorough evaluation of the allegations of the complaint and shall be responsible for developing a complete case record. The case record should contain the name, address, and telephone number of each person interviewed, the interview statements, copies, transcripts, or summaries (where appropriate) of pertinent documents, a reference to at least one covered contract, and a narrative report of the investigation with references to exhibits and other evidence which relate to the alleged violations.
(c)(1) [Reserved]
(2) If any complaint investigation or compliance review indicates a violation of the equal opportunity clause, the matter should be resolved by informal means whenever possible. Such informal means may include the holding of a compliance conference.
(3) Where any complaint investigation or compliance review indicates a violation of the equal opportunity clause and the matter has not been resolved by informal means, the Director shall proceed in accordance with § 60-1.26.
(4) When a prime contractor or subcontractor, without a hearing, shall have complied with the recommendations or orders of the Director and believes such recommendations or orders to be erroneous, he shall, upon filing a request therefor within ten days of such compliance, be afforded an opportunity for a hearing and review of the alleged erroneous action.
(5) For reasonable cause shown, the Director may reconsider or cause to be reconsidered any matter on his/her own motion or pursuant to a request.
(d) Reports to the Director. (1) With the exception of complaints which have been referred to EEOC, within 60 days from receipt of a complaint or within such additional time as may be allowed by the Director for good cause shown, the complaint shall be processed and the case record developed containing the following information:
(i) Name and address of the complainant;
(ii) Brief summary of findings, including a statement regarding the contractor's compliance or noncompliance with the requirements of the equal opportunity clause;
(iii) A statement of the disposition of the case, including any corrective action taken and any sanctions or penalties imposed or, whenever appropriate, the recommended corrective action and sanctions or penalties.
(2) A written report of every preaward compliance review required by this regulation or otherwise required by the Director, shall be developed and maintained.
(3) A written report of every other compliance review or any other matter processed involving an apparent violation of the equal opportunity clause shall be made. Such report shall contain a brief summary of the findings, including a statement of conclusions regarding the contractor's compliance or noncompliance with the requirements of the order, and a statement of the disposition of the case, including any corrective action taken or recommended and any sanctions or penalties imposed or recommended.
[43 FR 49240, Oct. 20, 1978, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.25 - Assumption of jurisdiction by or referrals to the Director.
The Director may inquire into the status of any matter pending before an agency. Where he considers it necessary or appropriate to the achievement of the purposes of the order, he may assume jurisdiction over the matter and proceed as provided herein. Whenever the Director assumes jurisdiction over any matter, or an agency refers any matter he may conduct, or have conducted, such investigations, hold such hearings, make such findings, issue such recommendations and directives, order such sanctions and penalties, and take such other action as may be necessary or appropriate to achieve the purposes of the order. The Director shall promptly notify the agency of any corrective action to be taken or any sanctions to be taken or any sanction to be imposed by the agency. The agency shall take such action, and report the results thereof to the Director within the time specified.
[43 FR 49240, Oct. 20, 1978, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.26 - Enforcement proceedings.
(a) General. (1) Violations of the Order, the equal opportunity clause, the regulations in this chapter, or applicable construction industry equal employment opportunity requirements, may result in the institution of administrative or judicial enforcement proceedings. Violations may be found based upon, inter alia, any of the following:
(i) The results of a complaint investigation;
(ii) The results of a compliance evaluation;
(iii) Analysis of an affirmative action program;
(iv) The results of an on-site review of the contractor's compliance with the Order and its implementing regulations;
(v) A contractor's refusal to submit an affirmative action program;
(vi) A contractor's refusal to allow an on-site compliance evaluation to be conducted;
(vii) A contractor's refusal to provide data for off-site review or analysis as required by the regulations in this chapter;
(viii) A contractor's refusal to establish, maintain and supply records or other information as required by the regulations in this chapter or applicable construction industry requirements;
(ix) A contractor's alteration or falsification of records and information required to be maintained by the regulations in this chapter; or
(x) Any substantial or material violation or the threat of a substantial or material violation of the contractural provisions of the Order, or of the rules or regulations in this chapter.
(2) OFCCP may seek back pay and other make whole relief for victims of discrimination identified during a complaint investigation or compliance evaluation. Such individuals need not have filed a complaint as a prerequisite to OFCCP seeking such relief on their behalf. Interest on back pay shall be calculated from the date of the loss and compounded quarterly at the percentage rate established by the Internal Revenue Service for the under-payment of taxes.
(b) Administrative enforcement. (1) OFCCP may refer matters to the Solicitor of Labor with a recommendation for the institution of administrative enforcement proceedings, which may be brought to enjoin violations, to seek appropriate relief, and to impose appropriate sanctions. The referral may be made when violations have not been corrected in accordance with the conciliation procedures in this chapter, or when OFCCP determines that referral for consideration of formal enforcement (rather than settlement) is appropriate. However, if a contractor refuses to submit an affirmative action program, or refuses to supply records or other requested information, or refuses to allow OFCCP access to its premises for an on-site review, and if conciliation efforts under this chapter are unsuccessful, OFCCP may immediately refer the matter to the Solicitor, notwithstanding other requirements of this chapter.
(2) Administrative enforcement proceedings shall be conducted under the control and supervision of the Solicitor of Labor and under the Rules of Practice for Administrative Proceedings to Enforce Equal Opportunity under Executive Order 11246 contained in part 60-30 of this chapter and the Rules of Evidence set out in the Rules of Practice and Procedure for Administrative Hearings Before the Office of Administrative Law Judges contained in 29 CFR part 18, subpart B: Provided, That a Final Administrative Order shall be issued within on year from the date of the issuance of the recommended findings, conclusions and decision of the Administrative Law Judge, or the submission of any exceptions and responses to exceptions to such decision (if any), whichever is later.
(c) Referrals to the Department of Justice. (1) The Director may refer matters to the Department of Justice with a recommendation for the institution of judicial enforcement proceedings. There are no procedural prerequisites to a referral to the Department of Justice. Such referrals may be accomplished without proceeding through the conciliation procedures in this chapter, and a referral may be made at any stage in the procedures under this chapter.
(2) Whenever a matter has been referred to the Department of Justice for consideration of judicial enforcement, the Attorney General may bring a civil action in the appropriate district court of the United States requesting a temporary restraining order, preliminary or permanent injunction (including relief against noncontractors, including labor unions, who seek to thwart the implementation of the Order and regulations), and an order for such additional sanctions or relief, including back pay, deemed necessary or appropriate to ensure the full enjoyment of the rights secured by the Order, or any of the above in this paragraph (c)(2).
(3) The Attorney General is authorized to conduct such investigation of the facts as he/she deem necessary or appropriate to carry out his/her responsibilities under the regulations in this chapter.
(4) Prior to the institution of any judicial proceedings, the Attorney General, on behalf of the Director, is authorized to make reasonable efforts to secure compliance with the contract provisions of the Order. The Attorney General may do so by providing the contractor and any other respondent with reasonable notice of his/her findings, his/her intent to file suit, and the actions he/she believes necessary to obtain compliance with the contract provisions of the Order without contested litigation, and by offering the contractor and any other respondent a reasonable opportunity for conference and conciliation, in an effort to obtain such compliance without contested litigation.
(5) As used in the regulations in this part, the Attorney General shall mean the Attorney General, the Assistant Attorney General for Civil Rights, or any other person authorized by regulations or practice to act for the Attorney General with respect to the enforcement of equal employment opportunity laws, orders and regulations generally, or in a particular matter or case.
(6) The Director or his/her designee, and representatives of the Attorney General may consult from time to time to determine what investigations should be conducted to determine whether contractors or groups of contractors or other persons may be engaged in patterns or practices in violation of the Executive Order or these regulations, or of resistance to or interference with the full enjoyment of any of the rights secured by them, warranting judicial proceedings.
(d) Initiation of lawsuits by the Attorney General without referral from the Director. In addition to initiating lawsuits upon referral under this section, the Attorney General may, subject to approval by the Director, initiate independent investigations of contractors which he/she has reason to believe may be in violation of the Order or the rules and regulations issued pursuant thereto. If, upon completion of such an investigation, the Attorney General determines that the contractor has in fact violated the Order or the rules and regulations issued thereunder, he/she shall make reasonable efforts to secure compliance with the contract provisions of the Order. He/she may do so by providing the contractor and any other respondent with reasonable notice of the Department of Justice's findings, its intent to file suit, and the actions that the Attorney General believes are necessary to obtain compliance with the contract provisions of the Order without contested litigation, and by offering the contractor and any other respondent a reasonable opportunity for conference and conciliation in an effort to obtain such compliance without contested litigation. If these efforts are unsuccessful, the Attorney General may, upon approval by the Director, bring a civil action in the appropriate district court of the United States requesting a temporary restraining order, preliminary or permanent injunction, and an order for such additional sanctions or equitable relief, including back pay, deemed necessary or appropriate to ensure the full enjoyment of the rights secured by the Order or any of the above in this paragraph (d).
(e) To the extent applicable, this section and part 60-30 of this chapter shall govern proceedings resulting from any Director's determinations under § 60-2.2(b) of this chapter.
[62 FR 44190, Aug. 19, 1997, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.27 - Sanctions.
(a) General. The sanctions described in subsections (1), (5), and (6) of section 209(a) of the Order may be exercised only by or with the approval of the Director. Referral of any matter arising under the Order to the Department of Justice or to the Equal Employment Opportunity Commission shall be made by the Director.
(b) Debarment. A contractor may be debarred from receiving future contracts or modifications or extensions of existing contracts, subject to reinstatement pursuant to § 60-1.31, for any violation of Executive Order 11246 or the implementing rules, regulations and orders of the Secretary of Labor. Debarment may be imposed for an indefinite term or for a fixed minimum period of at least six months.
[62 FR 44191, Aug. 19, 1997]
§ 60-1.28 - [Reserved]
§ 60-1.29 - Preaward notices.
(a) Preaward compliance reviews. Upon the request of the Director, agencies shall not enter into contracts or approve the entry into contracts or subcontracts with any bidder, prospective prime contractor, or proposed subcontractor named by the Director until a preaward compliance review has been conducted and the Director or his designee has approved a determination that the bidder, prospective prime contractor or proposed subcontractor will be able to comply with the provisions of the equal opportunity clause.
(b) Other special preaward procedures. Upon the request of the Director, agencies shall not enter into contracts or approve the entry into subcontracts with any bidder; prospective prime contractor or proposed subcontractor specified by the Director until the agency has complied with the directions contained in the request.
[43 FR 49240, Oct. 20, 1978, as amended at 62 FR 66971, Dec. 22, 1997]
§ 60-1.30 - Notification of agencies.
The Director shall ensure that the heads of all agencies are notified of any debarment taken against any contractor.
[62 FR 44191, Aug. 19, 1997]
§ 60-1.31 - Reinstatement of ineligible contractors.
A contractor debarred from further contracts for an indefinite period under the Order may request reinstatement in a letter filed with the Director at any time after the effective date of the debarment. A contractor debarred for a fixed period may request reinstatement in a letter filed with the Director 30 days prior to the expiration of the fixed debarment period, or at any time thereafter. The filing of a reinstatement request 30 days before a fixed debarment period ends will not result in early reinstatement. In connection with the reinstatement proceedings, all debarred contractors shall be required to show that they have established and will carry out employment policies and practices in compliance with the Order and implementing regulations. Before reaching a decision, the Director may conduct a compliance evaluation of the contractor and may require the contractor to supply additional information regarding the request for reinstatement. The Director shall issue a written decision on the request.
[62 FR 44192, Aug. 19, 1997]
§ 60-1.32 - Intimidation and interference.
(a) The contractor, subcontractor or applicant shall not harass, intimidate, threaten, coerce, or discriminate against any individual because the individual has engaged in or may engage in any of the following activities:
(1) Filing a complaint;
(2) Assisting or participating in any manner in an investigation, compliance evaluation, hearing, or any other activity related to the administration of the Order or any other Federal, state or local law requiring equal opportunity;
(3) Opposing any act or practice made unlawful by the Order or any other Federal, state or local law requiring equal opportunity; or
(4) Exercising any other right protected by the Order.
(b) The contractor, subcontractor or applicant shall ensure that all persons under its control do not engage in such harassment, intimidation, threats, coercion or discrimination. The sanctions and penalties contained in this part may be exercised by OFCCP against any contractor, subcontractor or applicant who violates this obligation.
[62 FR 44192, Aug. 19, 1997]
§ 60-1.33 - Pre-enforcement notice and conciliation procedures.
(a) Predetermination Notice. If a compliance evaluation by OFCCP indicates preliminary findings of potential discrimination, OFCCP will issue a Predetermination Notice that describes the preliminary findings and provides the contractor an opportunity to respond. The Predetermination Notice may also include preliminary findings of other potential violations that OFCCP has identified at that stage of the review. After OFCCP issues the Predetermination Notice, the agency may identify additional violations and include them in a subsequent Notice of Violation or Show Cause Notice without amending the Predetermination Notice. OFCCP will provide the contractor an opportunity to conciliate additional violations identified in the Notice of Violation or Show Cause Notice. Any response to a Predetermination Notice must be received by OFCCP within 15 calendar days of receipt of the Notice, which deadline OFCCP may extend for good cause. If the contractor does not respond or OFCCP determines that the contractor's response and any additional investigation undertaken by the agency did not resolve the preliminary findings of potential discrimination or other violations identified in the Predetermination Notice, OFCCP will proceed to issue a Notice of Violation.
(b) Notice of Violation. If a compliance evaluation by OFCCP indicates a violation of the equal opportunity clause, OFCCP will issue a Notice of Violation to the contractor requiring corrective action. The Notice of Violation will identify the violations found and describe the recommended corrective actions. The Notice of Violation will invite the contractor to conciliate the matter and resolve the findings through a written conciliation agreement. After the Notice of Violation is issued, OFCCP may include additional violations in a subsequent Show Cause Notice without amendment to the Notice of Violation. OFCCP will provide the contractor an opportunity to conciliate additional violations identified in the Show Cause Notice.
(c) Conciliation agreement. If a compliance review, complaint investigation, or other review by OFCCP or its representative indicates a material violation of the equal opportunity clause, and:
(1) If the contractor, subcontractor, or bidder is willing to correct the violations and/or deficiencies; and
(2) If OFCCP or its representative determines that settlement (rather than referral for consideration of formal enforcement) is appropriate, a written conciliation agreement shall be required. The agreement shall provide for such remedial action as may be necessary to correct the violations and/or deficiencies identified, including, where appropriate (but not limited to), remedies such as back pay, salary adjustments, and retroactive seniority.
(d) Show Cause Notice. When the Director has reasonable cause to believe that a contractor has violated the equal opportunity clause the Director may issue a notice requiring the contractor to show cause, within 30 days, why monitoring, enforcement proceedings, or other appropriate action to ensure compliance should not be instituted. OFCCP may issue a Show Cause Notice without first issuing a Predetermination Notice or Notice of Violation when the contractor has failed to provide access to its premises for an on-site review or refused to provide access to witnesses, records, or other information. The Show Cause Notice will include each violation that OFCCP has identified at the time of issuance. Where OFCCP identifies additional violations after issuing a Show Cause Notice, OFCCP will modify or amend the Show Cause Notice.
(e) Expedited conciliation option. OFCCP may agree to waive the procedures set forth in paragraphs (a) and/or (b) of this section to enter directly into a conciliation agreement with a contractor. OFCCP may offer the contractor this expedited conciliation option but may not require or insist that the contractor avail itself of the expedited conciliation option.
[88 FR 51734, Aug. 4, 2023]
§ 60-1.34 - Violation of a Conciliation Agreement.
When a conciliation agreement has been violated, the following procedures are applicable:
(a) A written notice shall be sent to the contractor setting forth the violations alleged and summarizing the supporting evidence. The contractor shall have 15 days from receipt of the notice to respond, except in those cases in which such a delay would result in irreparable injury to the employment rights of affected employees or applicants.
(b) During the 15-day period the contractor may demonstrate in writing that it has not violated its commitments.
(c) If the contractor is unable to demonstrate that it has not violated its commitments, or if the complaint alleges irreparable injury, enforcement proceedings may be initiated immediately without issuing a show cause notice or proceeding through any other requirement contained in this chapter.
(d) In any proceeding involving an alleged violation of a conciliation agreement OFCCP may seek enforcement of the agreement itself and shall not be required to present proof of the underlying violations resolved by the agreement.
(E.O. 11246 (30 FR 12319) as amended by E.O. 11375 and 12086)
[44 FR 77002, Dec. 28, 1979, as amended at 62 FR 44192, Aug. 19, 1997; 70 FR 36265, June 22, 2005]
§ 60-1.35 - Contractor obligations and defenses to violation of the nondiscrimination requirement for compensation disclosures.
(a) General defenses. A contractor may pursue a defense to an alleged violation of paragraph (3) of the equal opportunity clauses listed in § 60-1.4(a) and (b) as long as the defense is not based on a rule, policy, practice, agreement, or other instrument that prohibits employees or applicants from discussing or disclosing their compensation or the compensation of other employees or applicants, subject to paragraph (3) of the equal opportunity clause. Contractors may pursue this defense by demonstrating, for example, that it disciplined the employee for violation of a consistently and uniformly applied company policy, and that this policy does not prohibit, or tend to prohibit, employees or applicants from discussing or disclosing their compensation or the compensation of other employees or applicants.
(b) Essential job functions defense. Actions taken by a contractor which adversely affect an employee will not be deemed to be discriminatory if the employee has access to the compensation information of other employees or applicants as part of such employee's essential job functions and disclosed the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, and the disclosure was not in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the contractor, or is consistent with the contractor's legal duty to furnish information.
(c) Dissemination of nondiscrimination provision. The contractor or subcontractor shall disseminate the nondiscrimination provision, using the language as prescribed by the Director of OFCCP, to employees and applicants:
(1) The nondiscrimination provision shall be incorporated into existing employee manuals or handbooks; and
(2) The nondiscrimination provision shall be disseminated to employees and applicants. Dissemination of the provision shall be executed by electronic posting or by posting a copy of the provision in conspicuous places available to employees and applicants for employment.
[80 FR 54977, Sept. 11, 2015]
authority: Sec. 201, E.O. 11246, 30 FR 12319, 3 CFR, 1964-1965 Comp., p. 339, as amended by E.O. 11375, 32 FR 14303, 3 CFR, 1966-1970 Comp., p. 684, E.O. 12086, 43 FR 46501, 3 CFR, 1978 Comp., p. 230, E.O. 13279, 67 FR 77141, 3 CFR, 2002 Comp., p. 258 and E.O. 13672, 79 FR 42971
source: 43 FR 49240, Oct. 20, 1978, unless otherwise noted.
cite as: 41 CFR 60-1.30