Regulations last checked for updates: Oct 19, 2024

Title 43 - Public Lands: Interior last revised: Sep 06, 2024
§ 3176.1 - Authority.

This subpart is established pursuant to the authority granted to the Secretary of the Interior through various Federal and Indian mineral leasing statutes and the Federal Oil and Gas Royalty Management Act of 1982. This authority has been delegated to the Bureau of Land Management and is implemented by the onshore oil and gas operating regulations contained in 43 CFR part 3160. More specifically, this subpart implements and supplements the provisions of 43 CFR 3162.1, 3162.5-1(a), (c), and (d), 3162.5-2(a), and 3162.5-3.

§ 3176.2 - Purpose.

The purpose of this subpart is to protect public health and safety and those personnel essential to maintaining control of the well. This subpart identifies the Bureau of Land Management's uniform national requirements and minimum standards of performance expected from operators when conducting operations involving oil or gas that is known or could reasonably be expected to contain hydrogen sulfide (H2S) or which results in the emission of sulfur dioxide (SO2) as a result of flaring H2S. This subpart also identifies the gravity of violations, probable corrective action(s), and normal abatement periods.

§ 3176.3 - Scope.

(a) This subpart is applicable to all onshore Federal and Indian (except Osage Tribe) oil and gas leases when drilling, completing, testing, reworking, producing, injecting, gathering, storing, or treating operations are being conducted in zones which are known or could reasonably be expected to contain H2S or which, when flared, could produce SO2, in such concentrations that upon release could constitute a hazard to human life. The requirements and minimum standards of this subpart do not apply when operating in zones where H2S is presently known not to be present or cannot reasonably be expected to be present in concentrations of 100 parts per million (ppm) or more in the gas stream.

(b) The requirements and minimum standards in this subpart do not relieve an operator from compliance with any applicable Federal, State, or local requirement(s) regarding H2S or SO2 which are more stringent.

§ 3176.4 - Definitions.

As used in this subpart, the term:

Authorized officer means any employee of the Bureau of Land Management authorized to perform the duties described in 43 CFR parts 3000 and 3100 (43 CFR 3000.0-5).

Christmas tree means an assembly of valves and fittings used to control production and provide access to the producing tubing string. The assembly includes all equipment above the tubinghead top flange.

Dispersion technique means a mathematical representation of the physical and chemical transportation, dilution, and transformation of H2S gas emitted into the atmosphere.

Escape rate means that the maximum volume (Q) used as the escape rate in determining the radius of exposure shall be that specified in paragraphs (1) through (4) of this definition, as applicable:

(1) For a production facility, the escape rate shall be calculated using the maximum daily rate of gas produced through that facility or the best estimate thereof;

(2) For gas wells, the escape rate shall be calculated by using the current daily absolute open-flow rate against atmospheric pressure;

(3) For oil wells, the escape rate shall be calculated by multiplying the producing gas/oil ratio by the maximum daily production rate or best estimate thereof; or

(4) For a well being drilled in a developed area, the escape rate may be determined by using the offset wells completed in the interval(s) in question.

Essential personnel means those on-site personnel directly associated with the operation being conducted and necessary to maintain control of the well.

Exploratory well means any well drilled beyond the known producing limits of a pool.

Gas well means a well for which the energy equivalent of the gas produced, including the entrained liquid hydrocarbons, exceeds the energy equivalent of the oil produced.

H2S Drilling Operations Plan means a written plan which provides for safety of essential personnel and for maintaining control of the well with regard to H2S and SO2.

Lessee means a person or entity holding record title in a lease issued by the United States (43 CFR 3160.0-5).

Major violation means noncompliance which causes or threatens immediate. substantial, and adverse impacts on public health and safety, the environment, production accountability, or royalty income (43 CFR 3160.0-5).

Minor violation means noncompliance which does not rise to the level of a major violation (43 CFR 3160.0-5).

Oil well means a well for which the energy equivalent of the oil produced exceeds the energy equivalent of the gas produced, including the entrained liquid hydrocarbons.

Operating rights owner means a person or entity holding operating rights in a lease issued by the United States. A lessee may also be an operating rights owner if the operating rights in a lease or portion thereof have not been severed from record title (43 CFR 3160.0-5).

Operator means any person or entity including but not limited to the lessee or operating rights owner who has stated in writing to the authorized officer that he/she is responsible under the terms of the lease for the operations conducted on the leased lands or a portion thereof (43 CFR 3160.0-5).

Potentially hazardous volume means a volume of gas of such H2S concentration and flow rate that it may result in radius of exposure-calculated ambient concentrations of 100 ppm H2S at any occupied residence, school, church, park, school bus stop, place of business, or other area where the public could reasonably be expected to frequent, or 500 ppm H2S at any Federal, State, County, or municipal road or highway.

Production facilities means any wellhead, flowline, piping, treating, or separating equipment, water disposal pits, processing plant, or combination thereof prior to the approved measurement point for any lease, communitization agreement, or unit participating area.

Prompt correction means immediate correction of violations, with operation suspended if required at the discretion of the authorized officer.

Public Protection Plan means a written plan which provides for the safety of the potentially affected public with regard to H2S and SO2.

Radius of exposure means the calculation resulting from using the following Pasquill-Gifford derived equation, or by such other method(s) as may be approved by the authorized officer:

(1) For determining the 100 ppm radius of exposure where the H2S concentration in the gas stream is less than 10:

X = [1.589)(H2S concentration)(Q)] (0.6258); or

(2) For determining the 500 ppm radius of exposure where the H2S concentration in the gas stream is less than 10:

X = [(0.4546)(H2S concentration)(Q)] (0.6258) Where: X = radius of exposure in feet; H2S Concentration = decimal equivalent of the mole or volume fractions of H2S in the gaseous mixture; and Q = maximum volume of gas determined to be available for escape in cubic feet per day (at standard conditions of 14.73 psia and 60 °F).

(3) For determining the 100 ppm or the 500 ppm radius of exposure in gas streams containing H2S concentrations of 10 percent or greater, a dispersion technique that takes into account representative wind speed, direction, atmospheric stability, complex terrain, and other dispersion features shall be utilized. Such techniques may include, but shall not be limited to, one of a series of computer models outlined in the Environmental Protection Agency's “Guidelines on Air Quality Models” (EPA-450/2-78-027R).

(4) Where multiple H2S sources (i.e., wells, treatment equipment, flowlines, etc.) are present, the operator may elect to utilize a radius of exposure which covers a larger area than would be calculated using radius of exposure formula for each component part of the drilling/completion/workover/production system.

(5) For a well being drilled in an area where insufficient data exits to calculate a radius of exposure, but where H2S could reasonably be expected to be present in concentrations in excess of 100 ppm in the gas stream, a 100 ppm radius of exposure equal to 3,000 feet shall be assumed.

Zones known not to contain H2S means geological formations in a field where prior drilling, logging, coring, testing, or producing operations have confirmed the absence of H2S-bearing zones that contain 100 ppm or more of H2S in the gas stream.

Zones known to contain H2S means geological formations in a field where prior drilling, logging, coring, testing, or producing operations have confirmed that H2S-bearing zones will be encountered that contain 100 ppm or more of H2S in the gas stream.

Zones which can reasonably be expected to contain H2S means geological formations in the area which have not had prior drilling, but prior drilling to the same formations in similar field(s) within the same geologic basin indicates there is a potential for 100 ppm or more of H2S in the gas stream.

Zones which cannot reasonably be expected to contain H2S means geological formations in the area which have not had prior drilling, but prior drilling to the same formations in similar field(s) within the same geologic basin indicates there is not a potential for 100 ppm or more of H2S in the gas stream.

§ 3176.5 - Requirements.

The requirements of this subpart are the minimum acceptable standards with regard to H2S operations. This subpart also classifies violations as typically major or minor for purposes of the assessment and penalty provisions of 43 CFR part 3160, subpart 3163, specifies the corrective action which will probably be required, and establishes the normal abatement period following detection of a major or minor violation in which the violator may take such corrective action without incurring an assessment. However, the authorized officer may, after consideration of all appropriate factors, require reasonable and necessary standards, corrective actions, and abatement periods that may, in some cases, vary from those specified in this subpart that he/she determines to be necessary to protect public health and safety, the environment, or to maintain control of a well to prevent waste of Federal mineral resources. To the extent such standards, actions, or abatement periods differ from those set forth in this subpart, they may be subject to review pursuant to 43 CFR 3165.3.

§ 3176.6 - Applications, approvals, and reports.

(a) Drilling. For proposed drilling operations where formations will be penetrated which have zones known to contain or which could reasonably be expected to contain concentrations of H2S of 100 ppm or more in the gas stream, the H2S Drilling Operation Plan and, if the applicability criteria in § 3176.7(a) are met, a Public Protection Plan as outlined in § 3176.7(b), shall be submitted as part of the Application for Permit to Drill (APD) (refer to subpart 3171 of this part). In cases where multiple filings are being made with a single drilling plan, a single H2S Drilling Operations Plan and, if applicable, a single Public Protection Plan may be submitted for the lease, communitization agreement, unit, or field in accordance with subpart 3171. Failure to submit either the H2S Drilling Operations Plan or the Public Protection Plan when required by this subpart shall result in an incomplete APD pursuant to 43 CFR 3162.3-1.

(b) Drilling plan. The H2S Drilling Operations Plan shall fully describe the manner in which the requirements and minimum standards in § 3176.8, shall be met and implemented. As required by this subpart (§ 3176.8), the following must be submitted in the H2S Drilling Operations Plan:

(1) Statement that all personnel shall receive proper H2S training in accordance, with § 3176.8(c)(1).

(2) A legible well site diagram of accurate scale (may be included as part of the well site layout as required by subpart 3171 of this part) showing the following:

(i) Drill rig orientation;

(ii) Prevailing wind direction;

(iii) Terrain of surrounding area;

(iv) Location of all briefing areas (designate primary briefing area);

(v) Location of access road(s) (including secondary egress);

(vi) Location of flare line(s) and pit(s);

(vii) Location of caution and/or danger signs; and

(viii) Location of wind direction indicators.

(3) As required by this subpart, a complete description of the following H2S safety equipment/systems:

(i) Well control equipment. (A) Flare line(s) and means of ignition;

(B) Remote controlled choke;

(C) Flare gun/flares; and

(D) Mud-gas separator and rotating head (if exploratory well);

(ii) Protective equipment for essential personnel. (A) Location, type, storage, and maintenance of all working and escape breathing apparatus; and

(B) Means of communication when using protective breathing apparatus;

(iii) H2S detection and monitoring equipment. (A) H2S sensors and associated audible/visual alarm(s); and

(B) Portable H2S and SO2 monitor(s);

(iv) Visual warning systems. (A) Wind direction indicators; and (B) Caution/danger sign(s) and flag(s);

(v) Mud program. (A) Mud system and additives; and (B) Mud degassing system;

(vi) Metallurgy. Metallurgical properties of all tubular goods and well control equipment which could be exposed to H2S (§ 3176.8(d)(3)); and

(vii) Communication. Means of communication from wellsite.

(4) Plans for well testing.

(c) Production. (1) For each existing production facility having an H2S concentration of 100 ppm or more in the gas stream, the operator shall calculate and submit the calculations to the authorized officer within 180 days of January 22, 1991, the 100 and, if applicable, the 500 ppm radii of exposure for all facilities to determine if the applicability criteria in § 3176.7(a) are met. Radii of exposure calculations shall not be required for oil or water flowlines. Further, if any of the applicability criteria (§ 3176.7(a)) are met, the operator shall submit a complete Public Protection Plan which meets the requirements of § 3176.7(b)(2) to the authorized officer within 1 year of January 22, 1991. For production facilities constructed after January 22, 1991, and meeting the minimum concentration (100 ppm in gas stream), the operator shall report the radii of exposure calculations, and if the applicability criteria in § 3176.7(a) are met, submit a complete Public Protection Plan (§ 3176.7(b)(2)) to the authorized officer within 60 days after completion of production facilities.

Table 1 to § 3176.6(c)(1)

Violation Corrective action Normal abatement period
Minor for failure to submit required informationSubmit required information (radii of exposure and/or complete Public Protection Plan)20 to 40 days.

(2) The operator shall initially test the H2S concentration of the gas stream for each well or production facility and shall make the results available to the authorized officer, upon request.

Table 2 to § 3176.6(c)(2)

Violation Corrective action Normal abatement period
MinorTest gas from well or production facility20 to 40 days.

(3) If operational or production alterations result in a 5 percent or more increase in the H2S concentration (i.e., well recompletion, increased gas-to-oil ratios) or the radius of exposure as calculated under paragraph (c)(1) of this section, notification of such changes shall be submitted to the authorized officer within 60 days after identification of the change.

Table 3 to § 3176.6(c)(3)

Violation Corrective action Normal abatement period
MinorSubmit information to authorized officer20 to 40 days.

(d) Plans and reports. (1) H2S Drilling Operations Plan(s) or Public Protection Plan(s) shall be reviewed by the operator on an annual basis and a copy of any necessary revisions shall be submitted to the authorized officer upon request.

Table 4 to § 3176.6(d)(1)

Violation Corrective action Normal abatement period
MinorSubmit information to authorized officer20 to 40 days.

(2) Any release of a potentially hazardous volume of H2S shall be reported to the authorized officer as soon as practicable, but no later than 24 hours following identification of the release.

Table 5 to § 3176.6(d)(2)

Violation Corrective action Normal abatement period
MinorReport undesirable event to the authorized officer24 hours.
§ 3176.7 - Public protection.

(a) Applicability criteria. For both drilling/completion/workover and production operations, the H2S radius of exposure shall be determined on all wells and production facilities subject to this subpart. A Public Protection Plan (paragraph (b) of this section) shall be required when any of the following conditions apply:

(1) The 100 ppm radius of exposure is greater than 50 feet and includes any occupied residence, school, church, park, school bus stop, place of business, or other areas where the public could reasonably be expected to frequent;

(2) The 500 ppm radius of exposure is greater than 50 feet and includes any part of a Federal, State, County, or municipal road or highway owned and principally maintained for public use; or

(3) The 100 ppm radius of exposure is equal to or greater than 3,000 feet where facilities or roads are principally maintained for public use. Additional specific requirements for drilling/completion/workover or producing operations are described in §§ 3176.8 and 3176.9, respectively.

(b) Public Protection Plan—(1) Plan submission/implementation/availability. (i) A Public Protection Plan providing details of actions to alert and protect the public in the event of a release of a potentially hazardous volume of H2S shall be submitted to the authorized officer as required by § 3176.6(a) for drilling or by § 3176.6(c) for producing operations when the applicability criteria established in paragraph (a) of this section are met. One plan may be submitted for each well, lease, communitization agreement, unit, or field, at the operator's discretion. The Public Protection Plan shall be maintained and updated, in accordance with § 3176.6(d).

(ii) The Public Protection Plan shall be activated immediately upon detection of release of a potentially hazardous volume of H2S.

Table 1 to § 3176.7(b)(1)(ii)

Violation Corrective action Normal abatement period
MajorImmediate implementation of the Public Protection PlanPrompt correction required.

(iii) A copy of the Public Protection Plan shall be available at the drilling/completion site for such wells and at the facility, field office, or with the pumper, as appropriate, for producing wells, facilities, and during workover operations.

Table 2 to § 3176.7(b)(1)(iii)

Violation Corrective action Normal abatement period
MinorMake copy of Plan available24 hours (drilling/completion/workover), 5 to 7 days (production).

(2) Plan content. (i) The details of the Public Protection Plan may vary according to the site-specific characteristics (concentration, volume, terrain, etc.) expected to be encountered and the number and proximity of the population potentially at risk. In the areas of high population density or in other special cases, the authorized officer may require more stringent plans to be developed. These may include public education seminars, mass alert systems, and use of sirens, telephone, radio, and television depending on the number of people at risk and their location with respect to the well site.

(ii) The Public Protection Plan shall include:

(A) The responsibilities and duties of key personnel, and instructions for alerting the public and requesting assistance;

(B) A list of names and telephone numbers of residents, those responsible for safety of public roadways, and individuals responsible for the safety of occupants of buildings within the 100 ppm radius of exposure (e.g., school principals, building managers, etc.) as defined by the applicability criteria in paragraph (a) of this section. The operator shall ensure that those who are at the greatest risk are notified first. The Plan shall define when and how people are to be notified in case of an H2S emergency;

(C) A telephone call list (including telephone numbers) for requesting assistance from law enforcement, fire department, and medical personnel and Federal and State regulatory agencies, as required. Necessary information to be communicated and the emergency responses that may be required shall be listed. This information shall be based on previous contacts with these organizations;

(D) A legible 100 ppm (or 3,000 feet, if conditions unknown) radius plat of all private and public dwellings, schools, roads, recreational areas, and other areas where the public might reasonably be expected to frequent;

(E) Advance briefings, by visit, meeting, or letter to the people identified in paragraph (b)(2)(ii)(B) of this section, including:

(1) Hazards of H2S and SO2;

(2) Necessity for an emergency action plan;

(3) Possible sources of H2S and S02;

(4) Instructions for reporting a leak to the operator;

(5) The manner in which the public shall be notified of an emergency; and

(6) Steps to be taken in case of an emergency, including evacuation of any people;

(F) Guidelines for the ignition of the H2S bearing gas. The Plan shall designate the title or position of the person(s) who has the authority to ignite the escaping gas and define when, how, and by whom the gas is to be ignited;

(G) Additional measures necessary following the release of H2S and SO2 until the release is contained are as follows:

(1) Monitoring of H2S and SO2 levels and wind direction in the affected area;

(2) Maintenance of site security and access control;

(3) Communication of status of well control; and

(4) Other necessary measures as required by the authorized officer; and

(H) For production facilities, a description of the detection system(s) utilized to determine the concentration of H2S released.

§ 3176.8 - Drilling/completion/workover requirements.

(a) General. (1) A copy of the H2S Drilling Operations Plan shall be available during operations at the well site, beginning when the operation is subject to the terms of this subpart (i.e., 3 days or 500 feet of known or probable H2S zone).

Table 1 to § 3176.8(a)(1)

Violation Corrective action Normal abatement period
MinorMake copy of Plan available24 hours.

(2) Initial H2S training shall be completed and all H2S related safety equipment shall be installed, tested, and operational when drilling reaches a depth of 500 feet above, or 3 days prior to penetrating (whichever comes first) the first zone containing or reasonably expected to contain H2S. A specific H2S operations plan for completion and workover operations will not be required for approval. For completion and workover operations, all required equipment and warning systems shall be operational and training completed prior to commencing operations.

Table 2 to § 3176.8(a)(2)

Violation Corrective action Normal abatement period
MajorImplement H2S operational requirements, such as completion of training and/or installation, repair, or replacement of equipment, as necessaryPrompt correction required.

(3) If H2S was not anticipated at the time the APD was approved, but is encountered in excess of 100 ppm in the gas stream, the following measures shall be taken:

(i) The operator shall immediately ensure control of the well, suspend drilling ahead operations (unless detrimental to well control), and obtain materials and safety equipment to bring the operations into compliance with the applicable provisions of this subpart.

Table 3 to § 3176.8(a)(3)(i)

Violation Corrective action Normal abatement period
MajorImplement H2S operational requirements, as applicablePrompt correction required.

(ii) The operator shall notify the authorized officer of the event and the mitigating steps that have or are being taken as soon as possible, but no later than the next business day. If said notification is subsequent to actual resumption of drilling operations, the operator shall notify the authorized officer of the date that drilling was resumed no later than the next business day.

Table 4 to § 3176.8(a)(3)(ii)

Violation Corrective action Normal abatement period
MinorNotify authorized officer24 hours.

(iii) It is the operator's responsibility to ensure that the applicable requirements of this subpart have been met prior to the resumption of drilling ahead operations. Drilling ahead operations will not be suspended pending receipt of a written H2S Drilling Operations Plan(s) and, if necessary, Public Protection Plan(s) provided that complete copies of the applicable Plan(s) are filed with the authorized officer for approval within 5 business days following resumption of drilling ahead operations.

Table 5 to § 3176.8(a)(3)(iii)

Violation Corrective action Normal abatement period
MinorSubmit plans to authorized officer5 days.

(b) Locations. (1) Where practical, 2 roads shall be established, 1 at each end of the location, or as dictated by prevailing winds and terrain. If an alternate road is not practical, a clearly marked footpath shall be provided to a safe area. The purpose of such an alternate escape route is only to provide a means of egress to a safe area.

Table 6 to § 3176.8(b)(1)

Violation Corrective action Normal abatement period
MinorDesignate or establish an alternate escape route24 hours.

(2) The alternate escape route shall be kept passable at all times.

Table 7 to § 3176.8(b)(2)

Violation Corrective action Normal abatement period
MinorMake alternate escape route passable24 hours.

(3) For workovers, a secondary means of egress shall be designated.

Table 8 to § 3176.8(b)(3)

Violation Corrective action Normal abatement period
MinorDesignate secondary means of egress24 hours.

(c) Personnel protection—(1) Training program. The operator shall ensure that all personnel who will be working at the wellsite will be properly trained in H2S drilling and contingency procedures in accordance with the general training requirements outlined in API RP-49, Section 2 (incorporated by reference, see § 3176.11). (The use of later editions of API RP-49 is deemed to comply with the requirements of this paragraph (c)(1).) The operator also shall ensure that the training will be accomplished prior to a well coming under the terms of this subpart (i.e., 3 days or 500 feet of known or probable H2S zone). In addition to the requirements of API RP-49, a minimum of an initial training session and weekly H2S and well control drills for all personnel in each working crew shall be conducted. The initial training session for each well shall include a review of the site-specific Drilling Operations Plan and, if applicable, the Public Protection Plan.

Table 9 to § 3176.8(c)(1)

Violation Corrective action Normal abatement period
MajorTrain all personnel and conduct drillsPrompt correction required.

(i) All training sessions and drills shall be recorded on the driller's log or its equivalent.

Table 10 to § 3176.8(c)(1)(i)

Violation Corrective action Normal abatement period
MinorRecord on driller's log or equivalent24 hours.

(ii) For drilling/completion/workover wells, at least 2 briefing areas shall be designated for assembly of personnel during emergency conditions, located a minimum of 150 feet from the well bore, and 1 of the briefing areas shall be upwind of the well at all times. The briefing area located most normally upwind shall be designated as the “primary briefing area.”

Table 11 to § 3176.8(c)(1)(ii)

Violation Corrective action Normal abatement period
MajorDesignate briefing areas24 hours.

(iii) One person (by job title) shall be designated and identified to all on-site personnel as the person primarily responsible for the overall operation of the on-site safety and training programs.

Table 12 to § 3176.8(c)(1)(iii)

Violation Corrective action Normal abatement period
MinorDesignate safety responsibilities24 hours.

(2) Protective equipment. (i) The operator shall ensure that proper respiratory protection equipment program is implemented, in accordance with ANSI Z88.2-1992 (incorporated by reference, see § 3176.11). (The use of ANSI Z88.2-1980 is deemed to comply with the requirements of this paragraph (d)(2)(i).) Proper protective breathing apparatus shall be readily accessible to all essential personnel on a drilling/completion/workover site. Escape and pressure-demand type working equipment shall be provided for essential personnel in the H2S environment to maintain or regain control of the well. For pressure-demand type working equipment those essential personnel shall be able to obtain a continuous seal to the face with the equipment. The operator shall ensure that service companies have the proper respiratory protection equipment when called to the location. Lightweight, escape-type, self-contained breathing apparatus with a minimum of 5-minute rated supply shall be readily accessible at a location for the derrickman and at any other location(s) where escape from an H2S contaminated atmosphere would be difficult.

Table 13 to § 3176.8(c)(2)(i)

Violation Corrective action Normal abatement period
MajorAcquire, repair, or replace equipment, as necessaryPrompt correction required.

(ii) Storage and maintenance of protective breathing apparatus shall be planned to ensure that at least 1 working apparatus per person is readily available for all essential personnel.

Table 14 to § 3176.8(c)(2)(ii)

Violation Corrective action Normal abatement period
MajorAcquire or rearrange equipment, as necessaryPrompt correction required.

(iii) The following additional safety equipment shall be available for use:

(A) Effective means of communication when using protective breathing apparatus;

(B) Flare gun and flares to ignite the well; and

(C) Telephone, radio, mobile phone, or any other device that provides communication from a safe area at the rig location, where practical.

Table 15 to § 3176.8(c)(2)(iii)

Violation Corrective action Normal abatement period
MajorAcquire, repair, or replace equipment24 hours.

(3) H2S detection and monitoring equipment. (i) Each drilling/completion site shall have an H2S detection and monitoring system that automatically activates visible and audible alarms when the ambient air concentration of H2S reaches the threshold limits of 10 and 15 ppm in air, respectively. The sensors shall have a rapid response time and be capable of sensing a minimum of 10 ppm of H2S in ambient air, with at least 3 sensing points located at the shale shaker, rig floor, and bell nipple for a drilling site and the cellar, rig floor, and circulating tanks or shale shaker for a completion site. The detection system shall be installed, calibrated, tested, and maintained in accordance with the manufacturer's recommendations.

Table 16 to § 3176.8(c)(3)(i)

Violation Corrective action Normal abatement period
MajorInstall, repair, calibrate, or replace equipment, as necessaryPrompt correction required.

(ii) All tests of the H2S monitoring system shall be recorded on the driller's log or its equivalent.

Table 17 to § 3176.8(c)(3)(ii)

Violation Corrective action Normal abatement period
MinorRecord on driller's log or equivalent24 hours.

(iii) For workover operations, 1 operational sensing point shall be located as close to the wellbore as practical. Additional sensing points may be necessary for large and/or long-term operations.

Table 18 to § 3176.8(c)(3)(iii)

Violation Corrective action Normal abatement period
MajorInstall, repair, calibrate, or replace equipment, as necessaryPrompt correction required.

(4) Visible warning system. (i) Equipment to indicate wind direction at all times shall be installed at prominent locations and shall be visible at all times during drilling operations. At least 2 such wind direction indicators (i.e., windsocks, windvanes, pennants with tailstreamers, etc.) shall be located at separate elevations (i.e., near ground level, rig floor, and/or treetop height). At least 1 wind direction indicator shall be clearly visible from all principal working areas at all times so that wind direction can be easily determined. For completion/workover operations, 1 wind direction indicator shall suffice, provided it is visible from all principal working areas on the location. In addition, a wind direction indicator at each of the 2 briefing areas shall be provided if the wind direction indicator(s) previously required in this paragraph (c)(4)(i) are not visible from the briefing areas.

Table 19 to § 3176.8(c)(4)(i)

Violation Corrective action Normal abatement period
MinorInstall, repair, move, or replace wind direction indicator(s), as necessary24 hours.

(ii) At any time when the terms of this subpart are in effect, operational danger or caution sign(s) shall be displayed along all controlled accesses to the site.

Table 20 to § 3176.8(c)(4)(ii)

Violation Corrective action Normal abatement period
MinorErect appropriate signs24 hours.

(iii) Each sign shall be painted a high visibility red, black and white, or yellow with black lettering.

Table 21 to § 3176.8(c)(4)(iii)

Violation Corrective action Normal abatement period
MinorReplace or alter sign, as necessary5 to 20 days.

(iv) The sign(s) shall be legible and large enough to be read by all persons entering the well site and be placed a minimum of 200 feet but no more than 500 feet from the well site and at a location which allows vehicles to turn around at a safe distance prior to reaching the site.

Table 22 to § 3176.8(c)(4)(iv)

Violation Corrective action Normal abatement period
MajorReplace, alter, or move sign, as necessary24 hours.

(v) The sign(s) shall read: “DANGER—POISON GAS—HYDROGEN SULFIDE,” and in smaller lettering: “Do Not Approach If Red Flag is Flying” or equivalent language if approved by the authorized officer. Where appropriate, bilingual or multilingual danger sign(s) shall be used.

Table 23 to § 3176.8(c)(4)(v)

Violation Corrective action Normal abatement period
MinorAlter sign(s), as necessary5 to 20 days.

(vi) All sign(s) and, when appropriate, flag(s) shall be visible to all personnel approaching the location under normal lighting and weather conditions.

Table 24 to § 3176.8(c)(4)(vi)

Violation Corrective action Normal abatement period
MajorErect or move sign(s) and/or flag(s), as necessary24 hours.

(vii) When H2S is detected in excess of 10 ppm at any detection point, red flag(s) shall be displayed.

Table 25 to § 3176.8(c)(4)(vii)

Violation Corrective action Normal abatement period
MajorDisplay red flagPrompt correction required.

(5) Warning system response. When H2S is detected in excess of 10 ppm at any detection point, all non-essential personnel shall be moved to a safe area and essential personnel (i.e., those necessary to maintain control of the well) shall wear pressure-demand type protective breathing apparatus. Once accomplished, operations may proceed.

Table 26 to § 3176.8(c)(5)

Violation Corrective action Normal abatement period
MajorMove non-essential personnel to safe area and mask-up essential personnelPrompt correction required.

(d) Operating procedures and equipment—(1) General/operations. Drilling/completion/workover operations in H2S areas shall be subject to the following requirements:

(i) If zones containing in excess of 100 ppm of H2S gas are encountered while drilling with air, gas, mist, other nonmud circulating mediums or aerated mud, the well shall be killed with a water- or oil-based mud and mud shall be used thereafter as the circulating medium for continued drilling.

Table 27 to § 3176.8(d)(1)(i)

Violation Corrective action Normal abatement period
MajorConvert to appropriate fluid mediumPrompt correction required.

(ii) A flare system shall be designed and installed to safely gather and burn H2S-bearing gas.

Table 28 to § 3176.8(d)(1)(ii)

Violation Corrective action Normal abatement period
MajorInstall flare systemPrompt correction required.

(iii) Flare lines shall be located as far from the operating site as feasible and in a manner to compensate for wind changes. The flare line(s) mouth(s) shall be located not less than 150 feet from the wellbore unless otherwise approved by the authorized officer. Flare lines shall be straight unless targeted with running tees.

Table 29 to § 3176.8(d)(1)(iii)

Violation Corrective action Normal abatement period
MinorAdjust flare line(s) as necessary24 hours.

(iv) The flare system shall be equipped with a suitable and safe means of ignition.

Table 30 to § 3176.8(d)(1)(iv)

Violation Corrective action Normal abatement period
MajorInstall, repair, or replace equipment, as necessary24 hours.

(v) Where noncombustible gas is to be flared, the system shall be provided supplemental fuel to maintain ignition.

Table 31 to § 3176.8(d)(1)(v)

Violation Corrective action Normal abatement period
MajorAcquire supplemental fuel24 hours.

(vi) At any wellsite where SO2, may be released as a result of flaring of H2S during drilling, completion, or workover operations, the operator shall make SO2, portable detection equipment available for checking the SO2 level in the flare impact area.

Table 32 to § 3176.8(d)(1)(vi)

Violation Corrective action Normal abatement period
MinorAcquire, repair, or replace equipment as necessary24 hours to 3 days.

(vii) If the flare impact area reaches a sustained ambient threshold level of 2 ppm or greater of SO2 in air and includes any occupied residence, school, church, park, or place of business, or other area where the public could reasonably be expected to frequent, the Public Protection Plan shall be implemented.

Table 33 to § 3176.8(d)(1)(vii)

Violation Corrective action Normal abatement period
MajorContain SO2 release and/or implement Public Protection PlanPrompt correction required.

(viii) A remote controlled choke shall be installed for all H2S drilling and, where feasible, for completion operations. A remote-controlled valve may be used in lieu of this requirement for completion operations.

Table 34 to § 3176.8(d)(1)(viii)

Violation Corrective action Normal abatement period
MajorInstall, repair, or replace equipment, as necessaryPrompt correction required.

(ix) Mud-gas separators and rotating heads shall be installed and operable for all exploratory wells.

Table 35 to § 3176.8(d)(1)(ix)

Violation Corrective action Normal abatement period
MajorInstall, repair, or replace equipment, as necessaryPrompt correction required.

(2) Mud program. (i) A pH of 10 or above in a fresh water-base mud system shall be maintained to control corrosion, H2S gas returns to surface, and minimize sulfide stress cracking and embrittlement unless other formation conditions or mud types justify to the authorized officer a lesser pH level is necessary.

Table 36 to § 3176.8(d)(2)(i)

Violation Corrective action Normal abatement period
MajorAdjust pHPrompt correction required.

(ii) Drilling mud containing H2S gas shall be degassed in accordance with API RP-49, sec. 5.14 (incorporated by reference, see § 3176.11), at an optimum location for the rig configuration. These gases shall be piped into the flare system. (The use of later editions of API RP-49 is deemed to comply with the requirements of this paragraph (d)(2)(ii).)

Table 37 to § 3176.8(d)(2)(ii)

Violation Corrective action Normal abatement period
MajorInstall, repair, or replace equipment, as necessary24 hours.

(iii) Sufficient quantities of mud additives shall be maintained on location to scavenge and/or neutralize H2S where formation pressures are unknown.

Table 38 to § 3176.8(d)(2)(iii)

Violation Corrective action Normal abatement period
MajorObtain proper mud additives24 hours.

(3) Metallurgical equipment. (i) All equipment that has the potential to be exposed to H2S shall be suitable for H2S service. Equipment which shall meet these metallurgical standards include the drill string, casing, wellhead, blowout preventer assembly, casing head and spool, rotating head, kill lines, choke, choke manifold and lines, valves, mud-gas separators, drill-stem test tools, test units, tubing, flanges, and other related equipment.

(ii) To minimize stress corrosion cracking and/or H2S embrittlement, the equipment shall be constructed of material whose metallurgical properties are chosen with consideration for both an H2S working environment and the anticipated stress. The metallurgical properties of the materials used shall conform to NACE MR 0175-2021 (incorporated by reference, see § 3176.11). (The use of NACE MR 0175-90 through NACE MR 0175-2021 is deemed to comply with the requirements of this paragraph (d)(3)(ii).) These metallurgical properties include the grade of steel, the processing method (rolled, normalized, tempered, and/or quenched), and the resulting strength properties. The working environment considerations include the H2S concentration, the well fluid pH, and the wellbore pressures and temperatures. Elastomers, packing, and similar inner parts exposed to H2S shall be resistant at the maximum anticipated temperature of exposure. The manufacturer's verification of design for use in an H2S environment shall be sufficient verification of suitable service in accordance with this subpart.

Table 39 to § 3176.8(d)(3)(ii)

Violation Corrective action Normal abatement period
MajorInstall, repair, or replace appropriate equipment, as necessaryPrompt correction required.

(4) Well testing in an H2S environment. Testing shall be performed with a minimum number of personnel in the immediate vicinity which are necessary to safely and adequately operate the test equipment. Except with prior approval by the authorized officer, the drill-stem testing of H2S zones shall be conducted only during daylight hours and formation fluids shall not be flowed to the surface (closed chamber only).

Table 40 to § 3176.8(d)(4)

Violation Corrective action Normal abatement period
MajorTerminate the well testPrompt correction required.
§ 3176.9 - Production requirements.

(a) General. (1) All existing production facilities which do not currently meet the requirements and minimum standards set forth in this section shall be brought into conformance within 1 year after January 22, 1991. All existing equipment that is in a safe working condition as of January 22, 1991, is specifically exempt from the metallurgical requirements prescribed in paragraph (c)(7) of this section.

Table 1 to § 3176.9(a)(1)

Violation Corrective action Normal abatement period
MinorBring facility into compliance60 days.

(2) Production facilities constructed after January 22, 1991, shall be designed, constructed, and operated to meet the requirements and minimum standards set forth in this section. Any variations from the standards or established time frames shall be approved by the authorized officer in accordance with the provisions of § 3176.10. Except for storage tanks, a determination of the radius of exposure for all production facilities shall be made in the manner prescribed in § 3176.4.

Table 2 to § 3176.9(a)(2)

Violation Corrective action Normal abatement period
MinorBring facility into compliance60 days.

(3) At any production facility or storage tank(s) where the sustained ambient H2S concentration is in excess of 10 ppm at 50 feet from the production facility or storage tank(s) as measured at ground level under calm (1 mph) conditions, the operator shall collect or reduce vapors from the system and they shall be sold, beneficially used, reinjected, or flared provided terrain and conditions permit.

Table 3 to § 3176.9(a)(3)

Violation Corrective action Normal abatement period
Major, if the authorized officer determines that a health or safety problem to the public is imminent, otherwise minorBring facility into compliance3 days for major, 30 days for minor.

(b) Storage tanks. Storage tanks containing produced fluids and utilized as part of a production operation and operated at or near atmospheric pressure, where the vapor accumulation has an H2S concentration in excess of 500 ppm in the tank, shall be subject to the following:

(1) No determination of a radius of exposure need be made for storage tanks.

(2) All stairs/ladders leading to the top of storage tanks shall be chained and/or marked to restrict entry. For any storage, tank(s) which require fencing (see paragraph (b)(6) of this section), a danger sign posted at the gate(s) shall suffice in lieu of this requirement.

Table 4 to § 3176.9(b)(2)

Violation Corrective action Normal abatement period
MinorChain or mark stair(s)/ladder(s) or post sign, as necessary5 to 20 days.

(3) A danger sign shall be posted on or within 50 feet of the storage tank(s) to alert the public of the potential H2S danger. For any storage tank(s) which require fencing (see paragraph (b)(6) of this section), a danger sign posted at the locked gate(s) shall suffice in lieu of this requirement.

Table 5 to § 3176.9(b)(3)

Violation Corrective action Normal abatement period
MinorPost or move sign(s), as necessary5 to 20 days.

(4) The sign(s) shall be painted in high-visibility red, black, and white. The sign(s) shall read: “DANGER—POISON GAS—HYDROGEN SULFIDE” or equivalent language if approved by the authorized officer. Where appropriate, bilingual or multilingual warning signs shall be used.

Table 6 to § 3176.9(b)(4)

Violation Corrective action Normal abatement period
MinorPost, move, replace, or alter sign(s), as necessary20 to 40 days.

(5) At least 1 permanent wind direction indicator shall be installed so that wind direction can be easily determined at or approaching the storage tank(s).

Table 7 to § 3176.9(b)(5)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace wind direction indicator, as necessary20 to 40 days.

(6) A minimum 5-foot chain-link, 5-strand barbed wire, or comparable type fence and gate(s) that restrict(s) public access shall be required when storage tanks are located within 1/4 mile of or contained inside a city or incorporated limits of a town or within 1/4 mile of an occupied residence, school, church, park, playground, school bus stop, place of business, or where the public could reasonably be expected to frequent.

Table 8 to § 3176.9(b)(6)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace fence and/or gate(s), as necessary20 to 40 days.

(7) Gate(s), as required by paragraph (b)(6) of this section, shall be locked when unattended by the operator.

Table 9 to § 3176.9(b)(7)

Violation Corrective action Normal abatement period
MinorLock gate24 hours.

(c) Production facilities. Production facilities containing 100 ppm or more of H2S in the gas stream shall be subject to the following:

(1) Danger signs as specified in paragraph (b)(4) of this section shall be posted on or within 50 feet of each production facility to alert the public of the potential H2S danger. In the event the storage tanks and production facilities are located at the same site, 1 such danger sign shall suffice. Further, for any facilities which require fencing (paragraph (b)(6) of this section), 1 such danger sign at the gate(s) shall suffice in lieu of this requirement.

Table 10 to § 3176.9(c)(1)

Violation Corrective action Normal abatement period
MinorPost, move, or alter sign(s), as necessary5 to 20 days.

(2) Danger signs, as specified in paragraph (b)(4) of this section, shall be required for well flowlines and lease gathering lines that carry H2S gas. Placement shall be where said lines cross public or lease roads. The signs shall be legible and shall contain sufficient additional information to permit a determination of the owner of the line.

Table 11 to § 3176.9(c)(2)

Violation Corrective action Normal abatement period
MinorPost, move, or alter sign(s), as necessary5 to 20 days.

(3) Fencing and gate(s), as specified in paragraph (b)(6) of this section, shall be required when production facilities are located within 1/4 mile of or contained inside a city or incorporated limits of a town or within 1/4 mile of an occupied residence, school, church, park, playground, school bus stop, place of business, or any other area where the public could reasonably be expected to frequent. Flowlines are exempted from this additional fencing requirement.

Table 12 to § 3176.9(c)(3)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace fence, and/or gate(s), as necessary20 to 40 days.

(4) Gate(s), as required by paragraph (c)(3) of this section, shall be locked when unattended by the operator.

Table 13 to § 3176.9(c)(4)

Violation Corrective action Normal abatement period
MinorLock gate24 hours.

(5) Wind direction indicator(s) as specified in paragraph (b)(5) of this section shall be required. In the event the storage tanks and production facilities are located at the same site, 1 such indicator shall suffice. Flowlines are exempt from this requirement.

Table 14 to § 3176.9(c)(5)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace wind direction indicator(s), as necessary20 to 40 days.

(6) All wells, unless produced by artificial lift, shall possess a secondary means of immediate well control through the use of appropriate christmas tree and/or downhole completion equipment. Such equipment shall allow downhole accessibility (reentry) under pressure for permanent well control operations. If the applicability criteria stated in § 3176.7(a) are met, a minimum of 2 master valves shall be installed.

Table 15 to § 3176.9(c)(6)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace equipment, as necessary20 to 40 days.

(7) All equipment shall be chosen with consideration for both the H2S working environment and anticipated stresses. NACE MR 0175-2021 (incorporated by reference, see § 3176.11) shall be used for metallic equipment selection and, if applicable, adequate protection by chemical inhibition or other such method that controls or limits the corrosive effects of H2S shall be used. (The use of NACE MR 0175-90 through NACE MR 0175-2021 is deemed to comply with the requirements of this paragraph (c)(7).)

Table 16 to § 3176.9(c)(7)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace equipment, as necessary20 to 40 days.

(8) Where the 100 ppm radius of exposure for H2S includes any occupied residence, place of business, school, or other inhabited structure or any area where the public may reasonably be expected to frequent, the operator shall install automatic safety valves or shutdowns at the wellhead, or other appropriate shut-in controls for wells equipped with artificial lift.

Table 17 to § 3176.9(c)(8)

Violation Corrective action Normal abatement period
MinorInstall, repair, or replace equipment, as necessary20 to 40 days.

(9) The automatic safety valves or shutdowns, as required by paragraph (c)(8) of this section, shall be set to activate upon a release of a potentially hazardous volume of H2S.

Table 18 to § 3176.9(c)(9)

Violation Corrective action Normal abatement period
MajorRepair, replace or adjust equipment, as necessaryPrompt correction required.

(10) If the sustained ambient concentration of H2S or SO2 from a production facility which is venting or flaring reaches a concentration of H2S (10 ppm) or SO2 (2 ppm), respectively, at any of the following locations, the operator shall modify the production facility as approved by the authorized officer. The locations include any occupied residence, school, church, park, playground, school bus stop, place of business, or other areas where the public could reasonably be expected to frequent.

Table 19 to § 3176.9(c)(10)

Violation Corrective action Normal abatement period
MajorRepair facility to bring into compliance.Prompt correction required

(d) Public protection. When conditions as defined in § 3176.7(a) exist, a Public Protection Plan for producing operations shall be submitted to the authorized officer in accordance with § 3176.7(b)(1) which includes the provisions of § 3176.7(b)(2).

Table 20 to § 3176.9(d)

Violation Corrective action Normal abatement period
MinorSubmit Public Protection Plan20 to 40 days.
§ 3176.10 - Variances from requirements.

An operator may request the authorized officer to approve a variance from any of the requirements prescribed in §§ 3176.5 through 3176.9. All such requests shall be submitted in writing to the appropriate authorized officer and provide information as to the circumstances which warrant approval of the variance(s) requested and the proposed alternative methods by which the related requirement(a) of minimum standard(s) are to be satisfied. The authorized officer, after considering all relevant factors, may approve the requested variance(s) if it is determined that the proposed alterative(s) meets or exceeds the objectives of the applicable requirement(s) or minimum standard(s).

§ 3176.11 - Incorporation by reference.

Certain material is incorporated by reference into this subpart with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved incorporation by reference (IBR) material is available for inspection at all Bureau of Land Management offices with jurisdiction over oil and gas activities, and at the National Archives and Records Administration (NARA). Contact the BLM at: Office of Energy, Minerals, and Realty Management, 1849 C Street Northwest, Washington, DC 20240; telephone 202-208-3801; email [email protected]; website www.blm.gov/programs/energy-and-minerals/oil-and-gas. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations.html or email [email protected]. The material also may be obtained from the following sources:

(a) American National Standards Institute (ANSI), 25 West 43rd St., 4th floor, New York, NY 10036; telephone: 212-642-4980; email: [email protected]; website: www.ansi.org.

(1) ANSI Standard Z88.2-1992 for Respiratory Protection, Approved August 6, 1992 (“ANSI Z88.2-1992”), IBR approved for § 3176.8.

(2) [Reserved]

Note 1 to paragraph (a):

If ANSI Z88.2 is not available from document resellers, contact the BLM to obtain a copy.

(b) American Petroleum Institute (API), 200 Massachusetts Avenue NW, Suite 1100, Washington, DC 20001; telephone: 202-682-8000; email: [email protected]; website: www.api.org.

(1) API Recommended Practice 49—Recommended Practice for Drilling and Well Servicing Operations Involving Hydrogen Sulfide; Third Edition, May 2001; Reaffirmed, January 2013 (“API RP 49”), IBR approved for § 3176.8.

(2) [Reserved]

(c) Association for Materials Protection and Performance (AMPP) formerly known as NACE International, 15835 Park Ten Place, Houston, TX 77084; telephone: 1-800-797-6223; website: www.ampp.org.

(1) ANSI/NACE MR0175-2021/ISO 15156-1:2020; Petroleum and natural gas industries—Materials for use in H2S-containing environments in oil and gas production; Part 1: General principles for selection of cracking-resistant materials; Fourth Edition, Approved September 21, 2022 (“NACE MR 0175-2021”); IBR approved for §§ 3176.8; 3176.9.

(2) [Reserved]

authority: 25 U.S.C. 396d and 2107; 30 U.S.C. 189,306,359,and; and 43 U.S.C. 1732(b), 1733, and 1740
source: 81 FR 81421, Nov. 17, 2016, unless otherwise noted.
cite as: 43 CFR 3176.3