Regulations last checked for updates: Oct 17, 2024

Title 46 - Shipping last revised: Oct 15, 2024
§ 56.90-1 - General.

The assembly of the various piping components, whether done in a shop or as field erection, must be done so that the completely erected piping conforms with the requirements of the regulations in this subchapter.

§ 56.90-5 - Bolting procedure.

(a) All flanged joints must be fitted up so that the gasket contact faces bear uniformly on the gasket and then must be made up with relatively uniform bolt stress.

(b) When bolting gasketed flanged joints, the gasket must be properly compressed in accordance with the design principles applicable to the type of gasket used.

(c) Steel to cast iron flanged joints shall be assembled with care to prevent damage to the cast iron flange in accordance with § 56.25-10.

(d) All bolts must be engaged so that there is visible evidence of complete threading through the nut or threaded attachment.

[CGFR 68-82, 33 FR 18843, Dec. 18, 1968, as amended by USCG-2003-16630, 73 FR 65185, Oct. 31, 2008]
§ 56.90-10 - Threaded piping (modifies 135.5).

(a) Any compound used in threaded joints must be suitable for the service conditions and must not react unfavorably with either the service fluid or the piping materials.

(b) Threaded joints that are to be seal welded must be made up without any thread compound.

[CGFR 68-82, 33 FR 18843, Dec. 18, 1968, as amended by USCG-2003-16630, 73 FR 65185, Oct. 31, 2008]
authority: 33 U.S.C. 1321(j), 1509; 43 U.S.C. 1333; 46 U.S.C. 3306,3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.3
source: CGFR 68-82, 33 FR 18843, Dec. 18, 1968, unless otherwise noted.
cite as: 46 CFR 56.90-10