§ 57.02-1 - Incorporation by reference.

Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a document in the Federal Register and the material must be available to the public. All approved incorporation by reference (IBR) material is available for inspection at the U.S. Coast Guard and the National Archives and Records Administration (NARA). Contact U.S. Coast Guard Headquarters at: Commandant (CG-ENG), Attn: Office of Design and Engineering Standards, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE, Washington, DC 20593-7509; phone (202) 372-1375; email [email protected]. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email [email protected]. The material may be obtained from American Society of Mechanical Engineers (ASME), Two Park Avenue, New York, NY 10016-5990; 800-843-2763; [email protected]; www.asme.org:

(a) ASME Boiler and Pressure Vessel Code, Section IX, Qualification Standard for Welding, Brazing, and Fusing Procedures; Welders; Brazers; and Welding, Brazing, and Fusing Operators, 2019 Edition, issued July 1, 2019 (“Section IX of the ASME BPVC”); IBR approved for §§ 57.02-2; 57.02-4(a); 57.03-1(a) and (b); 57.04-1; 57.05-1(a); 57.06-1(c); 57.06-4(h).

(b) [Reserved]

[CGD 88-032, 56 FR 35823, July 29, 1991, as amended by CGD 95-072, 60 FR 50462, Sept. 29, 1995; 60 FR 54106, Oct. 19, 1995; CGD 96-041, 61 FR 50728, Sept. 27, 1996; USCG-1999-6216, 64 FR 53224, Oct. 1, 1999; USCG-2009-0702, 74 FR 49229, Sept. 25, 2009; USCG-2012-0832, 77 FR 59778, Oct. 1, 2012; USCG-2013-0671, 78 FR 60148, Sept. 30, 2013]
§ 57.02-2 - Adoption of Section IX of the ASME BPVC.

(a) The qualifications for all types of welders and brazers, the qualification of welding procedures, and the production tests for all types of manual and machine arc and gas welding and brazing processes used in fabricating power boilers, heating boilers, pressure vessels and piping must be in accordance with Section IX of the ASME BPVC (incorporated by reference; see § 57.02-1), as limited, modified, or replaced by specific requirements in this part. For general information, table 1 to § 57.02-2(a) lists the various paragraphs in Section IX of the ASME BPVC which are limited, modified, or replaced by regulations in this part.

Table 1 to § 57.02-2(a)—Limitations and Modifications to the Adoption of Section IX of the ASME BPVC

Paragraphs in section IX of the ASME BPVC, and disposition Unit of this part
QW-100 replaced by57.01-1(a).
QW-201 modified by57.03-1(a).
QW-202 modified by57.04-1
QW-202.1 modified by57.03-1(b).
QW-210 modified by57.04-1.
QW-211 modified by57.02-4.
QW-253 modified by57.03-1(g).
QW-254 modified by57.03-1(g).
QW-255 modified by57.03-1(g).
QW-305 modified by57.01-1(b).
QW-451 modified by57.03-1(b) and 57.04-1.
QB-100 replaced by57.01-1(a).
QB-103 replaced by57.02-3(a).
QB-201 modified by57.03-1(a).
QB-202 modified by57.04-1.
QB-305 modified by57.01-1(b).

(b) References to the ASME Code, like paragraph QW-131.1 indicate:

(1) Q = Section IX, Welding and Brazing Qualifications, ASME BPVC.

(2) W = Part containing requirements for welding procedure, welder, and welding operator qualifications.

(3) 131 = Major division within the part.

(4) 131.1 = Specific subparagraph within the part.

(c) When a paragraph or a section of the regulations in this part relates to material in Section IX of the ASME BPVC, the relationship with the code will be shown immediately following the heading of the section or at the beginning of the paragraph as follows:

(1) (Modifies Q__.) This indicates that the material in Q__ is generally applicable but is being altered, amplified, or augmented.

(2) (Replaces Q__.) This indicates that Q__ does not apply.

(3) (Reproduces Q__.) This indicates that Q__ is being identically reproduced for convenience, not for emphasis.

[CGFR 68-82, 33 FR 18872, Dec. 18, 1968, as amended by CGFR 69-127, 35 FR 9980, June 17, 1970; CGD 74-102, 40 FR 27460, June 30, 1975. Redesignated by CGD 88-032, 56 FR 35823, July 29, 1991; CGD 95-012, 60 FR 48050, Sept. 18, 1995]
§ 57.02-3 - Performance qualifications issued by other agencies.

(a) Within the limits of the qualification tests passed, the Officer in Charge, Marine Inspection, may accept welders who have been qualified by other agencies of the Federal Government; by the American Bureau of Shipping; or by the fabricator concerned.

(b) [Reserved]

[CGFR 68-82, 33 FR 18872, Dec. 18, 1968. Redesignated by CGD 88-032, 56 FR 35832, July 29, 1991]
§ 57.02-4 - Fabricator's responsibility.

(a) (Replaces QW 103 and QB 103.) Each manufacturer or contractor is responsible for the welding and brazing done by their organization and must conduct tests required in this part to qualify the welding and brazing procedures used and the performance of welders and brazers who apply these procedures. The manufacturer must bear the expense of conducting the tests. Each manufacturer must maintain a record of the test results obtained in welding and brazing procedure and welder and brazer performance qualifications. These required records, together with identification data, must be maintained by the manufacturer or contractor on the recommended forms illustrated in Section IX of the ASME BPVC (incorporated by reference; see § 57.02-1), or on any other form acceptable to the Officer in Charge, Marine Inspection. Upon request, duplicate forms must be furnished by the manufacturer or contractor to the marine inspector.

(b) Except as otherwise provided for in § 57.02-2, the fabricator must notify the Officer in Charge, Marine Inspection, prior to conducting performance or procedure qualification tests, and arrange a suitable time and place for conducting the tests, so that a marine inspector may be present.

[CGFR 68-82, 33 FR 18872, Dec. 18, 1968, as amended by CGD 74-102, 40 FR 27460, June 30, 1975. Redesignated by CGD 88-032, 56 FR 35823, July 29, 1991]
§ 57.02-5 - Filler metals.

(a) Except as provided for in paragraph (b) of this section, when filler metal is used in a welded fabrication that is required to meet the requirements of this part the filler metal must be one that has been approved by the American Bureau of Shipping.

(b) In instances where a fabricator desires to use a filler metal which has not been approved by the American Bureau of Shipping the approval of the filler metal can be made by the Officer in Charge, Marine Inspection on the basis of the fabricator passing the weld procedure qualification tests as outlined in this part. This alternate means of approval applies to wire-gas and wire-flux combinations as well as to stick electrodes. Filler metal approvals given in this manner will extend only to the specific fabricator to whom they are granted.

[CGD 74-102, 40 FR 27460, June 30, 1975. Redesignated by CGD 88-032, 56 FR 35823, July 29, 1991]
authority: 46 U.S.C. 3306,3703,E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46
source: CGFR 68-82, 33 FR 18872, Dec. 18, 1968, as amended by USCG-2020-0634, 89 FR 50162, June 12, 2024, unless otherwise noted.
cite as: 46 CFR 57.02-1