Regulations last checked for updates: Nov 22, 2024

Title 48 - Federal Acquisition Regulations System last revised: Nov 15, 2024
225.202 - 225.202 Exceptions.

(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level. A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).

[89 FR 11954, Feb. 15, 2024]
225.206 - 225.206 Noncompliance.

(c)(4) Prepare any report of noncompliance in accordance with the procedures at 209.406-3 or 209.407-3.

[64 FR 62986, Nov. 18, 1999]
§ 225.270 - Energy savings service contracts.

If construction and construction materials will be used during the performance of a contract for DoD energy savings service requirements, see PGI 225.270 for additional guidance.

[89 FR 90238, Nov. 15, 2024]
authority: 41 U.S.C. 1303 and 48 CFR chapter 1
source: 56 FR 36367, July 31, 1991, unless otherwise noted.
cite as: 48 CFR 225.270