536.101 - 536.101 Applicability.

This part supplements FAR Part 36 policies and procedures applicable to contracting for construction and architect-engineer services. Contracts for construction management services are covered by FAR Part 37 and GSAM Part 537. Part 536 shall take precedence when the acquisition involves (1) construction or architect-engineer services, and (2) when the requirement is inconsistent with another part of the GSAR.

[81 FR 4594, Jan. 27, 2016]
536.102 - 536.102 Definitions.

Construction-Manager-as-Constructor (CMc) means the project delivery method where design and construction are contracted concurrently through two separate contracts and two separate contractors. Unlike the traditional design-bid-build delivery method, under the CMc delivery method, the Government awards a separate contract to a designer (i.e., architect-engineer contractor) and to a construction contractor (i.e., CMc contractor) prior to the completion of the design documents. The Government retains the CMc contractor during design to work with the architect-engineer contractor to provide constructability reviews and cost estimating validation. The CMc contract includes design phase services at a firm-fixed-price and an option for construction at a guaranteed maximum price.

[84 FR 69632, Dec. 19, 2019]
authority: 40 U.S.C. 121(c)
source: 64 FR 37224, July 9, 1999, unless otherwise noted.
cite as: 48 CFR 536.101