§18.142 - §18.142 Specified activities covered by this subpart.

Regulations in this subpart apply to the nonlethal incidental, but not intentional, take, as defined in § 18.3 and under section 3 of the Marine Mammal Protection Act (16 U.S.C. 1371 et seq.), of small numbers of northern sea otters (Enhydra lutris kenyoni; hereafter “sea otters”) by the U.S. Coast Guard (hereafter “USCG” or “the applicant”) while engaged in activities associated with or in support of marine construction activities in the Gulf of Alaska. The applicant is a U.S. citizen as defined in § 18.27(c).

§ 18.143 - Specified geographic region where this subpart applies.

(a) The specified geographic region encompasses areas within 2 kilometers (km) (∼1.25 miles (mi)) of eight USCG facilities within the USCG Civil Engineering Unit, Juneau Area of Responsibility. These facilities are: Base Kodiak, Moorings Seward, Moorings Valdez, Moorings Cordova, Moorings Sitka, Station Juneau, Moorings Petersburg, and Base Ketchikan.

(b) The geographic area of the incidental take regulations (ITRs) in this subpart includes all Alaska State waters within the areas listed in paragraph (a) of this section as well as all adjacent rivers, estuaries, and coastal lands where sea otters may occur.

§ 18.144 - Dates this subpart is in effect.

Regulations in this subpart are effective from May 19, 2023, until May 19, 2028.

§ 18.145 - Procedure to obtain a Letter of Authorization (LOA).

(a) The applicant must submit the request for authorization to the U.S. Fish and Wildlife Service (Service) Alaska Region Marine Mammals Management Office (MMM), MS 341, 1011 East Tudor Road, Anchorage, Alaska, 99503, or by email at [email protected], at least 30 days prior to the start of the planned activity.

(b) The request for an LOA must comply with the requirements set forth in §§ 18.149 through 18.151 and must include the following information:

(1) An operational plan for the activity;

(2) A digital geospatial file of the project footprint, including sound isopleths;

(3) A site-specific marine mammal monitoring and mitigation plan that specifies the procedures to monitor and mitigate the effects of the activities on sea otters; and

(4) When appropriate, a plan of cooperation, which is a documented plan that describes measures to mitigate potential conflicts between planned project activities and subsistence hunting.

§ 18.146 - How the Service will evaluate a request for an LOA.

(a) The Service will evaluate each request for an LOA to determine if the proposed activity is consistent with the analysis and findings made for the regulations in this subpart. Depending on the results of the evaluation, we may issue the LOA, add further conditions, or deny the LOA.

(b) Once issued, the Service may withdraw or suspend an LOA if the project activity is modified in a way that undermines the results of the previous evaluation, if the conditions of the regulations in this subpart are not being substantially complied with, or if the taking allowed is or may be having more than a negligible impact on the affected stock of sea otters or an unmitigable adverse impact on the availability of sea otters for subsistence uses.

(c) The Service will make decisions concerning withdrawals of an LOA, either on an individual or class basis, only after notice and opportunity for public comment in accordance with § 18.27(f)(5). The requirement for notice and public comment will not apply should we determine that an emergency exists that poses a significant risk to the well-being of the species or stocks of sea otters.

§ 18.147 - Authorized take allowed under an LOA.

(a) To incidentally take sea otters pursuant to the regulations in this subpart, the USCG must apply for and obtain an LOA in accordance with §§ 18.27(f) and 18.145. The applicant is a U.S. citizen as defined in § 18.27(c).

(b) An LOA allows for the nonlethal, incidental, but not intentional take by harassment of sea otters during activities specified in § 18.142 within the Gulf of Alaska ITR region described in § 18.143.

(c) Each LOA will set forth:

(1) Permissible methods of incidental take;

(2) Means of effecting the least practicable adverse impact (i.e., mitigation) on the species, its habitat, and the availability of the species for subsistence uses; and

(3) Requirements for monitoring and reporting.

(d) Issuance of the LOA(s) must be based on a determination that the level of take will be consistent with the findings made for the total allowable take under the regulations in this subpart.

§ 18.148 - Prohibited take under an LOA.

(a) Except as otherwise provided in this subpart, prohibited taking is described in § 18.11 as well as: intentional take, lethal incidental take of sea otters, and any take that fails to comply with this subpart or with the terms and conditions of an LOA.

(b) If project activities cause unauthorized take, the applicant must take the following actions:

(1) Cease activities immediately (or reduce activities to the minimum level necessary to maintain safety) and report the details of the incident to the Service MMM at 1-800-362-5148 (business hours) within 48 hours; and

(2) Suspend further activities until the Service has reviewed the circumstances, determined whether additional mitigation measures are necessary to avoid further unauthorized taking, and notified the applicant that project activities may resume.

§ 18.149 - Mitigation.

(a) Mitigation measures for all LOAs. The applicant, including all personnel operating under the applicant's authority (or “operators,” including contractors, subcontractors, and representatives) must undertake the following activities to avoid and minimize take of sea otters by harassment.

(1) Implement policies and procedures to avoid interactions with and minimize to the greatest extent practicable adverse impacts on sea otters, their habitat, and the availability of these marine mammals for subsistence uses.

(2) Develop avoidance and minimization policies and procedures, in cooperation with the Service, that include temporal or spatial activity restrictions to be used in response to the presence of sea otters engaged in a biologically significant activity (e.g., resting, feeding, hauling out, mating, or nursing).

(3) Cooperate with the Service's MMM Office and other designated Federal, State, and local agencies to monitor and mitigate the impacts of pile driving and marine construction activities on sea otters.

(4) Allow Service personnel or the Service's designated representative to board project vessels or visit project worksites for the purpose of monitoring impacts to sea otters and subsistence uses of sea otters at any time throughout project activities so long as it is safe to do so.

(5) Designate trained and qualified protected species observers (PSOs) to monitor for the presence of sea otters, initiate mitigation measures, and monitor, record, and report the effects of the activities on sea otters. The applicant is responsible for providing training to PSOs to carry out mitigation and monitoring.

(6) Have an approved mitigation and monitoring plan on file with the Service MMM and onsite that includes the following information:

(i) The type of activity and where and when the activity will occur (i.e., a summary of the plan of operation);

(ii) Personnel training policies, procedures, and materials;

(iii) Site-specific sea otter interaction risk evaluation and mitigation measures;

(iv) Sea otter avoidance and encounter procedures; and

(v) Sea otter observation and reporting procedures.

(b) Mitigation measures for in-water noise-generating work. The applicant must carry out the following measures:

(1) Construction activities must be conducted using equipment that generates the lowest practicable levels of underwater sound within the range of frequencies audible to sea otters.

(2) During all pile-installation activities, regardless of predicted sound levels, a physical interaction shutdown zone of 20 meters (m) (66 feet (ft)) must be enforced. If a sea otter enters the shutdown zone, in-water activities must be delayed until either the animal has been visually observed outside the shutdown zone or 15 minutes have elapsed since the last observation time without redetection of the animal.

(3) If the impact driver has been idled for more than 30 minutes, an initial set of three strikes from the impact driver must be delivered at reduced energy, followed by a 1-minute waiting period, before full-powered proofing strikes.

(4) In-water activity must be conducted in daylight. If environmental conditions prevent visual detection of sea otters within the shutdown zone, in-water activities must be stopped until visibility is regained.

(5) All in-water work along the shoreline must be conducted during low tide when the site is dewatered to the maximum extent practicable.

(6) When an impact hammer is used, noise-dampening block cushions or pile caps will be placed between the hammer and pile.

(c) Mitigation measures for vessel operations. Vessel operators must take every precaution to avoid harassment of sea otters when a vessel is operating near these animals. The applicant must carry out the following measures:

(1) Vessels must remain at least 500 m (1,640 ft) from rafts of sea otters unless safety is a factor. Vessels must reduce speed and maintain a distance of 100 m (328 ft) from all sea otters unless safety is a factor.

(2) Vessels must not be operated in such a way as to separate members of a group of sea otters from other members of the group and must avoid alongshore travel in shallow water (<20 m (∼66 ft)) whenever practicable.

(3) When weather conditions require, such as when visibility drops, vessels must adjust speed accordingly to avoid the likelihood of injury to sea otters.

(4) Vessel operators must be provided written guidance for avoiding collisions and minimizing disturbances to sea otters. Guidance will include measures identified in paragraph (c) of this section.

§ 18.150 - Monitoring.

(a) Operators must work with PSOs to apply mitigation measures and must recognize the authority of PSOs, up to and including stopping work, except where doing so poses a significant safety risk to personnel.

(b) Duties of PSOs include watching for and identifying sea otters, recording observation details, documenting presence in any applicable monitoring zone, identifying and documenting potential harassment, and working with operators to implement all appropriate mitigation measures.

(c) A sufficient number of PSOs will be available to meet the following criteria: 100 percent monitoring of exclusion zones during all daytime periods of underwater noise-generating work; a maximum of 4 consecutive hours on watch per PSO; a maximum of approximately 12 hours on watch per day per PSO.

(d) All PSOs will complete a training course designed to familiarize individuals with monitoring and data collection procedures. A field crew leader with prior experience as a sea otter observer will supervise the PSO team. Initially, new or inexperienced PSOs will be paired with experienced PSOs so that the quality of marine mammal observations and data recording is kept consistent. Resumes for candidate PSOs will be made available for the Service to review.

(e) Observers will be provided with reticule binoculars (10×42), big-eye binoculars or spotting scopes (30×), inclinometers, and range finders. Field guides, instructional handbooks, maps, and a contact list will also be made available.

(f) Observers will collect data using the following procedures:

(1) All data will be recorded onto a field form or database.

(2) Global positioning system data, sea state, wind force, and weather will be collected at the beginning and end of a monitoring period, every hour in between, at the change of an observer, and upon sightings of sea otters.

(3) Observation records of sea otters will include date; time; the observer's locations, heading, and speed (if moving); weather; visibility; number of animals; group size and composition (adults/juveniles); and the location of the animals (or distance and direction from the observer).

(4) Observation records will also include initial behaviors of the sea otters, descriptions of project activities and underwater sound levels being generated, the position of sea otters relative to applicable monitoring and mitigation zones, any mitigation measures applied, and any apparent reactions to the project activities before and after mitigation.

(5) For all sea otters in or near a mitigation zone, observers will record the distance from the vessel to the sea otter upon initial observation, the duration of the encounter, and the distance at last observation in order to monitor cumulative sound exposures.

(6) Observers will note any instances of animals lingering close to or traveling with vessels for prolonged periods of time.

§ 18.151 - Reporting requirements.

(a) Operators must notify the Service at least 48 hours prior to commencement of activities.

(b) Monthly reports will be submitted to the Service MMM for all months during which noise-generating work takes place. The monthly report will contain and summarize the following information: dates, times, weather, and sea conditions (including the Beaufort Scale's sea state and wind force conditions) when sea otters were sighted; the number, location, distance from the sound source, and behavior of the sea otters; the associated project activities; and a description of the implementation and effectiveness of mitigation measures with a discussion of any specific behaviors the sea otters exhibited in response to mitigation.

(c) A final report will be submitted to the Service within 90 days after the expiration of each LOA. It will include the following:

(1) A summary of monitoring efforts (hours of monitoring, activities monitored, number of PSOs, and, if requested by the Service, the daily monitoring logs).

(2) A description of all project activities, along with any additional work yet to be done. Factors influencing visibility and detectability of marine mammals (e.g., sea state, number of observers, and fog and glare) will be discussed.

(3) A description of the factors affecting the presence and distribution of sea otters (e.g., weather, sea state, and project activities). An estimate will be included of the number of sea otters exposed to noise at received levels greater than or equal to 160 dBRMS re: 1 µPa (decibels root-mean squared referenced to 1 microPascal) (based on visual observation).

(4) A description of changes in sea otter behavior resulting from project activities and any specific behaviors of interest.

(5) A discussion of the mitigation measures implemented during project activities and their observed effectiveness for minimizing impacts to sea otters. Sea otter observation records will be provided to the Service in the form of electronic database or spreadsheet files.

(d) All reports must be submitted by email to [email protected].

(e) Injured, dead, or distressed sea otters that are not associated with project activities (e.g., animals known to be from outside the project area, previously wounded animals, or carcasses with moderate to advanced decomposition or scavenger damage) must be reported to the Service within 24 hours of the discovery to either the Service MMM (1-800-362-5148, business hours); or the Alaska SeaLife Center in Seward (1-888-774-7325, 24 hours a day); or both. Photographs, video, location information, or any other available documentation must be provided to the Service.

(f) Operators must notify the Service upon project completion or end of the work season.

§ 18.152 - Information collection requirements.

The Office of Management and Budget (OMB) has approved the information collection requirements contained in this part and assigned OMB Control Number 1018-0070. Federal agencies may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Direct comments regarding the burden estimate or any other aspect of the information collection to the Service's Information Collection Clearance Officer at the address provided at 50 CFR 2.1(b).

authority: 16 U.S.C. 1361
source: 39 FR 7262, Feb. 25, 1974, unless otherwise noted.
cite as: 50 CFR 18.142