The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).
authority: Reclamation Act of 1902 (32 Stat. 388); Boulder Canyon Project Act of 1928 (
43 U.S.C. 617
source: 51 FR 43154, Nov. 28, 1986, unless otherwise noted.
cite as: 10 CFR 904.6