CustomsMobile Pro beta now open!
Apply for a FREE beta account. Spaces are limited so apply today.
1 For combinations of radioactive materials, consideration of the need for an emergency plan is required if the sum of the ratios of the quantity of each radioactive material authorized to the quantity listed for that material in Schedule C exceeds one.
2 Waste packaged in Type B containers does not require an emergency plan.