DOE shall prepare and circulate EISs and related RODs in accordance with the requirements of the CEQ Regulations, as supplemented by this subpart. DOE shall include in draft and final EISs a disclosure statement executed by any contractor (or subcontractor) under contract with DOE to prepare the EIS document, in accordance with 40 CFR 1506.5(c).
[61 FR 36239, July 9, 1996]