(a) General. An operator must document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. These procedures must address, at a minimum, the following:
(1) Readiness of vehicle and launch, reentry, or landing site, including any contingency abort location;
(2) Readiness of safety-critical personnel, systems, software, procedures, equipment, property, and services; and
(3) Readiness to implement the mishap plan required by § 450.173.
(b) Application requirements. An applicant must—
(1) Demonstrate compliance with the requirements of paragraph (a) of this section through procedures that may include a readiness meeting close in time to flight; and
(2) Describe the criteria for establishing readiness to proceed with the flight of a launch or reentry vehicle so that public safety is maintained.
source: Docket No. FAA-2019-0229, Amdt. 450-2, 85 FR 79719, Dec. 10, 202085 FR 79739, Dec. 10, 2020, unless otherwise noted.
cite as: 14 CFR 450.155