Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:
(a) A general description of the project.
(b) The total number of signs to be acquired.
(c) The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.
source: 38 FR 16044, June 20, 1973, unless otherwise noted.
cite as: 23 CFR 750.307