Regulations last checked for updates: Oct 17, 2024

Title 24 - Housing and Urban Development last revised: Sep 16, 2024
§ 965.407 - Reevaluations of mastermeter systems.

Because of changes in the cost of utility services and the periodic changes in utility regulations, PHAs with mastermeter systems are required to reevaluate mastermeter systems without checkmeters by making benefit/cost analyses at least every 5 years. These analyses may be omitted under the conditions specified in § 965.406.

authority: 42 U.S.C. 1437,1437a,1437d,1437g,and. Subpart H is also issued under 42 U.S.C. 4821-4846.
source: 41 FR 20276, May 17, 1976, unless otherwise noted. Redesignated at 49 FR 6714, Feb. 23, 1984.
cite as: 24 CFR 965.407