(a) Existing contracting parties may request technical assistance and/or training by addressing the request in writing to the BIE Director.
(b) The BIE Director, or designee, will acknowledge receipt of a request for technical assistance and/or training.
(c) No later than 30 days after receiving the original request, the BIE Director will identify a point of contact and begin the process of providing technical assistance and/or training. The BIE Director and requesting contracting party will work together to identify the form, substance, and timeline for the assistance.
authority: Secs. 201-203, Pub. L. 93-638, 88 Stat. 2203, 2213-2214 (
25 U.S.C. 455-457), unless otherwise noted
source: 85 FR 10948, Feb. 25, 2020, unless otherwise noted.
cite as: 25 CFR 273.157