You must include the following information in your DWOP, as applicable, to align with the activities to be addressed in the associated platform application, including any major modifications:
(a) Structural design, fabrication, and installation information;
(b) Design, fabrication, installation, and monitoring information on the tendon, or mooring systems, including the turret or buoy system, if applicable; and
(c) Information on any active station keeping system(s) involving thrusters or other means of propulsion.