The draw of the State Road 80 bridge at Fort Myers need not be opened for the passage of vessels; however, the draw shall be restored to operable condition within 6 months after notification by the District Commander to do so.
[CGD 07-98-009, 63 FR 67402, Dec. 7, 1998]
source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
cite as: 33 CFR 117.268