(a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.
(b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.
(c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334.
[89 FR 70332, Aug. 29, 2024]
source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.
cite as: 34 CFR 75.605