Regulations last checked for updates: Nov 22, 2024

Title 34 - Education last revised: Nov 15, 2024
§ 75.605 - After the construction.

(a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.

(b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.

(c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334.

[89 FR 70332, Aug. 29, 2024]
authority: 20 U.S.C. 1221e-3 and 3474, unless otherwise noted
source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.
cite as: 34 CFR 75.605