(a) If regulations under a program require a full-time project director, the Secretary may waive that requirement under the following conditions:
(1) The project will not be adversely affected by the waiver.
(2)(i) The project director is needed to coordinate two or more related projects; or
(ii) The project director must teach a minimum number of hours to retain faculty status.
(b) The waiver either permits the grantee:
(1) To use a part-time project director; or
(2) Not to use any project director.
(c)(1) An applicant or a grantee may request the waiver.
(2) The request must be in writing and must demonstrate that a waiver is appropriate under this section.
(3) The Secretary gives the waiver in writing. The waiver is effective on the date the Secretary signs the waiver.
(Authority: 20 U.S.C. 1221e-3 and 3474)
Cross Reference:
See 2 CFR 200.308, Revision of budget and program plans.
source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.
cite as: 34 CFR 75.511