The purchaser or permittee is required to reclaim a single entry source in accordance with an approved operating plan which describes operating procedures and reclamation measures, unless the requirement is waived by the authorized officer.
source: 39 FR 31317, Aug. 28, 1974, unless otherwise noted. Redesignated at 46 FR 36142, July 14, 1981.
cite as: 36 CFR 228.54