Regulations last checked for updates: Nov 24, 2024

Title 40 - Protection of Environment last revised: Nov 21, 2024
§ 147.3007 - Application for a permit.

(a) Notwithstanding the requirements of § 144.31(c)(1) of this chapter, the owner or operator of an existing Class I or III well shall submit a complete permit application no later than 90 days after the effective date of the program.

(b) The topographic map (or other map if a topographic map is unavailable) required by § 144.31(e)(7) of this chapter, shall extend two miles from Class II wells, and 2 1/2 miles from Class I and III wells. These maps will show all the information listed in paragraph 144.31(e)(7) within 1/2 mile for Class II wells and 2 1/2 miles for Class I and III wells.

authority: 42 U.S.C. 300f
source: 49 FR 20197, May 11, 1984, unless otherwise noted.
cite as: 40 CFR 147.3007