Regulations last checked for updates: Nov 24, 2024

Title 40 - Protection of Environment last revised: Nov 21, 2024
§ 148.2 - Definitions.

Injection interval means that part of the injection zone in which the well is screened, or in which the waste is otherwise directly emplaced.

Transmissive fault or fracture is a fault or fracture that has sufficient permeability and vertical extent to allow fluids to move between formations.

authority: Secs. 3004, Resource Conservation and Recovery Act, 42 U.S.C. 6901
source: 53 FR 28154, July 26, 1988, unless otherwise noted.
cite as: 40 CFR 148.2