(a) Whenever possible, thermal processing facilities should be located in areas zoned for industrial use and having adequate utilities to serve the facility.
(b) The site should be accessible by permanent roads leading from the public road system.
(c) Environmental factors, climatological conditions, and socioeconomic factors should be given full consideration as selection criteria.
authority: Sec. 209(a), Solid Waste Disposal Act of 1965 (Pub. L. 89-272); as amended by the Resource Recovery Act of 1970 (Pub. L. 91-512)
source: 39 FR 29329, Aug. 14, 1974, unless otherwise noted.
cite as: 40 CFR 240.202-2