Name of SIP provision
| Applicable geographic or nonattainment area
| State
submittal/
effective date
| EPA approval date
| Explanation
|
---|
Emissions Inventory for Crittenden County | Crittenden County | 6/22/2007 | 1/15/2009, 74 FR 2383
| |
8-Hour Ozone Maintenance plan for the Crittenden County, Arkansas Area | Crittenden, Shelby County | 2/26/2009 | 3/24/2010, 75 FR 14077
| |
Interstate Transport for the 1997 ozone and PM2.5 NAAQS (Noninterference with measures required to protect visibility in any other State) | Statewide | 3/28/2008 | 3/12/2012, 77 FR 14604 | Noninterference with measures required to protect visibility in any other State partially approved 3/12/2012.
|
Regional Haze SIP | Statewide | 9/23/2008,
8/3/2010 | 3/12/2012, 77 FR 14604 | The following portions are partially approved and partially disapproved:
|
(a) Identification of affected Class I areas | | | | (a) Identification of best available retrofit technology (BART) eligible sources and subject to BART sources;
|
(b) Determination of baseline and natural visibility conditions | | | | (b) requirements for best available retrofit technology (BART);
|
(c) Determination of the Uniform Rate of Progress | | | | (c) the Arkansas Regional Haze Rule; and
|
(d) Reasonable progress goal consultation and long term strategy consultation | | | | (d) Long Term Strategy. (See § 52.173(a)).
|
(e) Coordination regional haze and reasonably attributable visibility impairment
| | | | |
(f) Monitoring Strategy and other implementation requirements
| | | | |
(g) Commitment to submit periodic Regional Haze SIP revisions and periodic progress reports describing progress towards the reasonable progress goals
| | | | |
(h) Commitment to make a determination of the adequacy of the existing SIP at the time a progress report is submitted
| | | | |
(i) Coordination with States and Federal Land Managers
| | | | |
(j) The following best available retrofit technology (BART) determinations: PM BART determination for the AEP Flint Creek Plant Boiler No. 1; SO2 and PM BART determinations for the natural gas firing scenario for the Entergy Lake Catherine Plant Unit 4; PM BART determinations for both the bituminous and sub-bituminous coal firing scenarios for the Entergy White Bluff Plant Units 1 and 2; and PM BART determination for the Domtar Ashdown Mill Power Boiler No. 1
| | | | |
Infrastructure for the 1997 Ozone NAAQS | Statewide | 12/17/2007
3/28/2008 | 8/20/2012, 77 FR 50033 | Approval for CAA elements 110(a)(2)(A), (B), (E), (F), (G), (H), (K), (L), and (M). Approval for CAA elements 110(a)(2)(C), (D)(i)(II) (interfere with measures in any other state to prevent significant deterioration of air quality), (D)(ii), and (J) for the 1997 ozone NAAQS, except as it relates to Greenhouse Gas (GHG) emissions. The GHG PSD deficiency was addressed on April 2, 2013 (78 FR 19596).
|
Infrastructure for the 1997 and 2006 PM2.5 NAAQS | Statewide | 3/28/2008,
9/16/2009,
12/1/2014 | 3/4/2015, 80 FR 11573 | Approval for CAA elements 110(a)(2)(A), (B), (E), (F), (G), (H), (K), (L), and (M) on 8/20/2012, 77 FR 50033. Approval for PSD elements (C), (D)(i)(II) (interfere with measures in any other state to prevent significant deterioration of air quality), D(ii) and (J) on March 4, 2015 (80 FR 11573)
|
Interstate transport for the 1997 ozone NAAQS (Noninterference with measures required to prevent significant deterioration of air quality in any other State) | Statewide | 4/5/2011 | 8/20/2012, 77 FR 50033 | Approved except as it relates to GHGs. The GHG PSD deficiency was addressed on April 2, 2013 (78 FR 19596).
|
Interstate transport for the 1997 and 2006 PM2.5 NAAQS (contribute to nonattainment or interfere with maintenance) | Statewide | 12/17/2007
9/16/2009 | 8/29/2013, 78 FR 53269 | |
Crittenden County Base Year Emission Inventory for the 2008 Ozone Standard | Crittenden County | 8/28/2015 | 1/13/2016, 81 FR 1884 | |
2008 8-hour ozone Redesignation Request, Maintenance Plan, and Clarification Letter for the Crittenden County portion of Memphis, TN-AR-MS Nonattainment Area | Crittenden County portion of Memphis, TN-AR-MS Nonattainment Area | 12/10/2015 | 4/25/2016, 81 FR 24030 | |
Arkansas Regional Haze NOX SIP Revision | Statewide | 10/31/2017 | 2/12/2018, 83 FR 5927 | Regional Haze SIP submittal addressing NOX BART requirements for Arkansas EGUs and reasonable progress requirements for NOX for the first implementation period.
|
Infrastructure for the 2006 PM2.5 NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(D)(ii).
|
Infrastructure for the 2008 Pb NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L) and (M).
|
Infrastructure for the 2008 O3 NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(A), (B), (C), (D)(i) (portions pertaining and PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
|
Infrastructure for the 2010 NO2 NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(A), (B), (C), (D)(i)(portion pertaining to nonattainment interference with maintenance and PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
|
Infrastructure for the 2010 SO2 NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M). Approval for 110(a)(2)(D)(i)(I) on 10/18/2019.
|
Infrastructure for the 2012 PM2.5 NAAQS | Statewide | 3/24/2017 | 2/14/2018, 83 FR 6470 | Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
Approval for 110(a)(2)(D)(i)(I) (significant contribution to nonattainment or interfere with maintenance in any other state) on 9/20/2018, 83 FR 47569.
|
Arkansas Regional Haze Phase II SIP Revision | Statewide | 8/8/2018 | 9/27/2019, 84 FR 51033 | Regional Haze SIP revision addressing SO2 and PM BART requirements for Arkansas EGUs, NOX BART requirement for the White Bluff Auxiliary Boiler, reasonable progress requirements for SO2 and PM for the first implementation period, and the long-term strategy requirements. We are approving a portion of this SIP revision. There are two aspects of this SIP revision we are not taking action on at this time: (1) The interstate visibility transport requirements under section 110(a)(2)(D)(i)(II); and (2) the long-term strategy is approved with respect to sources other than the Domtar Ashdown Mill.
|
Arkansas SIP Review for the Five-Year Regional Haze Progress Report | Statewide | 6/2/2015 | 10/1/2019, 84 FR 51986
| |
Infrastructure for the 2015 O3 NAAQS | Statewide | 9/27/2019 | 2/12/2021, 86 FR 9290 | Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L) and (M).
|
Arkansas Regional Haze Phase III SIP Revision | Statewide | 8/13/2019 | 3/22/2021, 86 FR 15104 | Approval of regional haze SIP revision pertaining to the Domtar Ashdown mill that addresses SO2, NOX, and PM10 BART alternative requirements under 40 CFR 51.308(e)(2); reasonable progress components under 40 CFR 51.308(d)(1); and long-term strategy components under 40 CFR 51.308(d)(3) for this facility.
|
Arkansas 2015 O3 NAAQS Interstate Transport SIP Revision | Statewide | 10/4/2019 | 3/22/2021, 86 FR 15104 | Approval of visibility transport portion of this interstate transport SIP revision that addresses CAA section 110(a)(2)(D)(i)(II) for the following NAAQS: 2006 24-hour PM2.5 NAAQS; the 2012 annual PM2.5 NAAQS; the 2008 and 2015 eight-hour O3 NAAQS; the 2010 one-hour NO2 NAAQS; and the 2010 one-hour SO2 NAAQS.
|
Arkansas Regional Haze SO2 and PM SIP Revision | Statewide | 8/8/2018 | 3/22/2021, 86 FR 15104 | Approval of visibility transport portion of this regional haze SIP revision, as supplemented by the Arkansas 2015 O3 NAAQS Interstate Transport SIP Revision. |