Regulations last checked for updates: Nov 24, 2024

Title 40 - Protection of Environment last revised: Nov 21, 2024
§ 52.1870 - Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Ohio under Section 110 of the Clean Air Act, 42 U.S.C. 7401 et seq., and 40 CFR part 51 to meet National Ambient Air Quality Standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to September 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with an EPA approval date after September 1, 2015, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 5 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the SIP as of September 1, 2015.

(3) Copies of the materials incorporated by reference may be inspected at the Environmental Protection Agency, Region 5, Air Programs Branch, 77 West Jackson Boulevard, Chicago, IL 60604 or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA approved regulations.

EPA-Approved Ohio Regulations

Ohio citation Title/Subject Ohio
effective
date
EPA Approval
date
Notes
Chapter 3745-14 Nitrogen Oxides—Reasonably Available Control Technology
3745-14-01Definitions and General Provisions8/22/20194/8/2020, 85 FR 19670
3745-14-03Permit Requirements1/29/20189/17/2019, 84 FR 48789
3745-14-04Compliance Certification8/22/20194/8/2020, 85 FR 19670
3745-14-08Monitoring and Reporting8/22/20194/8/2020, 85 FR 19670
3745-14-11Portland Cement Kilns7/18/20028/5/2003, 68 FR 46089
3745-14-12Stationary Internal Combustion Engines5/7/20052/4/2008, 73 FR 6427
Chapter 3745-15 General Provisions on Air Pollution Control
3745-15-01Definitions1/22/20095/10/2010, 75 FR 25770
3745-15-02Purpose1/25/198010/1/1982, 47 FR 43375
3745-15-03Submission of Emission Information6/30/20082/20/2013, 78 FR 11748Only (A).
3745-15-04Measurement of Emissions of Air Contaminants1/25/198010/1/1982, 47 FR 43375
3745-15-05De Minimis Air Contaminant Source Exemption1/22/20095/10/2010, 75 FR 25770
3745-15-06Malfunction of Equipment; Scheduled Maintenance; Reporting1/25/198010/1/1982, 47 FR 43375
3745-15-08Circumvention1/25/198010/1/1982, 47 FR 43375
3745-15-09Severability1/25/198010/1/1982, 47 FR 43375
Chapter 3745-16 Stack Height Requirements
3745-16-01Definitions3/5/19868/25/1988, 53 FR 32392
3745-16-02Good Engineering Practice Stack Height Requirements3/5/19868/25/1988, 53 FR 32392
Chapter 3745-17 Particulate Matter Standards
3745-17-01Definitions and Referenced Materials8/25/20237/18/2024, 89 FR 58293
3745-17-03Measurement Methods and Procedures8/25/20237/18/2024, 89 FR 58293Except for paragraph (B)(1)(b) and the phrase in paragraph (B)(1)(a) reading “Except as provided in paragraph (B)(1)(b) of this rule”.
3745-17-04Compliance Time Schedules8/25/20237/18/2024, 89 FR 58293
3745-17-07Control of Visible Particulate Emissions from Stationary Sources8/25/20237/18/2024, 89 FR 58293
3745-17-08Restriction of Emission of Fugitive Dust8/25/20237/18/2024, 89 FR 58293
3745-17-09Restrictions on Particulate Emissions and Odors from Incinerators8/25/20237/18/2024, 89 FR 58293
3745-17-10Restrictions on Particulate Emissions from Fuel Burning Equipment8/25/20237/18/2024, 89 FR 58293
3745-17-11Restrictions on Particulate Emissions from Industrial Processes8/25/20237/18/2024, 89 FR 58293
3745-17-12Additional Restrictions on Particulate Emissions from Specific Air Contaminant Sources in Cuyahoga County8/25/20237/18/2024, 89 FR 58293
3745-17-13Additional Restrictions on Particulate Emissions from Specific Air Contaminant Sources in Jefferson County8/25/20237/18/2024, 89 FR 58293
3745-17-14Contingency Plan Requirements for Cuyahoga and Jefferson Counties8/25/20237/18/2024, 89 FR 58293
Chapter 3745-18 Sulfur Dioxide Regulations
3745-18-01Definitions and incorporation by reference2/3/20225/30/2023, 88 FR 34449
3745-18-02General countywide emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-03Compliance Time Schedules2/3/20225/30/2023, 88 FR 34449
3745-18-04Measurement Methods and Procedures2/3/20225/30/2023, 88 FR 34449 Except (D)(2), (D)(3), (D)(5), (D)(6), (E)(2), (E)(3), and (E)(4).
3745-18-05Ambient and Meteorological Monitoring Requirements2/3/20225/30/2023, 88 FR 34449
3745-18-06General Emission Limit Provisions2/3/20225/30/2023, 88 FR 34449
3745-18-08Allen county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-10Ashtabula county emissions limits2/3/20225/30/2023, 88 FR 34449
3745-18-11Athens county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-15Butler county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-23Crawford county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-24Cuyahoga county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-26Defiance county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-28Erie county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-31Franklin county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-33Gallia county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-35Greene county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-37Hamilton county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-47Jefferson county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-49Lake county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-53Lorain county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-54Lucas county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-56Mahoning county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-61Miami county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-63Montgomery county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-66Muskingum County Emission Limits2/16/201710/11/2018, 83 FR 51361
3745-18-68Ottawa county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-69Paulding county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-77Ross county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-78Sandusky county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-80Seneca county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-82Stark County Emission Limits4/16/202310/7/2024, 89 FR 81008
3745-18-83Summit County Emission Limits2/3/20225/30/2023, 88 FR 34449
3745-18-84Trumbull County Emission Limits2/3/20225/30/2023, 88 FR 34449
3745-18-85Tuscarawas County Emission Limits2/3/20225/30/2023, 88 FR 34449
3745-18-90Washington County Emission Limits2/3/20225/30/2023, 88 FR 34449
3745-18-91Wayne county emission limits2/3/20225/30/2023, 88 FR 34449
3745-18-92Williams county emission limits2/3/20225/30/2023, 88 FR 34449
Chapter 3745-19 Open Burning Standards
3745-19-01Definitions4/30/20186/24/2019, 84 FR 29378
3745-19-02Relations to Other Prohibitions7/7/20063/21/2008, 73 FR 15081
3745-19-03Open burning in restricted areas4/30/20186/24/2019, 84 FR 29378
3745-19-04Open burning in unrestricted areas4/30/20186/24/2019, 84 FR 29378
3745-19-05Permission to individuals and notification to the Ohio EPA4/30/20186/24/2019, 84 FR 29378
Chapter 3745-21 Carbon Monoxide, Ozone, Hydrocarbon Air Quality Standards, and Related Emission Requirements
3745-21-01Definitions and incorporation by reference10/15/20159/8/2017, 82 FR 42451
3745-21-02Ambient air quality standards and guidelines8/25/20087/28/2009, 74 FR 37171
3745-21-03Methods of ambient air quality measurement10/15/20159/8/2017, 82 FR 42451
3745-21-04Compliance time schedules10/15/20159/8/2017, 82 FR 42451
3745-21-06Classification of regions8/25/20087/28/2009, 74 FR 37171
3745-21-07Control of emissions of organic materials from stationary sources (i.e., emissions that are not regulated by rule 3745-21-09, 3745-21-12, 3745-21-13, 3745-21-14, 3745-21-15, 3745-21-16, or 3745-21-18 of the administrative code)2/18/20088/19/2011, 76 FR 51901
3745-21-08Control of carbon monoxide emissions from stationary sources10/15/20159/8/2017, 82 FR 42451
3745-21-09Control of emissions of volatile organic compounds from stationary sources and perchloroethylene from dry cleaning facilities2/16/201910/30/2020, 85 FR 68758
3745-21-10Compliance test methods and procedures2/16/201910/30/2020, 85 FR 68758
3745-21-12Control of volatile organic compound emissions from commercial bakery oven facilities10/15/20159/8/2017, 82 FR 42451
3745-21-13Control of volatile organic compound emissions from reactors and distillation units employed in SOCMI chemical production10/15/20159/8/2017, 82 FR 42451
3745-21-14Control of volatile organic compound emissions from process vents in batch operations10/15/20159/8/2017, 82 FR 42451
3745-21-15Control of volatile organic compound emissions from wood furniture manufacturing operations10/15/20159/8/2017, 82 FR 42451
3745-21-16Control of volatile organic compound emissions from industrial wastewater10/15/20159/8/2017, 82 FR 42451
3745-21-17Portable fuel containers10/15/20159/8/2017, 82 FR 42451
3745-21-18Commercial motor vehicle and mobile equipment refinishing operations10/15/20159/8/2017, 82 FR 42451
3745-21-19Control of volatile organic compound emissions from aerospace manufacturing and rework facilities10/15/20159/8/2017, 82 FR 42451
3745-21-20Control of volatile organic emissions from shipbuilding and ship repair operations (marine coatings)10/15/20159/8/2017, 82 FR 42451
3745-21-21Storage of volatile organic liquids in fixed roof tanks and external floating roof tanks10/15/20159/8/2017, 82 FR 42451
3745-21-22Control of volatile organic compound emissions from offset lithographic printing and letterpress printing facilities10/15/20159/8/2017, 82 FR 42451
3745-21-23Control of volatile organic compound emissions from industrial solvent cleaning operations10/15/20159/8/2017, 82 FR 42451
3745-21-24Flat wood paneling coatings10/15/20159/8/2017, 82 FR 42451
3745-21-25Control of VOC emissions from reinforced plastic composites production operations2/16/201910/30/2020, 85 FR 68758
3745-21-26Surface coating of miscellaneous metal and plastic parts2/16/201910/30/2020, 85 FR 68758
3745-21-27Boat manufacturing10/15/20159/8/2017, 82 FR 42451
3745-21-28Miscellaneous industrial adhesives and sealants2/16/201910/30/2020, 85 FR 68758
3745-21-29Control of volatile organic compound emissions from automobile and light-duty truck assembly coating operations, and cleaning operations associated with these coating operations2/16/201910/30/2020, 85 FR 68758
Chapter 3745-23 Nitrogen Oxide Standards
3745-23-01Definitions4/18/200910/26/2010, 75 FR 65572
3745-23-02Methods of Measurement4/18/200910/26/2010, 75 FR 65572
Chapter 3745-24 Nitrogen Oxide Emission Statements
3745-24-01Definitions12/16/20059/27/2007, 72 FR 54844
3745-24-02Applicability12/16/20059/27/2007, 72 FR 54844
3745-24-03Deadlines for the Submission of the Emission Statements12/16/20059/27/2007, 72 FR 54844
3745-24-04Emission Statement Requirements4/1/199410/13/1994, 59 FR 51863
Chapter 3745-25 Emergency Episode Standards
3745-25-01Definitions4/18/200910/26/2010, 75 FR 65572
3745-25-02Ambient Air Quality Standards4/18/200910/26/2010, 75 FR 65572
3745-25-03Air Pollution Emergencies and Episode Criteria8/21/200910/26/2010, 75 FR 65572
3745-25-04Air Pollution Emergency Emission Control Action Programs4/18/200910/26/2010, 75 FR 65572
3745-25-05Air Pollution Emergency Orders4/18/200910/26/2010, 75 FR 65572
Chapter 3745-26 I/M Program Rules and Regulations
3745-26-01Definitions8/15/19961/6/1997, 62 FR 646
3745-26-02Obligations of the Motor Vehicle Owner in the Anti-tampering and Basic Automobile Inspection and Maintenance Programs6/13/19944/4/1995, 60 FR 16989
3745-26-03Inspection Station Licensing Procedure5/15/199012/17/1993, 58 FR 65933
3745-26-04Licensed Inspection Station Requirements and Obligations5/15/199012/17/1993, 58 FR 65933
3745-26-05Provisions for Qualification as a Class B Inspection Station5/15/199012/17/1993, 58 FR 65933
3745-26-06Requirements for Certified Inspectors5/15/199012/17/1993, 58 FR 65933
3745-26-07Suspension or Revocation of Inspection Station License or Inspector Certification5/15/199012/17/1993, 58 FR 65933
3745-26-08Procedure for Station Change of Ownership, Name, or Location, or Cessation of Inspection Operation5/15/199012/17/1993, 58 FR 65933
3745-26-09Fee System5/15/199012/17/1993, 58 FR 65933
3745-26-10Requirements for Contractors in the Basic Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program6/13/19944/4/1995, 60 FR 16989
3745-26-11Inspection Requirements5/15/199012/17/1993, 58 FR 65933
3745-26-12Requirements for Motor Vehicle Owners in the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program8/15/19961/6/1997, 62 FR 646
3745-26-13Requirements for Certified Inspectors in the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program6/13/19944/4/1995, 60 FR 16989
3745-26-14Enforcement of Program Rules and Regulations for the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program6/13/19944/4/1995, 60 FR 16989
Chapter 3745-31 Permit-to Install New Sources and Permit-to-Install and Operate Program
3745-31-01Definitions3/20/20173/7/2019, 84 FR 8257Except for (I), (NN)(2)(b) and (c), (SSS)(1)(b), (CCCC)(2)(d) through (h), (QQQQ), (JJJJJ), and (BBBBBB).
3745-31-02Applicability, Requirements, and Obligations5/29/20146/25/2015, 80 FR 36477
3745-31-03Exemptions and Permits-by-Rule5/1/20163/7/2019, 84 FR 8257Except for (B)(1)(p) and (C)(2)(c)(iii).
3745-31-04Applications5/29/20146/25/2015, 80 FR 36477
3745-31-05Criteria for Decision by the Director5/1/20164/12/2019, 84 FR 14874Except for (E).
3745-31-06Completeness Determinations, Processing Requirements, Public Participation, Public Notice and Issuance5/1/20163/7/2019, 84 FR 8257
3745-31-07Termination, Revocation, Expiration, Renewal, Revision and Transfer5/29/20146/25/2015, 80 FR 36477
3745-31-08Registration Status Permit-to-operate5/29/20146/25/2015, 80 FR 36477
3745-31-09Variances on Operation5/29/20146/25/2015, 80 FR 36477
3745-31-10NSR Projects at Existing Emissions Units at a Major Stationary Source5/29/20146/25/2015, 80 FR 36477
3745-31-11Attainment Provisions—Ambient Air Increments, Ceilings and Classifications5/1/20163/7/2019, 84 FR 8257
3745-31-12Attainment Provisions—Data Submission Requirements5/29/20146/25/2015, 80 FR 36477
3745-31-13Attainment Provisions—Review of Major Stationary Sources and Major Modifications, Stationary Source Applicability and Exemptions5/1/20163/7/2019, 84 FR 8257Except for (H)(1)(c).
3745-31-14Attainment Provisions—Pre-application Analysis5/1/20163/7/2019, 84 FR 8257
3745-31-15Attainment Provisions—Control Technology Review5/29/20146/25/2015, 80 FR 36477
3745-31-16Attainment Provisions—Major Stationary Source Impact Analysis5/29/201410/28/2014, 79 FR 64119
3745-31-17Attainment Provisions—Additional Impact Analysis5/29/20146/25/2015, 80 FR 36477
3745-31-18Attainment Provisions—Air Quality Models5/29/20146/25/2015, 80 FR 36477
3745-31-19Attainment Provisions—Notice to the United States Environmental Protection Agency5/29/20146/25/2015, 80 FR 36477
3745-31-20Attainment Provisions—Innovative Control Technology5/29/20146/25/2015, 80 FR 36477
3745-31-21Nonattainment Provisions—Review of Major Stationary Sources and Major Modifications—Stationary Source Applicability and Exemptions5/29/20146/25/2015, 80 FR 36477
3745-31-22Nonattainment Provisions—Conditions for Approval5/29/20146/25/2015, 80 FR 36477Except for (A)(3)(b).
3745-31-23Nonattainment provisions—stationary sources locating in designated clean or unclassifiable areas which would cause or contribute to a violation of a national ambient air quality standard5/29/20146/25/2015, 80 FR 36477Except for the 1-hour NO2 Significant Impact Level in the table in paragraph (A).
3745-31-24Nonattainment Provisions—Baseline for Determining Credit for Emission and Air Quality Offsets5/29/20146/25/2015, 80 FR 36477Except for (F).
3745-31-25Nonattainment provisions—location of offsetting emissions5/29/20146/25/2015, 80 FR 36477
3745-31-26Nonattainment Provisions—Offset Ratio Requirements5/29/20146/25/2015, 80 FR 36477Except for (D).
3745-31-27Nonattainment Provisions—Administrative Procedures for Emission Offsets5/29/20146/25/2015, 80 FR 36477Except for (A)(1)(b).
3745-31-29General Permit-to-install and General PTIO5/29/20146/25/2015, 80 FR 36477
3745-31-32Plantwide Applicability Limit (PAL)5/29/20146/25/2015, 80 FR 36477
3745-31-34Permits to install for major stationary sources and major modifications of sources emitting greenhouse gases3/31/20112/14/2020, 85 FR 8406Except for (B), (C) and (D).
Chapter 3745-49 Miscellaneous Rules
3745-49-01Administrative Procedures—applicability and construction of rules4/2/20124/23/2021, 86 FR 21648
3745-49-02Administrative procedures—definitions4/2/20124/23/2021, 86 FR 21648
3745-49-05Draft actions and proposed actions4/2/20124/23/2021, 86 FR 21648
3745-49-06Issuance of final actions4/2/20124/23/2021, 86 FR 21648
3745-49-07Public notice7/27/20194/23/2021, 86 FR 21648
3745-49-08Contents of public notices4/2/20124/23/2021, 86 FR 21648
Chapter 3745-101 Transportation Conformity
3745-101-02Definitions2/16/19995/30/2000, 65 FR 34395
3745-101-03Applicability, Priority, and Frequency of Conformity Determinations2/16/19995/30/2000, 65 FR 34395Only (A), (B), (C), (D), (G), (H), (I), (J), (K), and (L).
3745-101-05Content of Transportation Plans2/16/19995/30/2000, 65 FR 34395
3745-101-06Relationship with NEPA and Fiscal Constraints2/16/19995/30/2000, 65 FR 34395
3745-101-07Criteria and Procedures for Conformity Determination, Assumptions, Emissions Model, and Consultation2/16/19995/30/2000, 65 FR 34395Only (A), (B), and (C) Except (C)(1)(a) and (C)(2)(a).
3745-101-08Criteria and Procedures for Implementation of TCMs, Current Conformity, and Projects from a Plan and TIP2/16/19995/30/2000, 65 FR 34395
3745-101-09Localized CO and PM10 Violations and Compliance with PM10 Control Measures2/16/19995/30/2000, 65 FR 34395
3745-101-10Motor Vehicle Emissions Budgets2/16/19995/30/2000, 65 FR 34395
3745-101-11Criteria and Procedures: Emission Reductions in Areas without Motor Vehicle Emissions Budgets2/16/19995/30/2000, 65 FR 34395
3745-101-12Consequences of Control Strategy Implementation Plan Failures2/16/19995/30/2000, 65 FR 34395Except for (A)(2).
3745-101-13Requirements for Adoption or Approval of Projects by Other Recipients of Funds Designated Under Title 23 U.S.C. or the Federal Transit Laws2/16/19995/30/2000, 65 FR 34395Except for (A)(1).
3745-101-14Procedures for Determining Regional Transportation-related Emissions2/16/19995/30/2000, 65 FR 34395
3745-101-15Procedures for Determining Localized CO and PM10 Concentrations (Hot-spot Analysis)2/16/19995/30/2000, 65 FR 34395
3745-101-17Enforceability of Design Concept and Scope and Project-level Mitigation and Control Measures2/16/19995/30/2000, 65 FR 34395
3745-101-18Exempt Projects2/16/19995/30/2000, 65 FR 34395
3745-101-19Traffic Signal Synchronization Projects2/16/19995/30/2000, 65 FR 34395
Chapter 3745-102 General Federal Action Conformity
3745-102-01Purpose8/21/19953/11/1996, 61 FR 9644
3745-102-02Definitions8/21/19953/11/1996, 61 FR 9644
3745-102-03Applicability8/21/19953/11/1996, 61 FR 9644
3745-102-04Analysis, Other Requirements8/21/19953/11/1996, 61 FR 9644
3745-102-05Conformity Determinations8/21/19953/11/1996, 61 FR 9644
3745-102-06Mitigation of Air Quality Impacts8/21/19953/11/1996, 61 FR 9644
Chapter 3745-110—Nitrogen Oxides—Reasonably Available Control Technology
3745-110-03RACT requirements and/or limitations for emissions of NOX from stationary sources7/18/20139/8/2017, 82 FR 42451Only the NOX emission limitation on unit P046 contained in 3745-110-03(N).
3745-110-05Compliance methods7/18/20139/8/2017, 82 FR 42451Only (A). For purposes of demonstrating compliance with the NOX emission limitation on unit P046 contained in 3745-110-03(N).
Chapter 3745-112 Volatile Organic Compound Limits in Consumer Products
3745-112-01Definitions6/20/20227/10/2023, 88 FR 43440
3745-112-02Applicability6/20/20227/10/2023, 88 FR 43440
3745-112-03Standards6/20/20227/10/2023, 88 FR 43440
3745-112-04Exemptions6/20/20227/10/2023, 88 FR 43440
3745-112-05Administrative Requirements6/20/20227/10/2023, 88 FR 43440
3745-112-06Reporting Requirements6/20/20227/10/2023, 88 FR 43440
3745-112-07Variances6/20/20227/10/2023, 88 FR 43440
3745-112-08Test Methods6/20/20227/10/2023, 88 FR 43440

(d) EPA approved state source-specific requirements.

EPA-Approved Ohio Source-Specific Provisions

Name of source Number Ohio
effective
date
EPA Approval date Comments
Accel Group, IncP01203459/16/201910/30/2020, 85 FR 68758Only paragraphs B.4, B.6, B.8, B.9.c), C.1.b)(1)d, C.1.b)(2)a, C.1.d)(2), C.1.d)(3), C.1.e)(3), C.1.f)(1)c, C.2.b)(1)d, C.2.b)(2)a, C.2.d)(2), C.2.d)(3), C.2.e)(3), and C.2.f)(1)e.
AK Steel CorporationDirector's Final Findings and Orders (DFFO)8/18/19954/25/1996, 61 FR 18255
Excello SpecialtyPTI 13-239612/11/19914/25/1996, 61 FR 18255
Ford-Cleveland CastingDFFO7/10/19955/6/1996, 61 FR 20139
Ford-Engine Plant 1DFFO5/31/19962/25/1997, 62 FR 8383
Forest City Technologies, Plant 4P01279846/23/202012/5/2023, 88 FR 84241Only paragraphs C.1.b)(1)e., C.1.d)(3), C.1.e)(1)c., C.1.f)(1)d., C.2.b)(1)e., C.2.d)(4), C.2.e)(3)b., and C.2.f)(1)d.
Globe Metallurgical Inc.DFFOs5/23/20239/8/2023, 88 FR 61969
Hilton DavisPTI 14-20966/12/19914/25/1996, 61 FR 18255
International Mill ServicesDFFO7/12/19955/6/1996, 61 FR 20139
International Paper CompanyDFFO8/18/19954/25/1996, 61 FR 18255
Luria BrothersDFFO7/10/19955/6/1996, 61 FR 20139
Midwest Mica & Insulation CoDFFO8/18/19954/25/1996, 61 FR 18255
Morgan Adhesives CoDFFO7/5/20004/17/2001, 74 FR 19721
P.H. Glatfelter Co.—ChillicotheP011890707/20/1503/04/16, 81 FR 11447Regional haze BART emissions limits.
Reilly Industries, IncDFFO8/18/19954/25/1996, 61 FR 18255
Sprayon Products, IncDFFO8/18/19954/25/1996, 61 FR 18255
T&B Foundry CompanyDFFO7/10/19955/6/1996, 61 FR 20139
United Ready MixDFFO7/10/19955/6/1996, 61 FR 20139
Wheeling-Pittsburg Steel CorporationDFFO10/31/19956/12/1996, 61 FR 29662

(e) EPA approved nonregulatory and quasi-regulatory provisions.

EPA-Approved Ohio Nonregulatory and Quasi-Regulatory Provisions

Title Applicable geographical or non-attainment area State date EPA approval Comments
Legislative Provisions
Authority to Require NSR PermitsStatewide1/25/1982ORC 3704.03 (F).
Local Permits for Burning Construction DebrisStatewide7/15/1985ORC 3704.11 (C).
Ohio EPA AuthorityStatewide1/25/1982ORC 3704 (summary).
Requirements for Board MembersStatewide1/25/1982ORC 102 (summary).
Definition of Air ContaminantStatewideORC 3704.01 (B); submitted 8/26/1982.
Summary of Criteria Pollutant Attainment Plans
Ozone (8-Hour, 2015)Cincinnati7/24/20203/3/2021, 86 FR 12270EPA is approving only the 2014 base year emissions inventory and emissions statement elements.
Ozone (8-Hour, 2015)Cleveland7/24/20203/3/2021, 86 FR 12270EPA is approving only the 2014 base year emissions inventory and emissions statement elements.
PM2.5 (2012)Cleveland10/14/20169/6/2018, 83 FR 45193EPA is approving the following elements: the base year 2011 emissions inventory; the demonstration of attainment for 2021; current controls as meeting RACM requirements.
SO2 (2010)Lake County2/16/20172/14/2019, 84 FR 3986EPA is approving the following plan elements: The emission inventory; the demonstration of attainment; and revised emission limits as meeting RACM requirements.
SO2 (2010)Muskingum River5/24/20239/8/2023, 88 FR 61969
SO2 (2010)Steubenville6/25/201910/22/2019, 84 FR 56385
Summary of Criteria Pollutant Maintenance Plan
Ozone 1-HourCincinnati (Butler, Clermont, Hamilton, and Warren Counties)6/28/19997/5/2000, 65 FR 37879
Ozone 1-HourColumbiana County3/25/19943/10/1995, 59 FR 48395
Ozone 1-HourColumbus (Franklin, Delaware and Licking Counties)1/1/19944/1/1996, 61 FR 3591
Ozone 1-HourDayton-Springfield (Miami, Montgomery, Clark, and Greene Counties)11/8/19937/5/1995, 60 FR 22289
Ozone 1-HourJefferson County3/25/19943/10/1995, 58 FR 66334
Ozone 1-HourYoungstown (Mahoning and Trumbull Counties) and Canton (Stark County)3/25/19944/1/1996, 61 FR 3319
Ozone (8-Hour, 1997)Canton (Stark County)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Cincinnati (Butler, Clermont, Clinton, Hamilton, and Warren Counties)12/14/20095/11/2010, 75 FR 26118
Ozone (8-Hour, 1997)Cleveland (Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, and Summit Counties)3/17/20099/15/2009, 74 FR 47414
Ozone (8-Hour, 1997)Columbus (Delaware, Fairfield, Franklin, Knox, Licking, and Madison Counties)3/17/20099/15/2009, 74 FR 47404
Ozone (8-Hour, 1997)Dayton-Springfield (Miami, Montgomery, Clark, and Greene Counties)4/12/201910/1/2019, 84 FR 52001
Ozone (8-Hour, 1997)Lima (Allen County)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Parkersburg-Marietta (Washington County)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Steubenville-Weirton (Jefferson County)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Toledo (Lucas and Wood Counties)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Wheeling (Belmont County)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 1997)Youngstown (Columbiana, Mahoning and Trumbull Counties)4/12/201911/19/2019, 84 FR 63806
Ozone (8-Hour, 2015)Columbus (Delaware, Fairfield, Franklin, and Licking Counties4/23/20198/21/2019, 84 FR 43508
Ozone (8-Hour, 2015)Cincinnati (Butler, Clermont, Hamilton, and Warren Counties)12/21/20216/9/2022, 87 FR 35104EPA is approving the following elements: a determination that the Cincinnati area has attained the 2015 8-Hour ozone standard, a maintenance plan for the 2015 a8-Hour ozone NAAQS, 2026 and 2035 VOC and NOX motor vehicle emission budgets for the Cincinnati area.
PM-10Cuyahoga and Jefferson Counties5/22/20001/10/2001, 65 FR 77308
PM2.5 (1997)Canton (Stark County)6/26/201210/22/2013, 78 FR 62459
PM2.5 (1997)Cincinnati (Butler, Clermont, Hamilton, and Warren Counties)1/25/201112/23/2011, 76 FR 80253
PM2.5 (1997)Cleveland (Ashtabula, Cuyahoga, Lake, Lorain, Medina, Portage, and Summit Counties)10/5/20119/18/2013, 78 FR 57270
PM2.5 (1997)Columbus (Coshocton, Delaware, Fairfield, Franklin, and Licking Counties)6/3/201111/7/2013, 78 FR 66845
PM2.5 (1997)Dayton-Springfield (Clark, Greene, and Montgomery Counties)6/1/20119/26/2013, 78 FR 59258
PM2.5 (1997)Huntington-Ashland (Adams, Gallia, Lawrence, and Scioto Counties)5/4/201112/31/2012, 77 FR 76883
PM2.5 (1997)Parkersburg-Marietta (Washington County)2/29/20128/29/2013, 78 FR 53275
PM2.5 (1997)Steubenville-Weirton (Jefferson County)4/16/20129/18/2013, 78 FR 57273
PM2.5 (1997)Wheeling (Belmont County)4/16/20128/29/2013, 78 FR 53275
PM2.5 (2006)Canton (Stark County)9/8/20211/22/2024, 89 FR 38892nd maintenance plan.
PM2.5 (2006)Cleveland (Cuyahoga, Lake, Lorain, Medina, Portage, and Summit Counties)9/8/20211/22/2024, 89 FR 38892nd maintenance plan.
PM2.5 (2006)Steubenville-Weirton (Jefferson County)9/8/20211/22/2024, 89 FR 38892nd maintenance plan.
PM2.5 (2012)Cleveland7/24/20184/12/2019, 84 FR 14881EPA is approving the following elements: a determination that the Cleveland area has attained the 2012 annual PM2.5 standard, a maintenance plan for the 2012 annual PM2.5 NAAQS, 2022 and 2030 primary PM2.5 and NOX MVEBs for the Cleveland area.
SO2 (1971)Center Township (Morgan County) and Waterford Township (Washington County)6/25/19929/21/1994, 59 FR 48403
SO2 (1971)Lake County and Steubenville/Mingo Junction (Jefferson County)10/26/19958/30/1999, 64 FR 47113
SO2 (1971)Franklin Township (Coshocton County), Addison Township (Gallia County), and Lorain County3/20/20006/5/2000, 65 FR 35577
SO2 (1971)Cuyahoga and Lucas Counties9/27/20037/8/2004, 69 FR 41342
SO2 (2010)Campbell-Clermont (Pierce Township in Clermont County)8/11/201511/21/2016, 81 FR 83159
SO2 (2010)Lake County4/9/20185/14/2019, 84 FR 21253
SO2 (2010)Steubenville OH-WV (partial Jefferson County)6/25/201911/29/2019, 84 FR 65683
CO (1979)Cleveland (Cuyahoga County)10/20/20056/1/2006, 71 FR 31097
Lead (2008)Bellefontaine (Logan County)10/29/20137/28/2014, 79 FR 43655Includes approval of the 10/29/2013 emissions inventory.
Lead (2008)Cleveland (partial Cuyahoga County)6/29/20165/31/2017, 82 FR 24871Includes approval of the 2013 lead base year emissions inventory and emission limits and PMP as RACM for the Ferro facility.
Lead (2008)Delta (partial Fulton County)4/27/20173/13/2018, 83 FR 10796Includes approval of the 2013 lead base year emissions inventory and Preventative Maintenance Plan as RACM/RACT for the Bunting Bearing LLC Delta facility.
Infrastructure Requirements
Section 110(a)(2) infrastructure requirements for the 1997 8-hour ozone NAAQSStatewide12/5/20077/13/2011, 76 FR 41075Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been remedied with a FIP.
Section 110(a)(2) infrastructure requirements for the 1997 PM2.5 NAAQSStatewide12/5/20077/13/2011, 76 FR 41075Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been remedied with a FIP.
Section 110(a)(2) infrastructure requirements for the 2006 PM2.5 NAAQSStatewide9/4/20095/10/2018, 83 FR 21719Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been disapproved and remedied with a FIP.
Section 110(a)(2) infrastructure requirements for the 2008 lead NAAQSStatewide10/12/201110/6/2014, 79 FR 60075Fully approved for all CAA elements.
Section 110(a)(2) infrastructure requirements for the 2008 ozone NAAQSStatewide12/27/20125/10/2018, 83 FR 21719Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been disapproved and remedied with a FIP.
Section 110(a)(2) infrastructure requirements for the 2010 NO2 NAAQSStatewide2/8/20135/10/2018, 83 FR 21719Fully approved for all CAA elements.
Section 110(a)(2) infrastructure requirements for the 2010 SO2 NAAQSStatewide6/7/20135/10/2018, 83 FR 21719No action has been taken on 110(a)(2)(D)(I). All other CAA elements have been approved.
Section 110(a)(2)(D) infrastructure requirements for the 2012 PM2.5 NAAQSStatewide12/4/20155/10/2018, 83 FR 21719Fully approved for all CAA elements.
Section 110(a)(2) infrastructure requirements for the 2015 ozone NAAQSStatewide9/28/20182/13/2023, 88 FR 9336Approved CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) prongs 3 and 4, (E), (F), (G), (H), (J), (K), (L), and (M). Elements (D)(i)(I) prongs 1 and 2 are disapproved.
Summary of Plan Element
Particulate Matter (PM-10) PlanStatewide11/14/19916/27/1994, 59 FR 27464
Summary of the 15 Percent (%) Rate of Progress (ROP) Plan Control Measures for Volatile Organic Compounds (VOC) Emissions
Cincinnati 15% PlanCincinnati (Butler, Clermont, Hamilton, and Warren Counties)3/19/19943/30/1998, 63 FR 4188
Visibility Protection
Regional Haze PlanStatewide11/30/20165/10/2018, 83 FR 21719Full Approval.
Regional Haze Five-Year Progress ReportStatewide3/11/201612/21/2017, 82 FR 60543
[80 FR 69606, Nov. 10, 2015] Editorial Note:For Federal Register citations affecting § 52.1870, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
authority: 42 U.S.C. 7401
cite as: 40 CFR 52.1870