You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup:
(a) The type(s) of waste to be burned;
(b) The maximum design waste burning capacity;
(c) The anticipated maximum charge rate;
(d) If applicable, the petition for site-specific operating limits under § 60.2115; and
(e) The anticipated date of initial startup.