Regulations last checked for updates: Oct 19, 2024

Title 43 - Public Lands: Interior last revised: Sep 06, 2024
§ 3175.134 - Transducer test reporting.

(a) Each test required by §§ 3175.131 through 3175.133 must be fully documented by the test facility performing the tests. The report must indicate the results for each required test and include all data points recorded.

(b) The report must be submitted to the PMT. If the PMT determines that all testing was completed as required by §§ 3175.131 through 3175.133, it will make a recommendation that the BLM approve the transducer make, model, and range, along with the reference uncertainty, influence effects, and any operating restrictions, and posts them to the BLM's website at www.blm.gov as an approved device.

authority: 25 U.S.C. 396d and 2107; 30 U.S.C. 189,306,359,and; and 43 U.S.C. 1732(b), 1733, and 1740
source: 81 FR 81421, Nov. 17, 2016, unless otherwise noted.
cite as: 43 CFR 3175.134