(a) Table 1 is a summary of the Sundry Notice requirements in this subpart.
Table 1 to Paragraph (a)—Notification Via Sundry Notice Requirements
Sundry notice requirements
| Reference
|
---|
Flaring of gas following removal of ≥50 percent of the natural gas liquids from the gas stream on-lease | § 3179.41(b)(12).
|
Other gas sample location for flare approved by the AO | § 3179.71(d)(3) and (e)(2).
|
Unavoidable/avoidable determination of loss of oil and/or gas while drilling for loss of well control event | § 3179.80.
|
Extension of time limit or volumetric limit for well completion or recompletion flaring, or exploratory coalbed methane dewatering flaring | § 3179.81(e).
|
Extension of time limit for well testing subsequent to initial completion | § 3179.82.
|
Within 45 days of start of an emergency, estimate the volume flared or vented beyond the first 48 hours of the emergency | § 3179.83(c).
|
Delay of leak repair beyond 30 calendar days with good cause | § 3179.101(b). |
(b) Table 2 summarizes the locations in this subpart that require an operator to provide information to the authorized officer upon request.
Table 2 to Paragraph (b)—Information Required at the Request of the AO
Information required at the request of the AO
| Reference
|
---|
Ultrasonic meter flare gas testing report | § 3179.71(c)(2)(i).
|
Ultrasonic meter manufacturer's specifications including installation and operation specifications | § 3179.71(c)(2)(ii).
|
Recordkeeping for vented or flared gas events | § 3179.72(c).
|
Recordkeeping for leak detection and repair | § 3179.102(a). |
(c) Table 3 summarizes the initial LDAR program submission and subsequent annual reporting.
Table 3 to Paragraph (c)—LDAR Program
Information required to be sent to the BLM State Office
| Reference
|
---|
First submission of a leak detection and repair program to the BLM for review | § 3179.100(b) and (d).
|
Annual review and update of the leak detection and repair program to the BLM | § 3179.100(e). |