Regulations last checked for updates: Oct 18, 2024

Title 43 - Public Lands: Interior last revised: Sep 06, 2024
§ 3275.13 - How must the facility operator measure the geothermal resources?

The facility operator must:

(a) Measure all production, injection and utilization in accordance with methods and standards approved by BLM (see § 3275.15);

(b) Maintain and test all metering equipment. If your equipment is defective or out of tolerance, you must promptly recalibrate, repair, or replace it; and

(c) Determine the amount of production and/or utilization in accordance with methods and procedures approved by BLM (see § 3275.17).

source: 72 FR 24400, May 2, 2007, unless otherwise noted.
cite as: 43 CFR 3275.13