In addition to the coverage described in § 63.5 of this part, relocation costs for which benefits are payable under section 1306(c) of the Act include the costs of:
(a) Removing the structure from the site,
(b) Site cleanup,
(c) Debris removal,
(d) Moving the structure to a new site, and
(e) At the new site, a new foundation and related grading, including elevating the structure as required by local flood plain management ordinances, and sewer, septic, electric, gas, telephone, and water connections at the building.