When table 1 references this section, the containment system must have a:
(a) Tank pressure gauge at the point where cargo flow is controlled during transfer; and
(b) Vapor return connection.
[CGD 73-96, 42 FR 49027, Sept. 26, 1977; 42 FR 57126, Nov. 1, 1977, as amended by CGD 81-078, 50 FR 21173, May 22, 1985]
authority: 46 U.S.C. 3703; Department of Homeland Security Delegation No. 0170.1. Section 153.40 issued under
49 U.S.C. 5103. Sections 153.470 through 153.491, 153.1100 through 153.1132, and 153.1600 through 153.1608 also issued under
33 U.S.C. 1903 (b)
source: CGD 73-96, 42 FR 49027, Sept. 26, 1977, unless otherwise noted.
cite as: 46 CFR 153.372