Regulations last checked for updates: Oct 17, 2024

Title 46 - Shipping last revised: Oct 15, 2024
§ 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

(a) The manufacturer may follow an independent laboratory's procedures for production inspections and tests if those procedures—

(1) Meet or exceed the production inspection and test requirements of the applicable subpart or are equivalent to those inspections and tests;

(2) Include labeling or marking the equipment or material when the equipment or material meets the inspection and test procedures of the laboratory; and

(3) Are accepted by the Commandant under § 159.007-7(b).

(b) [Reserved]

authority: 46 U.S.C. 3306,3703; 49 CFR 1.45, 1.46; Section 159.001-9 also issued under the authority of 44 U.S.C. 3507.
source: CGD 76-048, 44 FR 73043, Dec. 17, 1979, unless otherwise noted.
cite as: 46 CFR 159.007-3