Regulations last checked for updates: Nov 22, 2024

Title 46 - Shipping last revised: Nov 04, 2024
§ 167.45-50 - Foam smothering system requirements.

(a) When a foam-type system is fitted, its capacity shall be such as to rapidly discharge over the entire area of the bilge (tank top) of the largest boiler room a volume of foam 6 inches deep in not more than 3 minutes. The arrangement of piping shall be such as to give a uniform distribution over the entire area protected.

(b) The foam-type system may be of a type approved by the Navy or Coast Guard. All containers and valves by which the system is operated shall be easily accessible and so placed that control valves and containers will not readily be cut off from use by an outbreak of fire.

authority: 46 U.S.C. 3306,3307,6101,8105; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; DHS Delegation 00170.1, Revision No. 01.4
source: CGFR 51-11, 16 FR 3218, Apr. 12, 1951, unless otherwise noted.
cite as: 46 CFR 167.45-50