Regulations last checked for updates: Nov 22, 2024

Title 46 - Shipping last revised: Nov 04, 2024
§ 175.122 - Load lines.

A vessel of 24 meters (79 feet) in length or more, the keel of which was laid or that was at a similar stage of construction on or after July 21, 1968, and that is on a voyage other than a domestic voyage is subject to load line assignment, certification, and marking under subchapter E (Load Lines) of this chapter.

[CGD 85-080, 61 FR 947, Jan. 10, 1996, as amended by USCG-2014-0688, 79 FR 58288, Sept. 29, 2014]
authority: Authority: 46 U.S.C. 2103,3205,3306,3703; Pub. L. 103-206, 107 Stat. 2439; 49 U.S.C. 5103; DHS Delegation 00170.1, Revision No. 01.3, paragraph (II)(92)(a); § 175.900 also issued under 44 U.S.C. 3507
source: CGD 85-080, 61 FR 947, Jan. 10, 1996, unless otherwise noted.
cite as: 46 CFR 175.122