Regulations last checked for updates: Nov 25, 2024

Title 47 - Telecommunication last revised: Nov 20, 2024
§ 11.16 - National Control Point Procedures.

The National Control Point Procedures are written instructions issued by the FCC to national level EAS control points. The procedures are divided into sections as follows:

(a) National Level EAS Activation. This section contains the activation and termination instructions for the National Emergency Message.

(b) EAS Test Transmissions. This section contains the instructions for testing the EAS at the National level.

[59 FR 67092, Dec. 28, 1994, as amended at 67 FR 18508, Apr. 16, 2002; 87 FR 67823, Nov. 10, 2022]
source: 59 FR 67092, Dec. 28, 1994, unless otherwise noted.
cite as: 47 CFR 11.16