Regulations last checked for updates: Nov 24, 2024

Title 48 - Federal Acquisition Regulations System last revised: Nov 15, 2024
53.209-1 - 53.209-1 Responsible prospective contractors.

The following forms are prescribed for use in conducting preaward surveys of prospective contractors, as specified in 9.106-1, 9.106-2, and 9.106-4. These forms are authorized for local reproduction and can be found at the GSA Forms Library at https://www.gsa.gov/forms.

(a) SF 1403 (Rev. 01/2014), Preaward Survey of Prospective Contractor (General).

(b) SF 1404 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Technical.

(c) SF 1405 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Production.

(d) SF 1406 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Quality Assurance.

(e) SF 1407 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Financial Capability.

(f) SF 1408 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Accounting System.

[83 FR 42576, Aug. 22, 2018]
authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 4 and 10 U.S.C. chapter 137 legacy provisions (see 10 U.S.C. 3016); and 51 U.S.C. 20113.
source: 48 FR 42637, Sept. 19, 1983, unless otherwise noted.
cite as: 48 CFR 53.209-1