Regulations last checked for updates: Oct 18, 2024

Title 48 - Federal Acquisition Regulations System last revised: Oct 10, 2024
1425.202 - 1425.202 Exceptions.

(a)(1) The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.

(2) The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.

(3) For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.

(b) [Reserved]

authority: Sec. 205(c), 63 Stat. 390, 40 U.S.C. 486(c); and 5 U.S.C. 301.
source: 75 FR 19829, Apr. 15, 2010, unless otherwise noted.
cite as: 48 CFR 1425.202